| 1 | L1₹2.6 LAccepted-AOC NAI SARAI RAMGARH CANTT DISTT RAMGARH PIN 829122 | RAMGARH | JHARKHAND | 829122 | ₹2.6 L | L1 | Accepted-AOC L1 |
| 2 | Rejected-Technical AT SAYAL SAYAL DISTT RAMGARH JH | NA | NA | 825101 | - | - | Rejected-Technical As per TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per TCR |
| Sl No | Description | Qty | Unit | M/S R N ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | A. 160KVA,33KV/440V Transformer, SI. NO. 150/2, Make T and E(I) Ltd. Cost of LT bushing stud with nut washer | 4 | No. | 10,444 ₹41,776 Lowest |
| 2.00 | Cost of HT bushing stud with nut washer | 3 | No. | 11,424 ₹34,272 Lowest |
| 3.00 | Cost of Cork sheet | 3 | No. | 2,426 ₹7,278 Lowest |
| 4.00 | Breather with slica gel | 1 | No. | 10,880 ₹10,880 Lowest |
| 5.00 | GI pipe with accessories | 1 | No. | 2,774 ₹2,774 Lowest |
| 6.00 | Complete painting and cleaning of transformer | 1 | No. | 7,072 ₹7,072 Lowest |
| 7.00 | Installation Charge | 1 | No. | 14,547 ₹14,547 Lowest |
| 8.00 | Other Overhead and profit | 1 | No. | 11,860 ₹11,860 Lowest |
| 9.00 | B. 3MVA, 11KV/3.3KV Transf, SI. No. KS/3000/23/3, Make KS Powertronics Pvt. Ltd. Cost o f Cork Sheet | 4 | No. | 2,426 ₹9,704 Lowest |
| 10.00 | Breather with slica gel | 1 | No. | 10,880 ₹10,880 Lowest |
Tender Value
₹2.8 L
EMD Value
₹3,500
Closing Date
3 Oct 2025, 3:00 pmClosed
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP, Barka Sayal Area, Pin-825311
On site repairing and maintenance of safety device connected in 3 MVA 11kV/3.3KV power transformer and 160KVA 3.3KV/440V station transformer at 33KVSubstation under Urimari OCP.
2025_CCL_344424_1
PE(EnM)/Urimari/e Tender/25-26/27
Open Tender
Electrical and Maintenance Works
Item Wise
10 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹3,500
4 Sept 2026
22 Sept 2025
4 Oct 2025
23 Sept 2025
3 Oct 2025
23 Sept 2025
23 Sept 2025 - 30 Sept 2025
Amount
A. 160KVA,33KV/440V Transformer, SI. NO. 150/2, Make T and E(I) Ltd. Cost of LT bushing stud with nut washer
Cost of HT bushing stud with nut washer
Cost of Cork sheet
Breather with slica gel
GI pipe with accessories
Complete painting and cleaning of transformer
Installation Charge
Other Overhead and profit
B. 3MVA, 11KV/3.3KV Transf, SI. No. KS/3000/23/3, Make KS Powertronics Pvt. Ltd. Cost o f Cork Sheet
Breather with slica gel
GI pipe with accessories
Cost of LT bushing stud with nut washer
Emergency lock switch
Cable 2.5 sq mm 4 core
Cost of buzzer
Auxiliary contactor 110V AC
Complete painting and cleaning of transformer
Installation Charge
Other Overhead and expenses
Total impact of GST for the purpose of CTC
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .