Work in connection with CNB NI and other Miscellaneous P.way works in section of ADEN/Line/CNB.
CNBNI~NCR
CNBNI
Open
Works - General
9 Months
Prayagraj, Uttar Pradesh
₹0
₹3.2 L
26 Dec 2025
29 Nov 2025
12 Dec 2025
A-Work in connection with CNB NI and other Miscellaneous P.way Above/
B-Work in connection with CNB NI and other Miscellaneous P.way Above/
C-Work in connection with CNB NI and other Miscellaneous P.way Above/
Item- 01 IRUSSOR-2021 Items
S No. Item No Description of Item Unit Qty Rate Amount
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Dismantling and removing rail of all section
& length from track, laid on any type &
density of sleeper by removing fish plates,
fastenings & fish bolts and other materials
including stacking all released materials
within an average distance of 500 metres
as directed by Engineer in-charge. Note:
1.Cutting of rails shall be paid separately.
2.Work to be done under traffic block.
2 061022 For Casual/Scattered Rail Renewal work RM 2000.00 33.06 66120.00
Insertion of rails of all types & length in
track, laid on any type & density of sleeper
to the specified gauge under traffic block.
Rates include fastening of rail with sleepers
with standard set of fastenings and fixing of
fish plates and bolts or, if required,
providing gap for welding and stacking of
released material without infringement
within 250m as directed by Engineer-in-
Charge. Note: Rail drilling and cutting to be
paid separately.
4 061032 For Casual/Scattered Rail Renewal work RM 2000.00 34.99 69980.00
Through Sleeper Renewal (TSR) with PSC
sleepers involving removal existing
sleepers of any type along with fittings from
track, insertion of PSC sleepers lying along
the cess / formation / slope / toe within 5
metres height with all fittings to specified
spacing, gauge and squareness, one round
of through packing to make track fit for 20
kmph speed, dressing of ballast to standard
profile, all in accordance with the latest
provisions of IRPWM and stacking of all
released material neatly at specified places
within an average lead of 100 m as directed
by Engineer in-charge.
5 062011 For location of work not involving deep Each 1500.00 315.70 473550.00
6 062012 For location of work involving deep Each 2000.00 176.01 352020.00
screening (deep screening to be paid
Replacement of any type of sleepers in
track with PSC sleepers lying on cess or at
Bridge Approaches for casual renewal at
isolated locations with all fittings complete
to specified gauge & cross level with
contractor's tools including packing and
dressing of ballast, as directed by Engineer
in-charge. Released materials shall be
neatly stacked and handed over at
specified location within an average lead of
250 m or near either side of Bridge
approaches as directed.
7 062031 Locations other than Ballasted Deck Bridge Each 2000.00 438.94 877880.00
Fixing of fish plates with fish bolts on a joint
of all rail sections duly lubricating fish
plates/bolts with contractor's grease
graphite in running track condition
including transportation of fish plates and
fish bolts from nearest station / store / level
crossing. Note: Rail cutting & drilling to be
paid separately.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Lubrication of fish plated rail joints under
traffic, by using Grease Graphite Grade 'O'
(IS:408) and Black oil supplied by
contractor, for all types of rail sections as
per procedure laid down in latest version of
IRPWM and as directed by Engineer In
charge. Note: Release U/S bolt & nuts is to
be deposited back. If any fish bolts is
jammed it should be cut with chisel and
hammer and replaced with fresh fish bolt
12 063090 Lubrication of ERCs and its liner contact ERC 100000.00 3.83 383000.00
area by removal of ERCs and Metal / GFN
liners in rail panel, cleaning of rust / scale
of ERC, Metal / GFN liners & SGCI insert by
using wire brush, scrapper / sand emery
paper etc supply and application of graphite
grease, as prescribed by Railway for under
side of liners & corresponding area of rail
foot & SGCI insert with ERCs and re-fixing
the same as per procedure prescribed in
latest edition of IRPWM with contractors
grease and all other tools & plants
complete and as directed. Note: Each ERC
in this item shall constitute 1 ERC and its
Liner Contact area.
13 063110 Lubrication of gauge face of rail on curves, RM 15000.00 3.31 49650.00
cross overs, points & crossings, turn-in
curves and at locations as required with
contractor's grease graphite grade "O" IS
408 and as directed.
Lubrication of Plate/Rail screws of Points
and crossings, SEJs, Bridges, Curves etc.,
with greases graphite, including removal of
screws carefully without damaging
sleepers, cleaning with wire brush etc., both
screws and dowel hole, applying grease
graphite, refixing the screw and sealing the
top and sides of screw with grease graphite
to prevent ingress of moisture and
corrosion with contractors labour, tools,
consumables under traffic condition all lead
and lift complete.
14 063122 By using Contractor's Grease Graphite Each 10000.00 31.99 319900.00
Scattered renewal or replacement of
missing / worn-out fittings with Railway's
fittings for track/Points & Crossings sleepers
including leading to required location for
the work and the released fittings shall be
collected and neatly stacked, as directed by
the Engineer In charge. Note: New fittings
shall be supplied from and released
material shall be deposited at, nearest
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
18 063140 Renewal of seized Plate/Rail screws on PSC Each 1500.00 346.23 519345.00
Sleepers by using gas or any approved
methods, duly drilling holes in broken screw
and removing existing screw pieces from
the holes along with existing dowels and
fixing new contractor's dowels (procured
from RDSO approved sources) and grouting
around dowel with Epoxy materials of
approved specification and refixing new
Railway's rail/Plate screws duly greasing the
s c r e w w i t h specified grease with all
contractor's materials, consumables, tools
& plants, labour with all lead, lift. Note:
1.Seized screws shall be identified and
marked by JE/P.Way and verified at
minimum SSE/P.Way In charge) level. 2.
Due care shall be taken to avoid any
damage to the sleeper 3.A penalty of 50%
of the basic cost of new sleeper in nearest
sleeper factory shall be levied on each, if
sleeper gets damaged in the process.
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
20 065020 Renewal of existing SEJ with improved SEJ Set 8.00 7875.97 63007.76
with PSC sleepers under traffic block
c o n d i t i o n s as per approved drawing
including fixing of special size bearing
plate, rubber pad and other sleeper / rail
fittings, greasing to the fittings, leading
rails, sleepers & fittings to site, leading and
stacking of released materials within a lead
of 250m, cutting of Rails, drilling of holes,
fixing of related fittings, providing
temporary connection with fishplates till
welding of SEJ is done and sleepers shall be
given initial packing to make track fit for
20KMPH speed. Note: (1) Rail cutting and
hole drilling shall be paid separately. (2)
One set comprise complete SEJ on both
21 065040 Dismantling & removing existing SEJ Set 2.00 8346.70 16693.40
(Switch Expansion Joint) assembly during
line block and its replacement with plain
track as of adjoining section with all fittings
including rail cutting and drilling of holes
and renewal of special sleepers with PSC
Sleepers as directed and aligning rails,
providing fishplates and bolts/ temporary
connection with adequate welding gap with
adjoining rail and ensuring proper track
geometry for 30 kmph speed. The release
material shall be stacked as directed by
Engineer in charge.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Under Traffic Block: Dismantling of existing
BG turnouts, diamond crossings and
derailing switches with all types of rails and
sleeper layout, removing rails, switches,
crossings, sleepers & fastenings, leveling of
ballast to correct profile & stacking all the
released materials, sleepers, fastenings,
rails, switches & crossings including
segregating & stacking at specified
locations in a neat and countable manner,
within the lead of 250m & all lift, clear of
infringements, crossing of track, if any
complete, as directed. Note: 1. This item
shall be operated only when existing
turnout is replaced either with new turnout
in case of TTR or with plain track when
existing turnout is no more required at that
location. 2. Rail cutting will be paid extra
under relevant item. 3. Laying of new
turnout or plain track on prepared ballast
bed, as required, shall be paid separately
under relevant item.
24 071015 Diamond Crossing (Under Traffic Block) Set 4.00 44087.19 176348.76
Under conditions not requiring Traffic Block:
Dismantling of existing BG turnouts,
diamond crossings and derailing switches
with all types of rails and sleeper layout,
removing rails, switches, crossings, sleepers
& fastenings, leveling of ballast to correct
profile & stacking all the released materials,
sleepers, fastenings, rails, switches &
crossings including segregating & stacking
at specified locations in a neat and
countable manner, within the lead of 250m
& all lift, clear of infringements, crossing of
track, if any complete, as directed - Note: 1.
This item shall be operated only when
existing turnout is replaced either with new
turnout in case of TTR or with plain track
when existing turnout is no more required
at that location. 2. Rail cutting will be paid
extra under relevant item. 3. Laying of new
turnout or plain track on prepared ballast
bed, as required, shall be paid separately
under relevant item.
25 071026 Derailing Switch (Under conditions not Set 1.00 5201.90 5201.90
requiring Traffic Block).
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Laying and linking all types of turnouts,
diamond crossings and Derailing switches
with 52Kg / 60Kg rail section on PSC
sleepers on ballast bed, prepared after
dismantling & removal of existing
turnout/normal line during TTR/yard
remodeling under traffic block, as per
standard drawing, duly leading sleepers,
rails, switches, crossings, fastenings
including rail cutting, drilling, fixing of all
components, fittings with housing of tongue
rails as per requirement of signaling,
preparing ballast bed, filling and spreading
of ballast as required, linking of turnout
w i t h track, attending track parameters
including lifting, providing one round of
packing to make track fit for 20 kmph
speed including lubrication of
fittings/fastening, complete as directed by
Engineer in-charge. Note: Payment for
dismantling & removal of existing
turnout/normal line, transportation/stacking
of released material and preparing of
ballast bed is not included in this item and
shall be paid under relevant item.
Lifting the newly inserted BG 60 Kg. / 52
Kg. turnouts/ trap switches to required level
to provide full ballast cushion as per
approved drawings after initial laying with
Railway's stone ballast in convenient stages
including one round of through packing
after completion of final stage of lift,
levelling, aligning, gauging and boxing to
standard profile to make it fit for 20 kmph
with all lead and lifts, complete in all
respect and as directed by the Engineer-in-
charge. Note: 1. The item shall be used only
when UNIMAT is not available for the work
before the turnout is opened for operation.
2 . Leading and dumping of ballast will be
paid separately under relevant item.
Casual renewal of PSC sleepers on points
and crossings, derailing switches and
diamonds portion of any layout including
packing under new sleepers. All the
released materials shall be stacked at
specified location in a countable manner
within the lead of 250m & all lift, clear of
infringements, crossing of track, if any
complete, as directed with contractor's
vehicles, consumables, stores, labour etc.
complete, as directed by Engineer in-
charge. Note: Approach and Exit sleepers
shall be paid as normal sleepers under
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Renewal of Switch Rails (Tongue rails, Stock
rails and fittings) of all rail sections, under
line block conditions ensuring proper
housing & changing of stretcher bars and
fittings as required. Work also includes
drilling of hole, if any, and leading of rails
laying anywhere in station yard to site of
work. Released switch rails shall be stacked
at indicated place in a countable manner
within the lead of 250m & all lift, clear of
infringements, crossing of track, if any
complete, as directed. with contractor's
vehicles, consumables, stores, labour etc.
complete, as directed by engineer in-
charge. Note: 1).One set means Two
Tongue rails and Two Stock rails (2) One
tongue & stock rail shall be considered as
1/2 set. (3) One tongue rail or one Stock rail
shall be considered as 1/4 Set.
Through fitting renewal (TFR) with new
Grooved Rubber Sole pads(GRSP), Liners
and ERC or through renewal with new
GRSPs using existing ERCs and liners after
cleaning and greasing on entire Turnout of
PSC Fan shaped layout including approach
& exit sleepers comprising of removing &
refixing or replacement of plate screws,
ERCs and liners including seized ERCs,
replacing the GRSP after cleaning rail seat,
refixing slide chairs, lubrication of ERCs,
applying grease to plate screws and Liner
contact area with contractor's Grease
Graphite Grade 'O' (IS:408) after cleaning
of rust/scale on liner contact area etc., as
per provisions of IRPWM of latest version
with all contractor's labour, tools, plants
and stacking all the released materials etc
.complete and as directed by Engineer in
charge. Note: GRSP will be supplied at
SSE/stores/depot.
39 074100 Renewal of corroded slide chairs duly Each 400.00 321.97 128788.00
removing the old slide chairs by heating
using contractors gas and equipments or by
any approved methods and inserting
Railways new slide chairs and plate screws
including crossing of tracks, leading all
required materials to site, stacking all
released materials, with all contractor's
tools, consumables, labour, lead, lift and
incidental charges etc complete as directed
by the Engineer in charge. Note: 1. All the
fittings will be supplied at nearest
SSE/Stores. 2. In case of damage of PSC
sleeper, penalty at the rate of 25% of the
current cost of sleeper shall be levied.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
40 074120 Fabrication, supply and fixing of MS lock Set 25.00 1338.61 33465.25
pins/bolts for stock and tongue rails made
out of MS 40mm dia of length 200mm with
head cutting, lathe machining, milling,
drilling, welding the rod with MS flat of
6mm thick of suitable size as required at
site with MS split pins/bolts and supplying
of remaining ancillary materials required at
for locking, including all taxes, lead, lift,
loading and un loading , tools and plants,
transportation, crossing of track whenever
necessary etc., complete and as directed
by Engineer-in-charge at site.
Manual deep screening of Plain track/
turnouts as per procedure prescribed in
IRPWM, June 2020 or latest, on PSC
sleepers of any density and throwing away
screened muck arising out of screening on
toe of bank or on cess, if low or on spoil
banks above top of cutting (including
throwing and leveling, if required beyond
minimum 5m from the edge of cutting
which are up to 3m deep or alternatively
carting it up to 50m for disposing it off
beyond cutting or platforms) as per
direction of Engineer in-charge, including
cutting cess for effective drainage on both
sides, one round of kutcha packing with
screened ballast and further attending to
track parameter to make track fit for 20
kmph speed complete in all respect. Note :
Payment shall be made for length along
main line only for turnouts.
41 081023 Depth of 250 mm below bottom of sleeper - TRM 2000.00 478.48 956960.00
For Plain Track :
42 081027 Depth of 250 mm below bottom of sleeper TRM 1200.00 765.57 918684.00
Recoupment of ballast in running line with
railway's stone ballast from existing stacks
available along alignment either on top of
cutting or on cess or at toe of bank by head
leads or by any other means and spreading
to make up deficiency in the required
profile with contractor's labour, tools &
plants, as directed by Engineer-in-charge.
Note: Payment shall be made based on
ballast stack measurement.
43 082011 For average lead up to 50m and lift up to cum 500.00 95.52 47760.00
additional average lead of 50m or part
thereof when total average lead exceeds
50m, but up to 250m. Note: This item may
be used only in exceptional circumstance
under prior order on record.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
45 083010 Lifting and packing for regrading the TRM 3000.00 165.69 497070.00
existing PSC sleeper track to required
height / level in stages not exceeding
75mm or part thereof at a time, providing
permissible ramp for the track, insertion of
moorum / sand / stone ballast uniformly
under the existing track and placing the
same to safe approved gradient, gauge,
cushion including levelling and one round of
through packing to allow train movement at
restricted speed of 30 kmph for a specified
length with all leads & lifts and fixing,
marking, painting rail level pegs at every
30m interval. Note: Lifting of track shall be
done in stages as per procedure prescribed
in latest edition of IRPWM to get the
proposed final level as per approved
working profile, as directed by Engineer in-
46 083030 Boxing and profiling of ballast as per TRM 10000.00 24.39 243900.00
procedure prescribed in latest edition of
IRPWM including cess dressing on both
sides of track. The work will include
removing excess ballast from track and
putting the same in crib and shoulder by
leading to a maximum of 50m including
crossing of track, deweeding on ballast
section etc and as directed by Engineer-In
Unloading of ballast from Railway's Hopper
Wagons, quantity distribution as per pre-
defined site requirement, clearing
infringements/jammed ballast, distributing
the unloaded ballast uniformly over the
track, profiling and boxing following all
prescribed safety norms.
Manufacturing, supply and stacking of
machine crushed Track Ballast conforming
to RDSO Specification (IRS-GE-1) with latest
correction slips at Railway depot or
nominated location. Note: Distance of
nearest quarry mentioned in each sub-item
is only for the purpose of selecting the
items for preparation of estimates/tender
schedule, based on the minimum distance
betw e e n nearest quarry and centre of
supply points and will not affect the
selection of quarry during physical supply
in any way till prescribed specification is
48 085019 When distance of nearest quarry is more cum 500.00 2242.03 1121015.00
than 200 km and up to 250 km
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
25mm gap 'in-situ' welding during traffic
block and finishing of weld to meet the
prescribed tolerances and pass all
stipulated tests with all required labour,
materials, consumables, tools, equipments
etc. to complete the work in all respect as
per IR's "Manual for Fusion Welding of Rails
by Alumino - Thermic Process" with latest
correction slips, including marking of
welded joint, painting weld collar with
anticorrosive paint, restoration of track
near weld joint to original position and
fixing of joggled fish plate at new weld, to
be removed after passing of weld in USFD
test as directed by Engineer in charge.
Note: 1. Welding shall be carried out only
by trained welder having valid competency
certificate using RDSO approved Alumino
Thermit Welding Portions, 3 piece
prefabricated mould (ZIRCON WASHED)
manually pressed, Single shot crucible
fitted with auto tapping thimble and
Compressed Air Petrol/LPG preheating
technique as per RDSO Specification No
IRST/19-2020 with latest amendment. 2.
Hydraulic Weld trimmer shall be used for
chipping and profile Grinder for finishing. 3.
Only required nos. of Joggled fish plates
shall be supplied by Railway at nearest P.
Way Stores and the same shall be returned
at nearest P. Way Store or at other location
as per direction of Engineer-in-Charge after
release from track. All other items required
shall be supplied by the Contractor.
50 121010 Dismantling of existing LWR/SWR track of TRM 250.00 165.16 41290.00
any structure, removing rails, sleepers, fish
plates, cutting of rails, segregation and
stacking of released Rails, Sleepers and
fitting at nominated location in countable
manner within a free lead of 500m, levelling
of ballast to correct profile for laying new
t r a c k over it, all as per direction of
Engineer-in-Charge.
Shifting & pairing of rails / panels unloaded
alongside existing running track to
adjoining formation of a new line including
crossing of one track, duly lifting & pushing
rail / panel without damaging it and taking
all necessary precautions, so as not to
infringe the running track, as directed by
Engineer in-charge. Note: The rail
barricading, if disturbed during working,
should be restored to its original condition
by the agency including re-fixing &
concreting as required.
51 122011 Rail length up to 13m - Under Traffic Block RM 2000.00 18.48 36960.00
each additional line
First or Second Through Packing of track of
all sleeper density including giving a
general lift, as desired to eliminate sag
after Deep Screening work, lifting of track,
lowering of track and major realignment of
curves and formation rehabilitation as per
procedure prescribed in latest edition of
IRPWM. Note: General lift is normally 25
mm and isolated lift may be up to 50 mm.
53 131031 For PSC Sleeper Track with Sleeper Density TRM 3000.00 116.14 348420.00
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
54 131060 Packing of isolated loose PSC sleepers on Sleeper 3000.00 75.21 225630.00
plain track below the bottom of the sleepers
and surrounding through out its length duly
opening two galas on either side of the
renewed sleepers and packing the sleeper
to bring the track to normal speed including
gauging, aligning, squaring of sleepers and
sectioning of ballast to the required profile
with all contractor's labour, tools and plant
etc. including all lead and lift and crossing
of tracks where ever necessary complete
and as directed by the Engineer-in-charge.
55 131070 Slack picking of joint sleepers and 3 Each 800.00 524.56 419648.00
approach sleepers on either sides giving
required lift to make up general track level,
packing and profiling as directed.
Systemic overhauling of track under traffic
as per procedure prescribed in latest
edition of IRPWM , including removing the
crib ballast in 50mm to 75mm depth below
bottom of sleeper and complete shoulder
ballast without breaking core under the
bottom of sleeper, to recover clean ballast
by screening on wire mesh and disposing
off the muck including throwing & leveling,
if required beyond minimum 5m from the
edge of cutting which are up to 3m deep or
alternatively carting it up to 50m for
disposing it off beyond cutting or platforms
away from the track, as directed by
Engineer in-charge including cutting &
making up the cess and ensuring proper
drainage slope and then re-inserting
cleaned ballast into track and compaction
of shoulder and crib ballast by wooden
mallet and dressing / profiling ballast as per
railway specifications.
56 132011 For PSC sleeper Track with Sleeper Density TRM 3000.00 164.96 494880.00
of 1540 sleepers/Km or more
working in yards
Slewing and realigning of curves under
traffic line block condition, as directed by
Engineer in-charge with contractor's labour,
tools & plants, as required with general lift
up to 25mm including one round of through
packing, ballast profiling,
loosening/tightening of P.Way fittings, if
required and other incidental works. Note:
Payment will be made based on average
slew calculated in each 50m length of track
by averaging absolute values of positive
and negative value of slews.
58 134015 PSC Sleeper track - Maximum slew up to TRM 100.00 116.12 11612.00
59 134016 PSC Sleeper track - Maximum slew more TRM 100.00 146.39 14639.00
than 50mm and up to 100mm
60 134017 PSC Sleeper track - Maximum slew more TRM 50.00 169.15 8457.50
than 100mm and up to 150mm
61 134018 PSC Sleeper track - Maximum slew more TRM 50.00 193.98 9699.00
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
De-stressing of LWR/CWR track of any
density under traffic line block with
contractor's labours, tools, equipments and
consumables inclusive of all lead & lift.
Activities include cutting of LWR/CWR into
convenient panels of specified length,
removal of ERCs, liners, greasing of ERCs
and liner contact area, lifting rails and
keeping them on rollers provided at every
15 sleepers, working out elongation of rail
ends depending on prevailing site
conditions, pulling rails with the help of
Hydraulic Tensor to achieve the desired
elongation, cutting rails, as required,
removing rollers and placing rail in position,
re-fixing ERCs & liners and adjustment of
gap at SEJs : Note: (1) Welding of rail joints
will be paid separately. (2) Rail cutting and
Hole drilling shall be paid separately. (3)
Opening and closing of LC if required will be
paid separately. (4) As per procedure
prescribed in latest edition of IRPWM & CE's
Circulars for destressing of LWR/CWR, if
63 136060 Replacing existing glued joint rail with cut Each 250.00 1685.87 421467.50
rails or with glued joint rail or insertion of
glued joint by cutting existing track under
traffic condition by cutting rails, refixing
with all rail sleeper fastenings and
providing required gaps for carrying out
welding as an alternative to drilling holes or
joining rails with fish plates duly drilling
holes as required including stacking of
released material and as directed by
engineer in-charge. Note: (1) Drilling holes
& rail cutting will be paid separately. (2)
Transportation of materials to the site of
work from supply points, if more than
250m, shall be paid separately.
Fixing of Wooden Distance Block of size
1.0m x 0.3m x 0.15m between track and
section and cess up to 3.95m from centre
line of track in mid section & station yard,
as specified by Engineer in-charge including
disposal of branches, bushes outside
Anti-corrosive painting of rail outside track
on rail bottom, web, foot and fishing plane
with two coats of thickness of 100 microns
each by bituminous black paint confirms to
IS-9862 of reputed make including surface
preparation, as a complete job as per
procedure prescribed in latest edition of
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Anti-corrosive painting of rail on running
track of any sleeper density on web, foot
etc. including liner contact area (excluding
bottom of foot) and fishing plane as per
requirement with two coats of thickness of
100 microns each by bituminous black
paint confirms to IS-9862 of reputed make
including painting of liners, ERCs and
including surface preparation, as a
complete job as per procedure prescribed
in latest edition of IRPWM Note: 60% of
payment shall be made if painting on only
gauge face side is done.
Marking, inscribing, painting, writing,
bordering etc. on new / old iron surface at
various locations of Points & Crossings with
details of turn-in / turn-out reference
station mark on rail web for one set, duly
preparing surface with contractor's wire
brush and applying two coats of yellow
synthetic enamel paint of approved quality
as background and stenciling the details to
suitable size, as described for every curve
reference station mark / switch / crossing
details with black enamel paint of approved
quality complete, as directed : Note:
Stenciling of letters is only permitted. No
hand written letters are accepted.
Carrying out pre-tamping, during tamping
and post-tamping works for tamping of
Turnouts of all types Under Traffic Block
Conditions which include :(1) Re-
adjustment of ballast, heaping-up of ballast,
filling-up of cavities in tamping zone by
picking ballast from stacks / shoulders / crib
of adjoining track up to lead of 50 m to
ensure effective packing; (2) Clearing of
ballast on sleepers to make them visible to
operator; (3) Clearing of ballast over rail
foot to facilitate holding of rail by rollers of
UNIMAT; (4) Digging, screening and
replenishment of ballast at mud pumping /
rounded ballast in sleeper crib location; (5)
Tightening of loose fittings including check
rails immediately before & after tamping;
(6) Replacement of broken / missing fittings
supplied by Railway; (7) Correcting
displaced sleepers to position along with
squaring; (8) Re-setting worked-out / fallen
fittings; (9) Removing and re-fixing joggled
fish plates & wooden blocks, OHE bonds &
other obstructions, wherever necessary ;
(10) Removing and re-fixing stretcher bar,
as directed; (11) Adjustment in opening and
housing of switch for testing operation of
points (12)Manual consolidation of ballast in
cribs and shoulders; (13) Stages of
payment a) 30% of the rate will be paid on
completion of pre tamping attention, b)
Balance 70% of the rate will be paid on
completion of post tamping; (14) Recovery
at the rate of twice the applicable rate will
be effected in case contractor fails to carry
out any of the pre/during/post operation.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Quick cutting with abrasive rail cutter of all
types of rail sections including wear
resistant, head hardened rails up to 110
UTS, with contractors tools & plants,
equipment, consumable with all lead & lift
etc. complete as directed by Engineer in-
charge. Abrasive Rail Cutter will be as per
RDSO Specification No. TM/SM/1 (Rev. 01 of
2012) with latest status of RDSO; Rail
Cutting Wheel Abrasive Disc will be as per
RDSO Specification No.TM/SM/2 (Rev. 01 of
Drilling holes of 16 mm to 32 mm dia. with
Rail Drilling machine including chamfering
with appropriate chamfering tools in all
types of rail section with contractor's tools
& plants, equipment, consumable with all
lead & lift etc. complete, as directed by
Engineer in-charge. Rail Drilling Machine
will be as per RDSO Specification No.
TM/SM/3, dated 24.04.1991.
Loading, leading and unloading of 52Kg /
60Kg rail up to 13 metre length by
Railway's Rail Dolly / Dip Lorry to the
nominated location under traffic with line
protection in case road carriage is not
possible with different lead with a lift up to
5 metre during block period.
Loading, leading and unloading of PSC
Sleepers of 52Kg / 60Kg by Railway's Rail
Dolly/ Dip Lorry to the nominated location
under traffic in case road carriage is not
possible for different leads and lift up to 5
Spreading of New / SH , normal or wider
base PSC sleepers from stack along track
on either side for different leads with all lifts
85 172082 Extra to Item no. 172081 for additional lead Each 2000.00 43.10 86200.00
of every 500m or part thereof beyond 500
Collection, segregation and stacking of
various scattered P.Way materials at
nominated stacking location with
serviceable and un-serviceable ones
separately within a lead up to 500 metre
and lift up to 5 metre including crossing of
track(s) wherever necessary as directed by
Engineer-in-Charge.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
86 173031 Rails, switches, crossings, SEJ, Glued Joints, MT 1000.00 351.11 351110.00
Check Rails etc.
88 173033 P.Way fittings of all types and other similar MT 200.00 358.83 71766.00
89 173040 Stacking of glued joints in single layer for Each 300.00 60.37 18111.00
electrical testing, in such a manner that
glued joints - (a) shall not touch ground, (b)
shall not touch one another, (c) shall not
touch any rail or any metallic body, (d) shall
not be water-logged from any side and (e)
end post shall not rest on supports of glued
Manufacturing, fabricating and supplying
retro-reflective Engineering Indicator
boards, made of 2mm thick aluminium
sheet or 3mm thick aluminium composite
sheet, face to be fully covered with high
intensity encapsulated type heat activated
retro-reflective sheeting conforming to
type-IV of ASTM-D4956-01 in yellow & black
or other colour combination including
subject matter, message, symbols, borders
etc. as approved by Engineer In-charge or
as per IRPWM guidelines, pasted on
substrate by an adhesive backing which
shall be activated by applying heat and
pressure conforming to class-2 of ASTM-D-
4956-01 and fixing the same with suitable
sized aluminium alloy rivets @ 20 cm c/c to
back-support frame of M.S. angle iron of
size 25mm x25mm x 3mmprovided all
along the edges of board with theft
resistant measures back side of board shall
be with non-peelable weatherproof paint,
consisting of one coat of zinc chromate
primer and two coats of epoxy paint.
Vertical post shall have black & white anti-
corrosive paint or powder coating complete,
1400mmx400mm with back support frame
fixed to vertical post of MS angle of size
50mmx50mmx6mm of 3650 mm long
91 202022 Speed Indicator Board of equilateral Each 15.00 5128.99 76934.85
triangular shape having each side of
1000mm with back support frame fixed to
vertical post of MS angle of size
50mmx50mmx6mm of 3650 mm long
1400mmx400mm with back support frame
fixed to vertical post of MS angle of size
50mmx50mmx6mm of 3650 mm long
93 202024 Termination Indicator Board of Circular Each 6.00 7723.13 46338.78
shape having diameter of 1000mm with
back support frame welded to vertical post
of MS angle of size 50mmx50mmx6mm of
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
94 202030 Manufacturing, supplying and fixing Curve Each 100.00 822.97 82297.00
Indicator / Point Indicator / SEJ Boards to be
provided at various locations on formation,
made out of MS sheet 2mm thick of size
450mm x 300mm duly fixed with MS frame
of 25mm x 25mm x 3mm angle welded to
50mm x 50mm x 3mm MS angle, 1000mm
long post split and bent 100mm at bottom
end with all lead & lift as per specification
and including painting of details with
enamel paint, as directed by Engineer in-
charge (Earthwork & concreting will be paid
Manufacture and supply of Drill Twist, made
of High Speed Steel (HSS) of various sizes
of Addison / I.T. make or equivalent, as
directed by the Engineer in-charge.
Erection or removal of temporary
Engineering Indicator Board or any other
board at specified locations without causing
infringement to track etc. complete and as
101 211060 Supply and fixing in position pre-cast Each 60.00 476.92 28615.20
cement concrete Fouling Mark as per
approved drawing at station yard, duly
painting the top surface and slopes with
white enamel paint in two coats and
inscribed letters with black of Fouling Mark,
complete in all respects with all labour,
materials including cement, tools and
102 211070 Providing and erecting water proof Gypsy Day 30.00 489.55 14686.50
Tent of size 3m x 3m for a specific period of
time and removal of the same after
completion of work or as directed by
Engineer in-charge.
Providing furniture temporarily at site work
in good condition at different locations as
per direction of Engineer In-charge and
removing the same after completion of
104 211082 Office Chairs with cushioned seat, back and Each 120.00 34.61 4153.20
105 211130 Providing and fixing Trolley Refuge of size Each 100.00 3716.79 371679.00
3.0m x3.0m on cess, placing with released
unserviceable PSC sleepers and keeping
them at all four sides of refuge and also
placing as matting inside the refuge by
keeping them in upside down position with
a minimum of 14 sleepers including
levelling with earth, excavation, all lead
and lift, crossing of tracks, leading the
sleepers with in a free lead and lift,
handling etc., with all contractor's men
material complete and as directed by the
Engineer-in-charge. Note: Earth-work will to
be paid separately under relevant item.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Hiring of machinery for minor
miscellaneous works for short duration
including operator/driver, fuel, lubricants
and consumable. The contractor shall
arrange all statutory permits as required by
rules and regulations prevailing in the area
of work. Payment shall be made for actual
working hours at site.
106 211201 JCB Backhoe Loaders 3DX Plus or similar Hour 500.00 794.59 397295.00
with minimum 1.10 cum bucket capacity
107 211202 Hydra or similar tyre mounted Pick-n-Carry Hour 600.00 942.83 565698.00
crane of 12T capacity for misc. works of
handling of material
108 211203 Tractor with Trolley for local transportation Hour 500.00 200.69 100345.00
or other misc. works.
cement polythene bags with Rly.
Ballast/moorum/earth/Sand/quarry dust etc.
placing the filled bags on the high banks
/bridge approaches/nominated place etc.
dumping and spreading at the nominated
locations to profile under block period with
all contractor's labour, tools, plants,
loading, unloading, filling, spreading
including all lead/lift etc. complete and as
directed by the Engineer in charge at site
including crossing of track where
Schedule B-Work in connection with CNB NI and other Miscellaneous P.way works in section of
Item- 02 CPWD-DSR-2021 Items
S No. Item No Description of Item Unit Qty Rate Amount
1.0 CARRIAGE OF MATERIALS
By Manual Labour including loading,
1.2 unloading and stacking for lead less than
1.2.1 Lime, moorum, building rubbish
1.2.1.1 Cost of carriage including loading, cum 150 187.24 28086
unloading & stacking for first 50 metres
1.2.1.2 Every additional lead of 50m or part thereof cum- 1350 40.77 55039.5
beyond1st 50 m upto 9 such additional lead lead
1.2.2 Earth
1.2.2.1 Cost of carriage including loading, cum 100 234.05 23405
unloading & stacking for first 50 metres
1.2.2.2 Every additional lead of 50m or part thereof cum- 900 50.96 45864
beyond1st 50 m upto 9 such additional lead lead
2.0 EARTH WORK
Earth work in excavation by mechanical
means (Hydraulic excavator)/manual
means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 sqm on
plan) including getting out and disposal of
excavated earth lead upto 50 m and lift
upto 1.5 m, as directed by Engineer-in-
2.25 Filling available excavated earth (excluding cum 100 253.95 25395
rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding
20cm in depth, consolidating each
deposited layer by ramming and watering,
lead up to 50 m and lift upto 1.5 m.
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
2.25A Excavating, supplying and filling of local cum 600 368.65 221190
earth (including royalty) by mechanical
transport upto a lead of 5km also including
ramming and watering of the earth in
layers not exceeding 20 cm in trenches,
plinth, sides of foundation etc. complete.
Surface dressing of the ground including
removing vegetation and in-equalities not
2.28 exceeding 15 cm deep and disposal of
rubbish, lead up to 50 m and lift up to 1.5
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the
cost of centering and shuttering - All work
up to plinth level :
derived from natural sources : 6 graded
stone aggregate 20 mm nominal size
derived from natural sources)
5.0 REINFORCED CEMENT CONCRETE
5.12S PRE-CAST RCC
5.12 Providing, hoisting and fixing above plinth cum 15 9673.5 145102.5
level up to floor five level precast reinforced
cement concrete work in string courses,
bands, copings, bed plates, anchor blocks,
plain window sills and the like, including the
10 cost of required centering, shuttering but ,
excluding cost of reinforcement with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-
III) derived from natural sources : 3 graded
stone aggregate 20 mm nominal size
derived from natural sources).
5.22S STEEL REINFORCEMENT
Steel reinforcement for R.C.C. work
including straightening, cutting, bending,
placing in position and binding all complete
above plinth level.
5.22A.6 Thermo-Mechanically Treated bars of grade Kg 4500 89.65 403425
Fe-500D or more.
6.0 MASONRY WORK
Brick work with common burnt clay F.P.S.
6.1 (non modular) bricks of class designation
7.5 in foundation and plinth in:
Brick work with common burnt clay F.P.S.
(non modular) bricks of class designation
7.5 in superstructure above plinth level up
to floor V level in all shapes and sizes in :
11.0 FLOORING
11.16S TILE FLOORING
Chequered terrazo tiles 22 mm thick with
graded marble chips of size up to 6 mm in
floors, jointed with neat cement slurry
11.19 mixed with pigment to match the shade of
the tiles, including rubbing and polishing
complete, on 20 mm thick bed of cement
mortar 1:4 (1 cement :4 coarse sand) :
14 11.19.3 Dark shade pigment using ordinary cement Sqm 200 1240.75 248150
11.26S KOTA STONE FLOORING
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Kota stone slab flooring over 20 mm
(average) thick base laid over and jointed
with grey cement slurry mixed with
11.26 pigment to match the shade of the slab,
including rubbing and polishing complete
with base of cement mortar 1 : 4 (1 cement
: 4 coarse sand) :
13.0 FINISHING
13.4S CEMENT PLASTER (IN COARSE SAND)
13.4 12 mm cement plaster of mix :
13.44S EXTERIOR FINISHING
Finishing walls with water proofing cement
paint of required shade :
13.44.1 New work (Two or more coats applied @ Sqm 350 97.6 34160
3.84 kg/10 sqm)
15.0 DISMANTLING AND DEMOLISHING
Demolishing cement concrete manually/ by
mechanical means including disposal of
material within 50 metres lead as per
direction of Engineer - in - charge.
15.2.1 Nominal concrete 1:3:6 or richer mix (i/c cum 160 2007.1 321136
equivalent design mix)
15.3 Demolishing R.C.C. work manually/ by cum 55 2928.1 161045.5
mechanical means including stacking of
19 steel bars and disposal of unserviceable
material within 50 metres lead as per
direction of Engineer - in- charge.
Demolishing brick work manually/ by
mechanical means including stacking of
15.7 serviceable material and disposal of
unserviceable material within 50 metres
lead as per direction of Engineer-in-charge.
Dismantling C.I. or asbestos rain water pipe
15.42 with fittings and clamps including stacking
the material within 50 metres lead :
16.0 ROAD WORK
16.49S MISCELLANEOUS
16.75 Providing and laying C.C. pavement of mix cum 70 8277.55 579428.5
M-25 with ready mixed concrete from
batching plant. The ready mixed concrete
shall be laid and finished with screed board
vibrator , vacuum dewatering process and
finally finished by floating, brooming with
wire brush etc. complete as per
specifications and directions of Engineer-in-
charge. (The panel shuttering work shall be
paid for separately). (Note:- Cement
content considered in this item is @ 330
kg/cum. Excess/less cement used as per
design mix is payable/ recoverable
18.0 WATER SUPPLY
18.23S C.I./DUCTILE IRON PIPES & SPECIALS
18.24 Laying in position S&S or flanged C.I. Quintal 1 546 546
23 special such as tees, bends, collars, tapers
and caps etc.(excluding cost of specials).
Providing and laying S&S C.I. standard
18.25 specials such as tees, bends, collars, tapers,
caps etc. (Heavy class):
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
Providing and laying S&S centrifugally cast
18.27 (spun) iron pipes (Class LA) conforming to
C.I. SLUICE VALVES/ FIRE HYDRANTS &
Providing and fixing C.I. sluice valves (with
cap) complete with bolts, nuts, rubber
insertions etc. (the tail pieces if required
will be paid separately) :
18.31.3 150 mm diameter
Schedule C-Work in connection with CNB NI and other Miscellaneous P.way works in section of
Item- 03 NS Items
S No. Item No Description of Item Unit Qty Rate Amount
52kg/60kg T/out on fan shaped PSC sleeper
including assembling/out from stock joint to
back of crossing outside the track at
suitable locations as instructed by site in
charge as per standard layout and drawing
with all fittings and fastenings with leading
of rail, sleepers switches, crossing etc. from
stacking point to the site of work with
maximum lead of 500 meters, required.
This preassembled T/out will be laid in track
with railway T-28 points and crossing laying
machine under traffic block. Rate also
includes making the proper leveled bed
under same traffic block for laying of T-28
machine in bringing the preassembled
T/outs to site of linking the T/out with
approaches of track with initial aligning,
boxing, lifting, grading, leveling, spacing of
sleepers and kutcha packing required to
make the track fit for traffic e.i for clearing
the traffic block leading of rail sleepers,
work is to be carried out with contractor's
own labour, tools and plants etc. Rates also
include leading of the fitting and fastenings
from PWI's store to site of work. So nothing
extra will be paid to the contractor except
the accepted rates whatsoever the case
may be. (b) Turn out 1 in 8.5
2 02 NS-2 Dismantling and removal of existing Each 1.00 8699.70 8699.70
dead end from the existing track including
leveling of bed upto formation level
loading, leading and stacking of dismantled
materials from the site of work to the store
of SSE/P.way/C/CNB at nominated place.
3 03 NS-3 Carting ballast from ballast stacks to cum 500.00 314.01 157005.00
various locations in the contractors
vehicles, leading, loading and unloading of
the same on location near to the required
location, leading out of ballast and putting
in track (Ballast stacks with in maximum
radius of 13000 m) including crossing of
tracks, nallahs, road etc. The rate includes
all lead, lift, T&P, as required for carrying
out complete work as per direction of
engineer incharge (Lead from 0 to 15km).
(NOTE-This item will be operated when lead
exceed 250 mtr)
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
unloading of excavated earth / muck
/dismantled rubbish of CC / masonry in
foundation from platform in-between
running / adjacent to track and by manual
or any other suitable means or
descent/ascent, crossing of tracks, signal
wires, OHE wires, passenger crowds or any
other obstructions etc. upto a lead of 1 Km.
5 05 NS-5Extra action for siezed pandrol clip Each 15000.00 19.37 290550.00
from the track without damage PRC
sleepers with /without the help of gas
heating and cleaning the same with wire
brush and emery paper specially on the
centre leg including cleaning of eyes of MCI
inserts from any debris of rusted material
and insertion of Railway's new / same
pandrol clip with application of zero grade
graphite grease conforming to IS 408 : 1981
with all contractor's labours, tools & plants,
lead and lift etc.complete job under the
close supervison of Railway's
representative and as directed by Engineer-
6 06 NS-6 Grouting below the sleeper: Grouting Kg 10000.00 65.68 656800.00
in track bed concrete or any other location
with pumpable cementitious grout material
i.e. Tech. Grout p.g. or equivalent having
shrinkage compensating chloride free and
rpid hardening properties with maximum
grain size up to 0.2 mm . The material
should attain compressive e strength of
200-220 kg / Sq Cm. in 4 hours and 300 kg.
/ Sq Cm. in 24 hours and 500 kg. / Sq CM. in
21 days with flowable consistency by
suitable for intricate damp and water
logged areas, the grouting to be carryout
by direct displacement reciprocating pump
including drilling of 22 mm to 33mm
nominal dia holes by rotary cum
percussion, drilling & fixing of exon able,
mechanical pacer with all contractor's
labor, materials,T/P and equipment's etc.
7 07 NS-7 Pouring of carbonious polymer sealant Each 150.00 547.37 82105.50
: As per IS : 1834 - 1984 grade - B pouring
of carbonious polymer sealant uneffected
by spillage of fuel oil, grease, mobile, &
insensitive to heat from locomotive exhaust
in the formed 10mm grove in between
sleeper & concrete maintaining a depth of
25mm from top level of the special
concrete with contractor's labour, materials
& equipments tools & plants complete
8 08 NS-8 Pouring of carbonious polymer sealant Each 150.00 313.12 46968.00
As per IS : 1834 - 1984 grade - A Display
good adhesion has the ability to with stand
extension without cracking & Low
susceptibility to flow during hot weather
conditions with contractors Foam arround
the sleeper with proper arrangement as
directed by Engineer-in-charge & approved
9 09 NS-9 Insulated Rail Dolly with attachment Each 10.00 7264.32 72643.20
for carrying sleeper rails and other P. Way
material as per attached Specification &
Drawing. MAKE-NESC (Warranty Period :
Upto 30 months from the date of delivery.)
PRAYAGRAJ DIVISION-ENGG/NORTH CENTRAL RLY
15 Ton as per following Specification .
capacity 15 Ton Closed Height 558 mm lift
304mm base size 160x280mm head size 76
sq mm (Warranty Period : Upto 30 months
from the date of delivery.)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
ACS1-GCC2022.pdf
ATTACHMENT
IRGCC2022Revised.pdf
ATTACHMENT
IRGCC2022ACS02.pdf
ATTACHMENT
IRGCC2022ACS05.pdf
ATTACHMENT
IRGCC2022ACS04.pdf
ATTACHMENT
IRGCC2022ACS03.pdf
ATTACHMENT
ACS6-GCC2022.pdf
ATTACHMENT
IRGCC2022ACS09.pdf
ATTACHMENT
IRGCC2022ACS10.pdf
ATTACHMENT
IRGCC2022ACS07.pdf
ATTACHMENT
IRGCC2022ACS08.pdf
ATTACHMENT
PlanforCNBNINew.pdf
ATTACHMENT
TD203.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .