| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.1 LAccepted-AOC | ₹94.1 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹94.7 L+₹63,883.47 (0.68%)Rejected-AOC GANAKPARA CITY TOWN UDALGURI P O BHOLABARI P S KALAIGAON DIST UDALGURI ASSAM PIN 784525 | DARRANG | ASSAM | 784525 | ₹94.7 L+₹63,883.47 (0.68%) | L2 | Rejected-AOC Not Awarded |
| 3 | Rejected-Technical | - | - | Rejected-Technical EMD NOT Submitted |
Tender Value
₹94.8 L
EMD Value
₹1.9 L
Closing Date
12 Mar 2021, 3:00 pmClosed
Project Director, DRDA, Udalguri.
O/o the Project Director, DRDA, Udalguri.
Construction of Bishnu Rabha Cultural Multi Complex at Doulchuba, Bhergaon under Panery LAC in Udalguri District for the year 2020-21. (G plus 2 Provision).
2021_BoTC_21546_1
DRDA/Udl/01/2021 - 01/05
Open Tender
Civil Works
Works
180 days
UDALGURI
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,000
Principal Secretary, BTC
₹1.9 L
Yes
29 Sept 2021
27 Feb 2021
12 Mar 2021
27 Feb 2021
12 Mar 2021
27 Feb 2021
27 Feb 2021 - 12 Mar 2021
Amount
GROUND FLOOR Plint area of buildingas per pain of ground floor 24.40m x 11.24m = 274.26m @ Rs. 13349.00/sqm
For normal preperation of site @ 1% of cost of B.C.
For sanitary water supply @ 8% of cost of B.C.
For internal water supply @5% of cost of B.C.
For internal road, p path, fencing etc. @ 2.5% of civil work
For internal Electrification @9% of cost of B.C.
For external Electrification @ 4% of cost of B.C.
For concealed wiring @0.75% of cost of B.C.
Fro campus lighting with sub-station and H.T line @2.50% of civil work
For landscaping @1% of cost of B.C.
For fireg with hydrant system @2.5% of civil works
For weather coat external finish @1% of civil works
For motor pump set including energisation @0.50% of cost of B.C.
For Ramp provision @0.50% of civil works
For white ant treatment @Rs. 325.00/sqm of plinth area
For Aluminium casement window@ Rs.100.00/sqm of floor area
For extra for every 300mm in plint height beyond normal height of 750mm @ Rs. 280.00/sqm of floor area
Extra for sub soil inverstigation @1% of cost of B.C.
Extra for Consultancy charge @2.95% of cost of B.C.
Extra for Vitrified floor tiles @Rs. 1300.00/sqm of floor area
Construction of Earth filling in low site
Construction of Boundary wall 1.80m ht. Total Length = 64.16 sqm
Construction of Heavy Duty Iron Gate
FIRST FLOOR Plint area of building as per plan of first floor = 190.97 sqm @ Rs. 10216.00/sqm of plinth area
For sanitary installation @ 8% of cost of B.C.
For internal water supply @5% of cost of B.C.
For internal Electrification @9% of cost of B.C.
For external Electrification @4% of cost of B.C.
For concealed wiring @0.75% of cost of B.C.
For Fireg with hydrant system @2.5% of cost of Civil Works
For weather coat external finish @1% of cost of Civil Works
For Aluminium casemet window @100.00/ sqm of floor area Approx - 274.26
LANKESWAR RABHA
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .