Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.0 LAdmitted-Finance | -46.10% | ₹8.0 L | L1 | Admitted-Finance |
| 2 | L2₹8.6 L+₹59,066.49 (7.40%)Admitted-Finance | -42.11% | ₹8.6 L+₹59,066.49 (7.40%) | L2 | Admitted-Finance |
| 3 | L3₹11.6 L+₹3.6 L (45.3%)Admitted-Finance | -21.66% | ₹11.6 L+₹3.6 L (45.3%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical Non Responsive |
Tender Value
₹14.8 L
Closing Date
10 Jul 2026, 6:00 pmClosed
Executive Engineer Flood Control Division Poonch
Executive Engineer Flood Control Division Poonch
Construction of flood protection works on Poonch River Suran River Mendhar Nallah and Tributaries at damaged spots under SASCI Sub Division Poonch
2026_IFC_314579_1
e-NIT No 13 of 2026-27 Dated 04-07-2026
Open Tender
Civil Works
Percentage
45 days
Poonch
As Per NIT
2 documents required · 2 mandatory
₹29,608
Executive Engineer Flood Control Division Poonch
16 Jul 2026
4 Jul 2026
11 Jul 2026
4 Jul 2026
10 Jul 2026
4 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including
disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | - | Cum | 187.3 | - |
| 2 | Hand-packing stones in wire-crates; excluding cost of crates and stones | - | CUM | 371.15 | - |
| 3 | supply of stones | - | cum | 700 | - |
| 4 | Carriage of stones by 1 KM of MT | - | cum | 151.47 | - |
| 5 | Crates made of Mesh type 10x12 (D=100mm) Zn+PVC coated . Mesh wire diameter 2.70/3.70 mm (ID/OD) crates of sizes 6mx1.5x1.5 | - | m2 | 250 | - |
| 6 | Carriage of crates from an avg. lead of 230 km at site OF WORK. 76kg/crates | - | MT | 7,273.45 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.30 MB
BOQ_1018608.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .