Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-Finance BHAGWATI NAGAR JAMMU | L1 | Accepted-Finance lowest | |
| 2 | L2₹1.7 L+₹5,750 (3.50%)Rejected-Finance GOLE GUJRAL JAMMU JAMMU | L2 | Rejected-Finance not lowest | |
| 3 | L3₹1.9 L+₹30,750 (18.7%)Rejected-Finance HOUSING COLONY UDHAMPUR | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L3 | Rejected-Finance not lowest | |
| 4 | L4₹2.2 L+₹53,750 (32.7%)Rejected-Finance NOT AVAILABLE | L4 | Rejected-Finance not lowest | |
| 5 | L5₹2.2 L+₹55,250 (33.6%)Rejected-Finance | L5 | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | PERFECT ELECTRICAL WORKS L1 | M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS L3 | M/S GOPAL ELECTRICAL L2 | ROYAL ENGINEERING ENTERPRISES L5 | N B Engineering and Electric Works L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Restoration of flood hit pumping machinery by Repair/servicing/rewinding of 3 no.s motors and 200 KVA voltage stabilizer along with allied works at LIS Rattanpur paras. | ||||||||
| 1.01 | Restoration of flood hit pumping station L.I.S Rattanpur Paras by way of disconnecting the cables of 3no., (20H.P, 40 HP and 40HP)motors from starters and then dismantling with the help of tools & tackles/manual labour from base frame and HC pumps position and then shifting the same through manual head load and then loading with the help of manual labour/chain pulley block in mechanical transport for further shifting to the workshop. Unloading at the workshop for repairs/reconditioning/rewinding of the motors. Dismantling of 3no., (20H.P, 40 HP and 40HP)motors at workshop and then extraction of rotor from stator and complete repair/rewinding whichever applicable for the 3no. motors with new copper wires of requisite gauge and specifications of standard make. Providing/fitting of new insulation, packing material, then varnishing with superior quality varnish & drying in oven in controlled temperature.. Extraction of bearings from their housings and cleaning by diesel after removing silt/dirt from bearings. Repairs to rotor of motors by Providing/fitting of 2no. bearings wherever required to the each motors at D.E and NDE as per samples after rebuilding of the rotor shaft as per requirement of motor and finishing to bearing sizes Refitting bearings in housings, greasing properly. Back carriage to site after repairs and reinstallation by making connections of motor and testing on idle and full load conditions. Also repair/rewinding to 5HP motor of priming pump by way of complete rewinding with new copper wires of requisite gauge and specifications of standard make. Cleaning of deposited silt from inside the priming pump with the help of suitable chemical. Providing/fitting of new insulation, packing material, then varnishing with superior quality varnish & drying in oven in controlled temperature. Job includes cost of material, rebate to be quoted on old copper scrap and labour charges with hiring charges of tools & tackles.
Servicing/reconditioning/repair of 200 amp control panel of LIS Rattanpur paras by disconnecting all the electrical connection and then cleaning/servicing of all the contactors and relays with suitable chemicals. Repair of electrical connection of all the contactors and relays wherever required after proper checking for smooth operation. Making of all the electric connections after proper checking of control panel in working condition. Complete job includes cost of material used, transportation charges and labour charges for skilled /semiskilled labour to be employed at site for execution of job including the out station charges etc.
Replacement of the wornout components of the 200KVA voltage stabilizer of LIS Rattanpur paras. Job includes disconnecting all the electrical connections of the stabilizer both on LT transformer side and LT distribution panel side by way of removing old rusted thimbles along with nuts and bolts. Shifting of the stabilizer to the nearest roadside by manual head load and loading of the same in the transport vehicle for further carriage to the workshop by employing hydraulic crane and manual labour at site. Replacement of the wornout components of the voltage stabilizer at workshop by way of removing its top cover for extraction of inner assembly from the casing sump. Providing and Fitting of new 01 nos. copper coils of requisite size and specifications, new insulation material and nuts/bolts, varnishing drying in hot air circulation.. Job also includes draining out the old T Oil which is mixed with flood water from the voltage stabilizer cleaning and de-mosturising of the stabilizer casing, providing and filling of fresh transformer oil 250 lts approx.. Lowering of the coils inside the casing Providing and fitting of nuts/bolts and complete reassembling of the stabilizer at workshop. Shifting back the voltage stabilizer to the site. Unloading the same at site employing hydraulic crane/manual labour and shifting by manual head load into the pump room for re-installation. Reinstallation of the voltage stabilizer in the pump room by fixing all the electrical connections, providing/fitting of new nuts/bolts. Testing of the 200 KVA voltage stabilizer on partial load and then on full load at site. Complete job includes cost of materials, hydraulic crane charges, cost of rebate on account of old copper scrap, skilled/semi skilled labour charges and tools and tackles required during the execution of the job | 1 | Job | 1,64,250 ₹1,64,250 Lowest | 1,95,000 ₹1,95,000 | 1,70,000 ₹1,70,000 | 2,19,500 ₹2,19,500 | 2,18,000 ₹2,18,000 |
| 1.02 | Rebate on Old Parts | 1 | Job | -4,928 ₹-4,928 | -5,850 ₹-5,850 | -3,400 ₹-3,400 | -4,370 ₹-4,370 | -4,360 ₹-4,360 |
Tender Value
₹2.2 L
EMD Value
₹4,380
Closing Date
9 Sept 2025, 2:00 pmClosed
XEN MID JAMMU
mid jammu
Restoration of flood hit pumping machinery by Repair/servicing/rewinding of 3 no.s motors and 200 KVA voltage stabilizer along with allied works at LIS Rattanpur paras.
2025_IFC_286721_1
MID/J/e-NIT/2025-26/59
Open Tender
Repair and Maintenance Works
Item Wise
10 days
rattanpur paras
as per tender notice , boq and sbd
8 documents required · 8 mandatory
₹200
Executive Engineer MID JAMMU
₹4,380
15 Oct 2025
3 Sept 2025
10 Sept 2025
3 Sept 2025
9 Sept 2025
3 Sept 2025
Restoration of flood hit pumping machinery by Repair/servicing/rewinding of 3 no.s motors and 200 KVA voltage stabilizer along with allied works at LIS Rattanpur paras.
Restoration of flood hit pumping station L.I.S Rattanpur Paras by way of disconnecting the cables of 3no., (20H.P, 40 HP and 40HP)motors from starters and then dismantling with the help of tools & tackles/manual labour from base frame and HC pumps position and then shifting the same through manual head load and then loading with the help of manual labour/chain pulley block in mechanical transport for further shifting to the workshop. Unloading at the workshop for repairs/reconditioning/rewinding of the motors. Dismantling of 3no., (20H.P, 40 HP and 40HP)motors at workshop and then extraction of rotor from stator and complete repair/rewinding whichever applicable for the 3no. motors with new copper wires of requisite gauge and specifications of standard make. Providing/fitting of new insulation, packing material, then varnishing with superior quality varnish & drying in oven in controlled temperature.. Extraction of bearings from their housings and cleaning by diesel after removing silt/dirt from bearings. Repairs to rotor of motors by Providing/fitting of 2no. bearings wherever required to the each motors at D.E and NDE as per samples after rebuilding of the rotor shaft as per requirement of motor and finishing to bearing sizes Refitting bearings in housings, greasing properly. Back carriage to site after repairs and reinstallation by making connections of motor and testing on idle and full load conditions. Also repair/rewinding to 5HP motor of priming pump by way of complete rewinding with new copper wires of requisite gauge and specifications of standard make. Cleaning of deposited silt from inside the priming pump with the help of suitable chemical. Providing/fitting of new insulation, packing material, then varnishing with superior quality varnish & drying in oven in controlled temperature. Job includes cost of material, rebate to be quoted on old copper scrap and labour charges with hiring charges of tools & tackles. Servicing/reconditioning/repair of 200 amp control panel of LIS Rattanpur paras by disconnecting all the electrical connection and then cleaning/servicing of all the contactors and relays with suitable chemicals. Repair of electrical connection of all the contactors and relays wherever required after proper checking for smooth operation. Making of all the electric connections after proper checking of control panel in working condition. Complete job includes cost of material used, transportation charges and labour charges for skilled /semiskilled labour to be employed at site for execution of job including the out station charges etc. Replacement of the wornout components of the 200KVA voltage stabilizer of LIS Rattanpur paras. Job includes disconnecting all the electrical connections of the stabilizer both on LT transformer side and LT distribution panel side by way of removing old rusted thimbles along with nuts and bolts. Shifting of the stabilizer to the nearest roadside by manual head load and loading of the same in the transport vehicle for further carriage to the workshop by employing hydraulic crane and manual labour at site. Replacement of the wornout components of the voltage stabilizer at workshop by way of removing its top cover for extraction of inner assembly from the casing sump. Providing and Fitting of new 01 nos. copper coils of requisite size and specifications, new insulation material and nuts/bolts, varnishing drying in hot air circulation.. Job also includes draining out the old T Oil which is mixed with flood water from the voltage stabilizer cleaning and de-mosturising of the stabilizer casing, providing and filling of fresh transformer oil 250 lts approx.. Lowering of the coils inside the casing Providing and fitting of nuts/bolts and complete reassembling of the stabilizer at workshop. Shifting back the voltage stabilizer to the site. Unloading the same at site employing hydraulic crane/manual labour and shifting by manual head load into the pump room for re-installation. Reinstallation of the voltage stabilizer in the pump room by fixing all the electrical connections, providing/fitting of new nuts/bolts. Testing of the 200 KVA voltage stabilizer on partial load and then on full load at site. Complete job includes cost of materials, hydraulic crane charges, cost of rebate on account of old copper scrap, skilled/semi skilled labour charges and tools and tackles required during the execution of the job
Rebate on Old Parts
M/S GOPAL ELECTRICAL (BID ID -2488771)
M.S J K HYDRAULIC ENGGG AND FABRICATOR WORKS (BID ID -2488628)
N B Engineering and Electric Works (BID ID -2488196)
ROYAL ENGINEERING ENTERPRISES (BID ID -2488677)
PERFECT ELECTRICAL WORKS
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .