Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.2 LAccepted-Finance | 1 | Accepted-Finance Based on the BOQ | |
| 2 | 2₹35.3 L+₹2.1 L (6.27%)Accepted-Finance | 2 | Accepted-Finance Based on the BOQ |
Tender Value
₹33.9 L
EMD Value
₹34,000
Closing Date
31 May 2022, 3:00 pmClosed
Project Director
1st floor, DRDA, Integrated office complex, RD and PR, Theni
Strengthening of Pitchangarai road to Melapparavu road Km 0/0-1/32 (Waste plastic) in Bodinaickanur Block of Theni District under Tamilnadu Rural Roads Improvement Scheme 2021-22 Additional
2022_RDTN_232436_1
4101/2021/D4 Dated 12.05.2022
Open Tender
Civil Works - Roads
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹34,000
1st floor, DRDA, Theni
31 Jan 2023
16 May 2022
31 May 2022
16 May 2022
31 May 2022
24 May 2022
24 May 2022
Amount
Clearing Scrub Jungle with uprooting including all cutting charges and depositing of the products and clearing as directed by the departmental officers including all labour charges etc., complete.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A- Carted earth
Picking the existing metal surface 7.5 cm much removing the picked up stuff to the sides, collection all useful metal leveling and sectioning top camper power roller ansolidation by power roller etc.,
Providing and laying 75mm compacted thick WBM Grade III using 1 cum of 63mm to 11.20mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for TOP LAYER
Applying tack coat over the WBM. surface using Emulsion Bitumen of 4.00 kgs/10 sqm including cost of buituminous emnulsion which will be supplied departmentally at sectiojn stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual workspot handling charges for brushing cleaning and including labour chartes for preparing the surface for laying tackcoat and labour for applying the requikred quantity of bitumen emulsion using towed or self propelled bitumen pressure sprayer charges for rools and plants employed for the working including all other incidental charges such as barricading and providing danger light flags, etc., complete as per standard specification No. 503 of MOST - 10 sqm
Providing and laying Premix Carpet with Seal Coat Type -A to 20mm thick using 0.18cum of 13.2mm, 0.09 cum of 11.20mm and .09cum of 6.70mm with 23.232 Kgs of VG 30 Bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in Central Hot Mix Plant 20-30T capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 20mm with mechanical paver to the specified grades and cross section and consolidated by 8-10T vibratory/pneumatic roller to the required density etc., including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc., complete .
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms.
Supplying and Fixing of KM stone
Supplying and Fixing of HM stone
Provision for 60cm Equilatral triangle sign board
60cm x 45cm Rectangular board
Provision for steel name board
1.5m span culvert Ch. 0/320 ( Sub Estimate -1)
Earth Work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Centering and shuttering charges for Culvert side work including cost and conveyance of all labour charges
Cement concrete 1:3:6 mix using 40mm ISS metal fincluding cost and conveyance of all materials to site and all labour charges for mixing laying and curing etc., completed for foundation.
Supply and errection of Centering for sides and soffits with M.S.Sheet and country Wood Props including hire charges for materials and all labour charges etc., complete
Supply and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting, bending,tying and forming grills for all works
CC 1:2:4 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
RCC 1:1 1/2 :3 mix using 20 mm ISS metal including cost and conveyance if all materials to site and all labour charges for mixing laying finishing and curing etc., completed.
Supply and filling of Red gravel from local quary with average lead of 1 Km including cost of meterails to side and all other labour charges as per standard specification etc.
Towards the cost of Bitumen Pad for Expansion Joint
Towards the cost of Tar paper
Towards the cost of PVC Pipes for Weepholes
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
J. Vasanth
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .