| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.8 LAdmitted-Fee/PreQual/Technical/Finance | -38.99% | ₹24.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹25.3 L+₹49,524.57 (2.00%)Admitted-Fee/PreQual/Technical/Finance | -37.77% | ₹25.3 L+₹49,524.57 (2.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹25.6 L+₹80,781.88 (3.26%)Admitted-Fee/PreQual/Technical/Finance | -37.00% | ₹25.6 L+₹80,781.88 (3.26%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹27.2 L+₹2.4 L (9.83%)Admitted-Fee/PreQual/Technical/Finance | -32.99% | ₹27.2 L+₹2.4 L (9.83%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹28.0 L+₹3.2 L (13.1%)Admitted-Fee/PreQual/Technical/Finance | -31.00% | ₹28.0 L+₹3.2 L (13.1%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹40.6 L
EMD Value
₹81,180
Closing Date
3 Sept 2026, 4:00 pmClosed
EXEN CRD SMC
EXEN CRD SMC
Repair and renovation of road at Iram Colony Budshah Nagar Sector H AND Sector L for p/l of CC Pavement.
2026_HAUDD_322254_1
ENIT/56/CRD/SMC/DT.25-08-2026
Open Tender
Civil Works
Percentage
30 days
BUDSHAH NAGAR
REFER TENDER DOCS
2 documents required · 2 mandatory
₹1,100
MUNICIPAL ACCOUNT
₹81,180
8 Sept 2026
25 Aug 2026
5 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 20 | No. | 20 | ₹400 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated material and carriage and disposal of surplus excavated material as directed beyond a lead of 50mtrs. by mechanical transport complete. | 132 | Cum | 187.3 | ₹24,723.6 |
| 3 | Providing and laying stone soling, duly hand-packed and properly rammed, including dressing, levelling, labour, materials and all costs of loading, unloading and carriage, complete in all respects as directed by the Engineer-in-Charge. | 306.6 | Cum | 900 | ₹2,75,940 |
| 4 | P/L, in position cement concrete of specified grade including curing but excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all inclusive leads, lifts, loading, un-loading, head load (if any) cost and carriage of material involved complete. | 153.3 | Cum | 5,500 | ₹8,43,150 |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) all inclusive leads, lifts, loading, unloading, head load (if any) costs and carraiges complete. | 306.6 | Cum | 7,500 | ₹22,99,500 |
| 6 | Steel Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete. (TMT Bars) (Dowel Bars). | 2,260.3 | Kgs | 123.2 | ₹2,78,468.96 |
| 7 | Providing, laying and placing in position 25mm dia PVC pipes of (Prince Make or eq.) of Class Type-B including all fixtures/ fittings and connecting the same to drains including trench excavation, leveling in desired slope, refilling the material as directed by site incharge complete. | 339.48 | RM | 100 | ₹33,948 |
| 8 | Providing, laying and placing in position 150mm dia PVC pipes of (Prince Make or eq.) of Class Type-B including all fixtures/ fittings and connecting the same to drains including trench excavation, leveling in desired slope, refilling the material as directed by site incharge complete. | 360 | RM | 638 | ₹2,29,680 |
| 9 | Centering & Shuttering including strutting propping etc. and removal form work for foundation, footings bases of columns blocks etc. complete. | 256.96 | Sqm | 286.35 | ₹73,580.5 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_1079375.xls
BOQ • 0.29 MB
56NITCIVILEXT1ST.pdf
PDF • 0.92 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .