Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹46.0 LAccepted-AOC PLOT NO 41 52 INDUSTRIAL AREA N I T FARIDABAD 121001 | FARIDABAD | FARIDABAD | HARYANA | 121001 | L-1 | Accepted-AOC LOWEST EVALUATED BIDDERS | |
| 2 | L-2₹49.6 L+₹3.5 L (7.69%)Rejected-Finance 10 KIRPAL APARTMENT 44 I P EXTENSION DELHI | DELHI | DELHI | DELHI | 110092 | L-2 | Rejected-Finance NOT L-1 BIDDERS | |
| 3 | L-3₹52.0 L+₹6.0 L (13.0%)Rejected-Finance B M 27 NEHRU NAGAR BHOPAL M P 462003 | BHOPAL | BHOPAL | MADHYA PRADESH | 462003 | L-3 | Rejected-Finance NOT L-1 BIDDERS | |
| 4 | Rejected-Technical 235 SURANGANI SURANGANI CHAMBA CHAMBA HIMACHAL PRADESH 176317 | CHAMBA | HIMACHAL PRADESH | 176317 | - | Rejected-Technical Disqualified |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
15 Dec 2020, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Sr. Manager PnC
Sr. Manager, Procurement and Contract, Chamera Power Station-I, Khairi, Distt Chamba (HP)-176325
Checking of rotor level and Shaft alignment after replacement of spring mattress/thrust pad and repair of upper bracket and stator frame and correction of rotor leveling and shaft alignment
2020_NHPC_599045_1
NH/CPS-I/PnC/W-1251/20-21/1087
Open Tender
Miscellaneous Works
Works
30 days
CPS-1 Khairi
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
NHPC Limited
₹1.3 L
Yes
17 Jun 2021
25 Nov 2020
18 Dec 2020
25 Nov 2020
15 Dec 2020
25 Nov 2020
120 days
Checking of rotor level & shaft alignment after replacement of spring mattress/thrust pad and repair of upper bracket & stator frame and correction of rotor level & shaft alignment (if require) after Dismantling and Assembly of Rotor & Thrust Bearing Housing of Hydro Generator of Unit-2. This activity is divided in following step/items: A. Checking of rotor level & shaft alignment after replacement of Thrust bearing spring mattress/thrust pads (Duration- 07 days – with round the clock working) B. Welding and grinding of cracks in Upper bracket in service bay and in-situ repair of cracks of stator frame (Duration- 08 days – with round the clock working) C. Correction of rotor level & shaft alignment (if required) after Dismantling and Assembly of Rotor & Thrust Bearing Housing (Duration 15 days – with round the clock working)
MULTITECH ENGINEERS
Purvanchal Engineering Projects
stage.html
html • 0.05 MB
technical_629386.pdf
PDF • 0.30 MB
techsummary_629386.pdf
PDF • 1.42 MB
finance_629386.pdf
PDF • 0.19 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_629386.pdf
PDF • 0.19 MB
LOA1233.pdf
PDF • 7.78 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .