Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹37.8 L
EMD Value
₹3.2 L
Closing Date
5 Jun 2026, 1:00 pmClosed
executive officer
npp jalalpur ambedkar nagar
nagar palika parishad jalalpur ke m.r.f. center me wet best compostik unit ka nirman kary
2026_DOLBU_1149522_1
128/nppj/2026-27 date 12-05-2026
Open Tender
Civil Works
Fixed-rate
npp jalalpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,300
E.O.NPP
₹3.2 L
npp jalalpur
23 Jun 2026
16 May 2026
5 Jun 2026
16 May 2026
5 Jun 2026
16 May 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Jungle including uprooting of Trunk vegetations,grass, bush, wood trees and saplings of girth upto 30 cm. measured at a height of 1 metre above ground level & removal of rubbish upto a distance of metres out side | - | Sqm | 12 | - |
| 2 | E/w excavation in foundaton in ordinary soil as per S.I. No-251 | 1 | cum | 125 | ₹124.88 |
| 3 | P/L.C.C.in 1:4:8 in foundation with cement fine sand & 40mm gauge b/ballast as per S.I.No 275. | - | cum | 4,350 | - |
| 4 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth | 1 | cum | 5,399.11 | ₹5,393.71 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (M-20) (1 cement: 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | 8,400 | - |
| 6 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapping and hookes: As per S. No. 504 | 1 | Qtl | 7,500 | ₹7,492.5 |
| 7 | Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastages and over lapping and hookes. As per S.I No. 504 | 1 | Kg | 98.79 | ₹98.69 |
| 8 | Plaster work in 1:3 cement & f/sand mortar as per S.I.No-582 | - | Sqm | 168 | - |
| 9 | Providing and appling Plaster of parise Putty of 2 mm thikness over Plastered surface to perpare the surface even and smooth Complete | - | Sqm | 198.86 | - |
| 10 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 Itr/10 sqm of approved brand and manufacture DSR 2023, 13.48.3 | - | Sqm | 129.22 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
Tendernotice_2.pdf
PDF • 1.08 MB
BOQ_2151984.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .