Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance THIKSAY | ₹5.9 L | L1 | Accepted-Finance successfully quoted lowest rate |
| 2 | L2₹6.0 LAccepted-Finance R O NANG | ₹6.0 L | L2 | Accepted-Finance quoted high rate |
| 3 | L3₹6.2 LAccepted-Finance STAKMO | ₹6.2 L | L3 | Accepted-Finance quoted high rate |
| 4 | L4₹6.2 LAccepted-Finance CHUCHOT | ₹6.2 L | L4 | Accepted-Finance quoted high rate |
| 5 | L5₹6.4 LAccepted-Finance | ₹6.4 L | L5 | Accepted-Finance quoted high rate |
Tender Value
₹10.2 L
EMD Value
₹20,000
Closing Date
20 Jan 2026, 2:00 pmClosed
Executive Engineer REW Leh
REW Leh
Construction Of Concrete Revetment On Nang Village Stream At Rabirpur
2026_RDD_18291_1
142- UTL REW Leh of 2025-26
Open Tender
Civil Works - Others
30 days
Leh
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Payable To Executive Engineer REW Leh
₹20,000
18 Feb 2026
6 Jan 2026
22 Jan 2026
6 Jan 2026
20 Jan 2026
6 Jan 2026
Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kind of soils
Earth work in excavation by mechanical means (Hydraulic excavator) in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kind of soil.
Providing and laying of soiling stone including the cost of stone in horizontal on level.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 gradedstone aggregate 40 mm nominal size derived from natural sources)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Cement an average lead of 20 km
Sand an avg lead of 10 km
Stone Agg an avg lead of 10 km
Stone an avg lead of 10 km
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.94 MB
BOQ_44116.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid