Tender Value
₹73.7 L
EMD Value
₹5.7 L
Closing Date
29 Sept 2026, 12:00 pm7d left
SE BSR Circle PWD Bulandshahr
SE BSR Circle PWD Bulandshahr
Reconstruction work of the bridge located at km 1 of the Bulandshahr-Tajpur Road ODR in District Bulandshahr
2026_CEMRT_1187171_2
8877/96M/E-Tender/Bsr Circle/2026-27 Dt. 05.09.2026
Open Tender
Civil Works - Bridges
Percentage
180 days
Bulandshahar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,714
₹5.7 L
SE BSR Circle PWD Bulandshahr
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
22 Sept 2026 - 23 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. As per clause 202 including supply of all material,Labour, T&P all taxes royalty,labour cess etc, required for proper completion of work as per direction by the Engineer In charge. But Exc GST. | 350 | Cum | 903 | ₹3,16,050 |
| 2 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.including supply of all material,Labour, T&P all taxes royalty,labour cess etc, required for proper completion of work as per direction by the Engineer In charge. But Exc GST. | 320 | cum | 82 | ₹26,240 |
| 3 | Plain/Reinforced Cement Concrete complete (PCC Grade M15) in open foundation complete as per Drawing and Technical Specification Clause 1500,1700 & 2100 (Ch 12.8) including centering and shuttering etc, supply of all material,Labour, T&P all taxes royalty,labour cess etc, required for proper completion of work as per direction by the Engineer In charge But Exc GST. | 50 | cum | 6,518 | ₹3,25,900 |
| 4 | Plain/Reinforced Cement Concrete (RCC Grade M20) in open foundation complete as per Drawing and Technical Specification Clause 1500,1700 & 2100 (Ch12.08) including necessary centering and shuttering etc. supply of all material,Labour, T&P all taxes royalty,labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. | 20 | cum | 7,131 | ₹1,42,620 |
| 5 | Plain/Reinforced Cement Concrete (RCC Grade M25) in open foundation complete ( RCC Grade M25 using batching plant, transit mixer & manual placing) as per Drawing & Technical Specifications. including necessary centering & shuttering etc supply of all material,Labour, T&P all taxes royalty,labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. | 58 | cum | 7,507 | ₹4,35,406 |
| 6 | Reinforced Cement Concrete (M-25) in super-structure complete as per Drawing & Technical Specifications Clause 1500, 1600 & 1700 etc. complete as per SOR Ch. 6 S. No- 17 including centering & shuttering etc, supply of all material,Labour,T&P all taxes royalty , labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. (Super Structure) | 115 | cum | 7,608 | ₹8,74,920 |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications Clause 15.13 and MoRTH 1600. including supply of all material, Labour, T&P all taxes royalty, labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. | 16 | MT | 70,199 | ₹11,23,184 |
| 8 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications Clause 2702. including supply of all material, Labour, T&P all taxes royalty, labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. | 11.5 | Cum | 12,274 | ₹1,41,151 |
| 9 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 110 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications MORTH 13.08 (2706 & 2200) including supply of all material,Labour, T&P all taxes royalty, labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. | 54 | Nos | 403 | ₹21,762 |
| 10 | Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification clause 13.9 Complete as per drawing and Technical Specifications MORTH 13.08 (710.1.4.of IRC:78 & 2200) including supply of all material, Labour, T&P all taxes royalty, labour cess etc, required for proper completion of work as per direction by the Engineer In charge.But Exc GST. | 47 | cum | 1,026 | ₹48,222 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
T2.pdf
Tender Documents • 1.56 MB
BOQ_2235025.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .