| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.3 CrAccepted-Finance | ₹1.3 Cr | 1 | Accepted-Finance Financially Qualified |
| 2 | 2₹1.4 Cr+₹10.9 L (8.52%)Rejected-Finance | ₹1.4 Cr+₹10.9 L (8.52%) | 2 | Rejected-Finance Financially Disqualified |
Tender Value
₹1.6 Cr
EMD Value
₹3.1 L
Closing Date
18 Mar 2020, 3:00 pmClosed
Deputy General Manager (P)
NHIDCL, PMU-Gangtok (Sikkim)
Short Term Improvement of the road from Km 0.00 (Sirwani Bridge) to Km 3.00 (Dalep Turning) of NH510 in the of Sikkim on Item Rate Basis
2020_NHIDC_551397_1
NHIDCL/NH510/Maint/2020/01
Open Tender
Civil Works - Roads
Item Rate
90 days
South Sikkim
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Yes
General Manager (P), NHIDCL
₹3.1 L
21 Mar 2020
9 Mar 2020
19 Mar 2020
9 Mar 2020
18 Mar 2020
9 Mar 2020
Short Term Improvement
(GSB ) (Construction of granular subbase by Providing the material,mixing in a mechanical mix plant at OMC, carriage of mixed material to work site, spreading in a uniformlayers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) . For grading - III Material
Wet Mix Mecadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix mecadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/base course on well prepared surface and compacting with vibratoary roller to acheive the desired density.)
Prime Coat (i) Low Porosity Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of shown in 500-1using mechanicalmeans.)
Tack Coat (i) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate on the prepared Normal Bituminous/ Granular Surface cleaned with mechanical broom.) (i) Normal Bituminous Surface
40 mm thick Dense Graded Bituminous Macadam for undulation Bituminous Macadam (providing and laying bituminous macadam with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to required grade, level and alignment and rolled as per clause 501.6 and 501.7 to achieve the desired compaction) Grading –II (19mm nominal size)
30 mm thick Bituminous Concrete Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) (iii)for Grading-II ( 10 mm nominal size )
KK GROUP OF COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .