GEMC-511687795140263
Awarded to AYAAN ENTERPRISES
₹43.8 L
Products
| Product | Brand / Model | HSN | Quantity | Unit Price | Amount |
|---|---|---|---|---|---|
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 1,572 | 15,720 |
| Supply and fixing of blower fan indoor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 5,764 | 28,820 |
| Supply and fixing of RELAY CONTRACTOR in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 1,100 | 1,100 |
| Installation and fixing of AC including loading AC from store and unloading the AC at site all complete as per direction of Eng.-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 787 | 787 |
| Supply and fixing of Compressor Mount Rubbers in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 262 | 262 |
| Supply and fixing of Motor starting capacitor of approved make all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 100 Each | 699 | 69,900 |
| Supply and fixing of COOLING COIL in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 2 Each | 8,384 | 16,768 |
| Supply and refilling of GAS REFRIGERANT R-410 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,305 | 11,525 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 60 Each | 890 | 53,400 |
| Cutting round hole by core drill machine 2.5 inch with necessary fittings and labour as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 104 | 104 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 366 | 366 |
| Supply and fixing of blower fan indoor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 8,500 | 42,500 |
| Supply and fixing of POWER CORD 4Core 2.5 sq.mm | AYAAN ENTERPRISES | - | 1 Each | 155 | 155 |
| Installation and fixing of AC including loading AC from store and unloading the AC at site all complete as per direction of Eng.-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 787 | 787 |
| Supply and fixing of Compressor Mount Rubbers in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 157 | 157 |
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 1,572 | 15,720 |
| Supply and fixing of COOLING COIL in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 6,288 | 31,440 |
| Supply and refilling of GAS REFRIGERANT R-410 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,934 | 14,670 |
| Supply and fixing of valve size of 5 by 8 inch for any type AC with fitting and labour all complete as per direction of engineer in charge | AYAAN ENTERPRISES | - | 10 Each | 1,500 | 15,000 |
| Supply and fixing of Tray of size for window ac 15 into 27 inch as per direction of engineer in charge. Including scaffolding for all height up to 15 mtr | AYAAN ENTERPRISES | - | 1 Each | 471 | 471 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 366 | 366 |
| Supply and fixing of Motor starting capacitor of approved make all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 100 Each | 838 | 83,800 |
| Supply and fixing of POWER CORD 4Core 2.5 sq.mm | AYAAN ENTERPRISES | - | 1 Each | 155 | 155 |
| Installation and fixing of AC including loading AC from store and unloading the AC at site all complete as per direction of Eng.-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 1,572 | 1,572 |
| Supply and fixing of Compressor Mount Rubbers in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 188 | 188 |
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 2,620 | 26,200 |
| Supply and fixing of compressor reciprocating new all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 15,196 | 75,980 |
| Supply and refilling of GAS REFRIGERANT R-410 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 10 Each | 2,934 | 29,340 |
| Supply and fixing of valve size of 3 by 8 inch any type AC with fitting and labour all complete as per direction of engineer in charge | AYAAN ENTERPRISES | - | 10 Each | 1,200 | 12,000 |
| Supply and fixing of Tray of size for window ac 15 into 27 inch as per direction of engineer in charge. Including scaffolding for all height up to 15 mtr | AYAAN ENTERPRISES | - | 1 Each | 471 | 471 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 366 | 366 |
| Supply and fixing of swing motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 628 | 6,280 |
| Supply and fixing of COOLING COIL in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 8,384 | 41,920 |
| Installation and fixing of AC including loading AC from store and unloading the AC at site all complete as per direction of Eng.-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 1,572 | 1,572 |
| Supply and fixing of copper piping with necessary fittings and labour all complete as per direction and in presence of Engineer-in-charge. | AYAAN ENTERPRISES | - | 100 Mtr | 800 | 80,000 |
| Supply and fixing of fan motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 2,233 | 22,330 |
| Supply and fixing of compressor reciprocating new all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 12,576 | 62,880 |
| Supply and fixing of POWER CORD 4Core 2.5 sq.mm | AYAAN ENTERPRISES | - | 1 Each | 155 | 155 |
| Supply and fixing of valve size of 1 by 2 inch the AC with fitting and labour all complete as per direction of engineer in charge | AYAAN ENTERPRISES | - | 10 Each | 1,050 | 10,500 |
| Supply and fixing of Tray of size for window ac 15 into 27 inch as per direction of engineer in charge. Including scaffolding for all height up to 15 mtr | AYAAN ENTERPRISES | - | 1 Each | 788 | 788 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 366 | 366 |
| Supply and fixing of swing motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 628 | 6,280 |
| Supply and fixing of COOLING COIL in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 1 Each | 17,000 | 17,000 |
| Supply and refilling of GAS REFRIGERANT R-410 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 10 Each | 3,668 | 36,680 |
| Supply and fixing of copper piping with necessary fittings and labour all complete as per direction and in presence of Engineer-in-charge. | AYAAN ENTERPRISES | - | 100 Mtr | 985 | 98,500 |
| Supply and fixing of fan motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 2,500 | 25,000 |
| Supply and fixing of compressor reciprocating new all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 15,196 | 75,980 |
| Supply and fixing of POWER CORD 4Core 2.5 sq.mm | AYAAN ENTERPRISES | - | 1 Each | 155 | 155 |
| Installation and fixing of AC including loading AC from store and unloading the AC at site all complete as per direction of Eng.-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 4,192 | 4,192 |
| Supply and fixing of Tray of size for window ac 15 into 27 inch as per direction of engineer in charge. Including scaffolding for all height up to 15 mtr | AYAAN ENTERPRISES | - | 1 Each | 788 | 788 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 1,572 | 1,572 |
| Supply and fixing of swing motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 838 | 8,380 |
| Supply and fixing of COOLING COIL in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 1 Each | 18,864 | 18,864 |
| Supply and refilling of GAS REFRIGERANT R-410 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 9,956 | 9,956 |
| Supply and fixing of valve size of 1 by 4 inch the AC with fitting and labour all complete as per direction of engineer in charge | AYAAN ENTERPRISES | - | 10 Each | 950 | 9,500 |
| Supply and fixing of fan motor indoor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 1,886 | 9,430 |
| Supply and fixing of compressor reciprocating new all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 37,000 | 185,000 |
| Supply and fixing of POWER CORD 4 Core 4 sq.mm | AYAAN ENTERPRISES | - | 1 Each | 293 | 293 |
| Installation and fixing of AC including loading AC from store and unloading the AC at site all complete as per direction of Eng.-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 4,401 | 4,401 |
| Supply and fixing of copper piping with necessary fittings and labour all complete as per direction and in presence of Engineer-in-charge. | AYAAN ENTERPRISES | - | 50 Mtr | 1,310 | 65,500 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 1,572 | 1,572 |
| Supply and fixing of swing motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 838 | 8,380 |
| Supply and fixing of Condenser Coil in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 2 Each | 7,336 | 14,672 |
| Supply and refilling of GAS REFRIGERANT R-410 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 13 Each | 9,956 | 129,428 |
| Supply and fixing of valve size of 3 by 4 inch in the AC with fitting and labour all complete as per direction of engineer in charge | AYAAN ENTERPRISES | - | 10 Each | 1,500 | 15,000 |
| Supply and fixing of rewinding of fan motor, indoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 838 | 838 |
| Supply and fixing of fan motor indoor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,096 | 10,480 |
| Supply and fixing of compressor reciprocating new all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 39,000 | 39,000 |
| Supply and fixing of POWER CORD 4 Core 4 sq.mm | AYAAN ENTERPRISES | - | 1 Each | 293 | 293 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 98 Each | 230 | 22,540 |
| Supply and fixing of copper piping with necessary fittings and labour all complete as per direction and in presence of Engineer-in-charge. | AYAAN ENTERPRISES | - | 50 Mtr | 1,310 | 65,500 |
| checking of the existing non working AC by qualified technician and detect the problem and submit the estimate for repairing the spare parts all complete as per direction of Eng. In Charge | AYAAN ENTERPRISES | - | 1 Each | 1,572 | 1,572 |
| Supply and fixing of swing motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 1,676 | 16,760 |
| Supply and fixing of Condenser Coil in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 2 Each | 9,432 | 18,864 |
| refilling of GAS REFRIGERANT R-32 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,305 | 11,525 |
| Supply and fixing of Solenoid valve size of the AC with fitting and labour all complete as per direction of engineer in charg | AYAAN ENTERPRISES | - | 1 Each | 2,096 | 2,096 |
| Supply and fixing of rewinding of fan motor, indoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 890 | 890 |
| Supply and fixing of fan motor indoor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 4,500 | 22,500 |
| Supply and fixing of compressor reciprocating new all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 44,016 | 44,016 |
| Supply and testing of NITROGEN in ACs all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 1,048 | 1,048 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 148 Each | 190 | 28,120 |
| Supply and fixing of Insulation with necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 62 | 62 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 1,257 | 12,570 |
| Supply and fixing of swing motor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 10 Each | 1,676 | 16,760 |
| Supply and fixing of Condenser Coil in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 2 Each | 7,336 | 14,672 |
| refilling of GAS REFRIGERANT R-32 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 10 Each | 2,934 | 29,340 |
| Supply and fixing of drain motor pump including necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 3,144 | 3,144 |
| Supply and fixing of rewinding of fan motor, indoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 1,500 | 1,500 |
| Supply and fixing of fan motor indoor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 4,716 | 23,580 |
| Supply and fixing of rotary compressor new in existing AC with necessary fittings and labour all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 9,432 | 47,160 |
| Supply and testing of NITROGEN in ACs all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 1,048 | 1,048 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 334 Each | 199 | 66,466 |
| Supply and fixing of Insulation with necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 73 | 73 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 1,572 | 15,720 |
| Supply and fixing of fan blade condenser in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 10 Each | 1,257 | 12,570 |
| Supply and fixing of Condenser Coil in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 2 Each | 9,432 | 18,864 |
| refilling of GAS REFRIGERANT R-32 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 20 Each | 2,934 | 58,680 |
| Supply and fixing of drain motor pump including necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 3,353 | 3,353 |
| Supply and fixing of rewinding of fan motor, indoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 1,500 | 1,500 |
| Supply and fixing of fan motor indoor in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 3,144 | 15,720 |
| Supply and fixing of rotary compressor new in existing AC with necessary fittings and labour all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 13,624 | 68,120 |
| Supply and testing of NITROGEN in ACs all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 1,257 | 1,257 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 340 Each | 199 | 67,660 |
| Supply and fixing of Insulation with necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 136 | 136 |
| Supply and fixing of fan blade condenser in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 10 Each | 1,257 | 12,570 |
| Supply and fixing of Condenser Coil in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 1 Each | 18,000 | 18,000 |
| refilling of GAS REFRIGERANT R-32 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 20 Each | 3,668 | 73,360 |
| Supply and fixing of drain motor pump including necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 3,353 | 3,353 |
| Supply and fixing of re-winding of fan motor, outdoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 838 | 838 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 1,572 | 15,720 |
| Supply and fixing of fan motor outdoor of approved make in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,620 | 13,100 |
| Supply and fixing of rotary compressor new in existing AC with necessary fittings and labour all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 9,432 | 47,160 |
| Supply and testing of NITROGEN in ACs all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 1,257 | 1,257 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 10 Each | 890 | 8,900 |
| Supply and fixing of Insulation with necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 136 | 136 |
| Supply and fixing of fan blade condenser in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. . | AYAAN ENTERPRISES | - | 5 Each | 1,414 | 7,070 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 1,886 | 18,860 |
| Supply and fixing of Condenser Coil in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 1 Each | 18,000 | 18,000 |
| refilling of GAS REFRIGERANT R-32 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 9,956 | 9,956 |
| Supply and fixing of drain sensor including necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 2,620 | 2,620 |
| Supply and fixing of re-winding of fan motor, outdoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 890 | 890 |
| Supply and fixing of rotary compressor new in existing AC with necessary fittings and labour all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 11,000 | 55,000 |
| Supply and fixing of fan motor outdoor of approved make in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,829 | 14,145 |
| Supply and testing of NITROGEN in ACs all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 2,620 | 2,620 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 90 Each | 890 | 80,100 |
| Supply and fixing of flexible pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 20 | 20 |
| Supply and fixing of Front Grill in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 1,572 | 1,572 |
| Supply and fixing of fan blade condenser in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 1,414 | 7,070 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 3,668 | 18,340 |
| refilling of GAS REFRIGERANT R-32 in ACs all complete in front direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 10 Each | 9,956 | 99,560 |
| Supply and fixing of drain sensor including necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 2,620 | 2,620 |
| Supply and fixing of re-winding of fan motor, outdoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 2,096 | 2,096 |
| Supply and testing of NITROGEN in ACs all complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 1 Each | 2,620 | 2,620 |
| Supply and fixing of running capacitor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 100 Each | 419 | 41,900 |
| Supply and fixing of fan motor outdoor of approved make in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 3,668 | 18,340 |
| Dry service of AC including taking out the AC and cleaning and re-fixing the AC all complete as per direction of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 60 Each | 890 | 53,400 |
| Supply and fixing of flexible pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 20 | 20 |
| Supply and fixing of Front Grill in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 2,096 | 2,096 |
| Supply and fixing of fan blade condenser in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 2,305 | 11,525 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 4,192 | 20,960 |
| Dismantling of Ac from site to store in DTU campus | AYAAN ENTERPRISES | - | 1 Each | 1,048 | 1,048 |
| Supply and fixing of High Pressure switch with necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 2,305 | 2,305 |
| Supply and fixing of re-winding of fan motor, outdoor all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 2,096 | 2,096 |
| Supply and refilling of GAS REFRIGERANT R-22 in ACs all complete in front of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,096 | 10,480 |
| Supply and fixing of running capacitor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 100 Each | 419 | 41,900 |
| Supply and fixing of fan motor outdoor of approved make in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 3,000 | 15,000 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 98 Each | 471 | 46,158 |
| Supply and fixing of flexible pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 41 | 41 |
| Supply and fixing of RELAY CONTRACTOR in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 681 | 681 |
| Supply and fixing of fan blade condenser in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 2,305 | 11,525 |
| Supply and fixing of New PCB in replacement, compitable with AC complete as per direction of Engineer-In-Charge | AYAAN ENTERPRISES | - | 5 Each | 4,716 | 23,580 |
| Dismantling of Ac from site to store in DTU campus | AYAAN ENTERPRISES | - | 1 Each | 1,048 | 1,048 |
| Supply and fixing Low Pressure switch with necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 2,305 | 2,305 |
| Supply and fixing of indoor for split ac complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 13,600 | 13,600 |
| Supply and refilling of GAS REFRIGERANT R-22 in ACs all complete in front of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 5 Each | 2,620 | 13,100 |
| Supply and fixing of running capacitor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 100 Each | 424 | 42,400 |
| Supply and fixing of fan motor outdoor of approved make in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 5 Each | 3,144 | 15,720 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 148 Each | 471 | 69,708 |
| Supply and fixing of flexible pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 41 | 41 |
| Supply and fixing of RELAY CONTRACTOR in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 733 | 733 |
| Supply and fixing of blower fan indoor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 1,572 | 7,860 |
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 786 | 7,860 |
| Dismantling of Ac from site to store in DTU campus | AYAAN ENTERPRISES | - | 1 Each | 1,467 | 1,467 |
| Supply and fixing of sensor for condenser or cooling coil with necessary fittings and labour all complete as per direction of Engineer-in-charge. | AYAAN ENTERPRISES | - | 1 Each | 838 | 838 |
| Supply and fixing of indoor for split ac complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 14,600 | 14,600 |
| Supply and refilling of GAS REFRIGERANT R-22 in ACs all complete in front of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 20 Each | 2,620 | 52,400 |
| Supply and fixing of running capacitor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 100 Each | 430 | 43,000 |
| Supply and fixing of Motor starting capacitor of approved make all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 100 Each | 419 | 41,900 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 334 Each | 490 | 163,660 |
| Supply and fixing of drain pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 31 | 31 |
| Supply and fixing of RELAY CONTRACTOR in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 838 | 838 |
| Supply and fixing of blower fan indoor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 2,096 | 10,480 |
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 838 | 8,380 |
| Dismantling of Ac from site to store in DTU campus | AYAAN ENTERPRISES | - | 1 Each | 1,886 | 1,886 |
| Supply and fixing of Compressor Mount Rubbers in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 157 | 157 |
| Supply and refilling of GAS REFRIGERANT R-22 in ACs all complete in front of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 20 Each | 3,144 | 62,880 |
| Supply and fixing of running capacitor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 100 Each | 650 | 65,000 |
| Supply and fixing of Motor starting capacitor of approved make all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 100 Each | 419 | 41,900 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 340 Each | 499 | 169,660 |
| Supply and fixing of drain pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 31 | 31 |
| Supply and fixing of RELAY CONTRACTOR in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 890 | 890 |
| Supply and fixing of blower fan indoor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 2,305 | 11,525 |
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 838 | 8,380 |
| Dismantling of Ac from site to store in DTU campus | AYAAN ENTERPRISES | - | 1 Each | 3,353 | 3,353 |
| Supply and fixing of Compressor Mount Rubbers in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 188 | 188 |
| Supply and refilling of GAS REFRIGERANT R-22 in ACs all complete in front of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 8,384 | 8,384 |
| Supply and fixing of running capacitor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 100 Each | 650 | 65,000 |
| Supply and fixing of Motor starting capacitor of approved make all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 100 Each | 455 | 45,500 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 10 Each | 1,414 | 14,140 |
| Supply and fixing of drain pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 57 | 57 |
| Supply and fixing of RELAY CONTRACTOR in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 1,100 | 1,100 |
| Supply and fixing of blower fan indoor in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 5 Each | 6,288 | 31,440 |
| Supply and fixing Repaired PCB in replacement all complete as per directions of Engineer-In-Charge | AYAAN ENTERPRISES | - | 10 Each | 890 | 8,900 |
| Dismantling of Ac from site to store in DTU campus | AYAAN ENTERPRISES | - | 1 Each | 3,353 | 3,353 |
| Supply and fixing of Compressor Mount Rubbers in existing AC with necessary fittings and labour all complete as per direction of engineer in charge. | AYAAN ENTERPRISES | - | 1 Each | 209 | 209 |
| Supply and refilling of GAS REFRIGERANT R-22 in ACs all complete in front of Engineer-In-Charge. | AYAAN ENTERPRISES | - | 1 Each | 8,384 | 8,384 |
| Supply and fixing of COOLING COIL in existing AC with necessary fittings and labour all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 2 Each | 6,288 | 12,576 |
| Supply and fixing of Motor starting capacitor of approved make all complete as per direction of Engineer In Charge. | AYAAN ENTERPRISES | - | 100 Each | 455 | 45,500 |
| Wet service of AC including taking out the AC and cleaning with chemical washing power and re-fixing the AC all complete as per direction of Engineer-In- Charge. | AYAAN ENTERPRISES | - | 90 Each | 1,414 | 127,260 |
| Supply and fixing of drain pipe with required size and necessary fittings and labour all complete as per direction of Engineer-in-charge | AYAAN ENTERPRISES | - | 1 Mtr | 57 | 57 |