Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING LOWEST 1 | |
| 2 | L2₹4.3 L+₹1,394.25 (0.32%)Accepted-AOC | L2 | Accepted-AOC REJECTED BEING LOWEST 2 | |
| 3 | L3₹4.5 L+₹20,768.74 (4.81%)Accepted-AOC VILLAGE KUTHARA POST OFFICE DHULLARA TEHSIL BHATTIYAT DISTT CHAMBA H P | BHATTIYAT | CHAMBA | HIMACHAL PRADESH | L3 | Accepted-AOC REJECTED BEING LOWEST 3 |
| Sl No | Description | Qty | Unit | Anil Kumar Mahajan L2 | naseeb singh L3 | shikha rana L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in hard/ soft rocks, chiseling / wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts stacking the excavated soil / materials not more than 3 meters clear from the edge of excavation and then returning the stacked soil in 15 centimeter layers when required into plinths side of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth within all leads and lifts as per the direction of Engineer-in -Charge. | 17.95 | Cum | 388 ₹6,964.6 | 387 ₹6,946.65 | 385 ₹6,910.75 Lowest |
| 2.00Providing form work with steel plates 3.15 millimeter thick welding with angle iron in frame 30x30x5 millimeter, so as to give fair finish including centering, shuttering strutting and propping etc. with wooden battens and bellies, height of propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for in-situ-reinforced concrete and plain concrete work in | ||||||
| 2.10 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pilasters, buttresses, plinth and string courses and the like within all leads and lifts as per the direction of Engineer-in Charge. | 34.42 | Sqm | 250 ₹8,605 Lowest | 252 ₹8,673.84 | 250 ₹8,605 Lowest |
| 3.00 | Stone/Boulder filling Behind the R/Walls also under floor etc. in all lifts & leads Complete in all Respect within all leads and lifts as per the direction of Engineer-in Charge | 13.08 | Cum. | 2,550 ₹33,354 | 2,500 ₹32,700 Lowest | 2,500 ₹32,700 Lowest |
| 4.00Providing and laying cement concrete work 1: 1.50 3(1 cement 1.50 sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in | ||||||
| 4.10 | Foundations, footings bases of columns and the like mass concrete within all leads and lifts as per direction of Engineer-in-Charge | 12.48 | Cum | 11,555 ₹1,44,206.4 | 11,550 ₹1,44,144 | 11,500 ₹1,43,520 Lowest |
| 4.20 | In Walls (any thickness but not exceeding 0.10 meter thickness) attached pilasters, buttresses, plinth and string courses etc. fram top of foundation level up to floor two level within all leads and lifts as per the direction of Engineer-in-Charge | 20.04 | Cum | 12,000 ₹2,40,480 Lowest | 13,000 ₹2,60,520 | 12,000 ₹2,40,480 Lowest |
Tender Value
₹4.1 L
EMD Value
₹8,246
Closing Date
28 Jun 2025, 3:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION CHOWARI DISTT CHAMBA HP
RRD to FIS Lower Samote in tehsil Sihunta Distt. Chamba HP SH Co Head Weir Balance Work
2025_HPIPH_107914_1
NIT NO 1751-1850 DATED 17-06-2025
Open Tender
Civil Works - Water Works
Item Rate
60 days
SIHUNTA CHAMBA HP
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
₹8,246
16 Nov 2025
19 Jun 2025
28 Jun 2025
19 Jun 2025
28 Jun 2025
19 Jun 2025
19 Jun 2025 - 28 Jun 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .