Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.5 LAccepted-AOC | ₹47.5 L | L1 | Accepted-AOC Accepted being L1 |
| 2 | L2₹47.9 L+₹32,975.45 (0.69%)Rejected-Finance 15 5 1ST MAIN 2ND CROSS K S TOWN BANGALORE BANGALORE RURAL KARNATAKA 560060 | BENGALURU URBAN | KARNATAKA | 560060 | ₹47.9 L+₹32,975.45 (0.69%) | L2 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 3 | L3₹49.8 L+₹2.3 L (4.79%)Rejected-Finance NO 650 3RD CROSS MATHIKERE BANGALORE 560 054 | BENGALURU URBAN | KARNATAKA | 560054 | ₹49.8 L+₹2.3 L (4.79%) | L3 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 4 | L4₹50.0 L+₹2.4 L (5.12%)Rejected-Finance NO 7 3RD MAIN ROAD MUNI REDDY LAYOUT HORAMAVU MAIN ROAD BANASAWADI BANGALORE 560043 | BENGALURU URBAN | KARNATAKA | 560043 | ₹50.0 L+₹2.4 L (5.12%) | L4 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| 5 | L5₹50.0 L+₹2.4 L (5.13%)Rejected-Finance 21 9TH MAIN 4TH CROSS GOWDAKEHOLA BAGALAKUNTE NAGASANDRA POST BANGALORE 560073 | BENGALURU URBAN | KARNATAKA | 560073 | ₹50.0 L+₹2.4 L (5.13%) | L5 | Rejected-Finance Rejected. Quoted rates are higher than L1 |
| Sl No | Description | Qty | Unit | LAKSHMI CONSTRUCTIONS L8 | Maruthi constructions L3 | LAKSHMI ELECTRICAL ENTERPRISES L9 | SRI MAHALAKSHMI CONSTRUCTIONS L5 | Neptune Engineers and Builders L12 | ARUNOTHAYA TRADERS L4 | OM ENTERPRISES L16 | A.GOVINDARAJ L6 | RAMESH BABU CO L15 | M/S SRI BALAJI ENTERPRISES L10 | M/S Shiv Shakti Enterprises L14 | shashi shekar construction L13 | SREE VINAYAKA ENTERPRISES L2 | SHREE JAGANNATH CONSTRUCTION L1 | T C KARUNANITHI L7 | SRI GANESH ENTERPRISES L11 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches n.exc 1.5m deep and n exc 1.5 m in width in soft/ loose soil for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. nexc 10 sq m on plan and getting out complete all as specified and directed. | 96.85 | Cum | 414 ₹40,095.9 | 400 ₹38,740 Lowest | 700 ₹67,795 | 404 ₹39,127.4 | 495 ₹47,940.75 | 700 ₹67,795 | 709 ₹68,666.65 | 600 ₹58,110 | 702 ₹67,988.7 | 420 ₹40,677 | 557 ₹53,945.45 | 655 ₹63,436.75 | 405 ₹39,224.25 | 500 ₹48,425 | 620 ₹60,047 | 450 ₹43,582.5 |
| 2.00 | M&L Cement concrete 1:4:8 type D-2 using 40mm graded crushed stone aggregate as in fdn filling and mass concrete complete all as specified. | 4.8 | Cum | 4,120 ₹19,776 | 4,000 ₹19,200 Lowest | 6,000 ₹28,800 | 4,040 ₹19,392 | 7,500 ₹36,000 | 5,500 ₹26,400 | 5,620 ₹26,976 | 5,500 ₹26,400 | 6,000 ₹28,800 | 4,200 ₹20,160 | 5,788 ₹27,782.4 | 8,003 ₹38,414.4 | 4,600 ₹22,080 | 5,000 ₹24,000 | 5,400 ₹25,920 | 4,150 ₹19,920 |
| 3.00 | Formwork to sides of concrete foundations, footings, bases of columns, rafts, plinth beam and similar work;vertical or to batter rough finished surfaces complete all as specified and directed. | 80 | Sqm | 670 ₹53,600 | 650 ₹52,000 | 500 ₹40,000 | 656.5 ₹52,520 | 590 ₹47,200 | 450 ₹36,000 | 420 ₹33,600 | 350 ₹28,000 Lowest | 427 ₹34,160 | 682.5 ₹54,600 | 444 ₹35,520 | 558 ₹44,640 | 450 ₹36,000 | 475 ₹38,000 | 400 ₹32,000 | 690 ₹55,200 |
| 4.00 | M&L RCC M-25 (20mm graded aggregate) For Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 7.57 | Cum | 8,241 ₹62,384.37 | 8,000 ₹60,560 | 10,200 ₹77,214 | 8,080 ₹61,165.6 | 9,250 ₹70,022.5 | 10,200 ₹77,214 | 10,260 ₹77,668.2 | 9,000 ₹68,130 | 10,230 ₹77,441.1 | 8,400 ₹63,588 | 9,950 ₹75,321.5 | 11,000 ₹83,270 | 6,000 ₹45,420 Lowest | 8,000 ₹60,560 | 9,500 ₹71,915 | 8,260 ₹62,528.2 |
| 5.00 | Formwork to sides of pillars,posts, struts, piers, columns and stanchions for rough finished surfaces of concrete square, rectangular shape complete all as specified and as directed. | 33 | Sqm | 670 ₹22,110 | 650 ₹21,450 | 420 ₹13,860 | 600 ₹19,800 | 425 ₹14,025 | 415 ₹13,695 | 425 ₹14,025 | 500 ₹16,500 | 417 ₹13,761 | 682.5 ₹22,522.5 | 435 ₹14,355 | 504 ₹16,632 | 450 ₹14,850 | 475 ₹15,675 | 400 ₹13,200 Lowest | 680 ₹22,440 |
| 6.00 | M&L RCC M-25 (20mm graded aggregate) For columns, pillars, piers , posts and struts and complete all as specified and as directed. | 3.25 | Cum | 8,242 ₹26,786.5 | 8,000 ₹26,000 | 9,200 ₹29,900 | 8,080 ₹26,260 | 9,124 ₹29,653 | 10,200 ₹33,150 | 9,600 ₹31,200 | 9,000 ₹29,250 | 10,300 ₹33,475 | 8,400 ₹27,300 | 10,655 ₹34,628.75 | 9,303 ₹30,234.75 | 6,100 ₹19,825 Lowest | 8,000 ₹26,000 | 9,500 ₹30,875 | 8,500 ₹27,625 |
| 7.00 | M&L Formwork To chajjas and similar items including edges complete all as specified and directed. | 7.5 | Sqm | 675 ₹5,062.5 | 650 ₹4,875 | 520 ₹3,900 | 600 ₹4,500 | 625 ₹4,687.5 | 550 ₹4,125 | 555 ₹4,162.5 | 450 ₹3,375 Lowest | 555 ₹4,162.5 | 682.5 ₹5,118.75 | 535 ₹4,012.5 | 605 ₹4,537.5 | 450 ₹3,375 Lowest | 470 ₹3,525 | 500 ₹3,750 | 690 ₹5,175 |
| 8.00 | M&L RCC M-25 (20mm graded aggregate) as in chajjas and in shelves and like complete all as specified and directed. | 0.74 | Cum | 8,250 ₹6,105 | 8,000 ₹5,920 | 9,300 ₹6,882 | 8,080 ₹5,979.2 | 9,250 ₹6,845 | 10,200 ₹7,548 | 10,200 ₹7,548 | 9,000 ₹6,660 | 10,300 ₹7,622 | 8,400 ₹6,216 | 10,700 ₹7,918 | 9,400 ₹6,956 | 6,000 ₹4,440 Lowest | 8,000 ₹5,920 | 9,200 ₹6,808 | 8,500 ₹6,290 |
| 9.00 | Formwork For Lintel and soffits of floor or roof beams, beam haunching incl supports, overhangs, etc also splays between floors and beams etc | 30 | Sqm | 680 ₹20,400 | 650 ₹19,500 | 420 ₹12,600 | 600 ₹18,000 | 525 ₹15,750 | 415 ₹12,450 | 425 ₹12,750 | 500 ₹15,000 | 417 ₹12,510 | 682.5 ₹20,475 | 444 ₹13,320 | 455 ₹13,650 | 450 ₹13,500 | 475 ₹14,250 | 400 ₹12,000 Lowest | 690 ₹20,700 |
| 10.00 | M&L Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work n exc 200mm thick complete all as specified and directed. | 55 | Sqm | 670 ₹36,850 | 650 ₹35,750 | 500 ₹27,500 | 600 ₹33,000 | 525 ₹28,875 | 600 ₹33,000 | 460 ₹25,300 | 550 ₹30,250 | 600 ₹33,000 | 682.5 ₹37,537.5 | 444 ₹24,420 Lowest | 555 ₹30,525 | 450 ₹24,750 | 475 ₹26,125 | 540 ₹29,700 | 695 ₹38,225 |
Tender Value
Refer Docs
EMD Value
₹98,300
Closing Date
23 Jun 2026, 6:00 pmClosed
Garrison Engineer M AF Jalahalli
Garrison Engineer M AF Jalahalli Bangalore 560013
PROVISION OF LOUNGE ROOM AT MAIN GUARD ROOM CHEQUERED TILES AND HARDSTANDING NEAR OFFICERS MESS AT AFTC
2026_MES_769325_1
8346/E8
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer M AF Jalahalli
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Garrison Engineer M AF Jalahalli
₹98,300
Yes
31 Jul 2026
2 Jun 2026
30 Jun 2026
2 Jun 2026
23 Jun 2026
16 Jun 2026
2 Jun 2026 - 9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in trenches n.exc 1.5m deep and n exc 1.5 m in width in soft/ loose soil for foundation, etc. or for shafts, wells, cesspits,manholes, pier holes, etc. nexc 10 sq m on plan and getting out complete all as specified and directed. | 96.85 | Cum | - | - |
| 2 | M&L Cement concrete 1:4:8 type D-2 using 40mm graded crushed stone aggregate as in fdn filling and mass concrete complete all as specified. | 4.8 | Cum | - | - |
| 3 | Formwork to sides of concrete foundations, footings, bases of columns, rafts, plinth beam and similar work;vertical or to batter rough finished surfaces complete all as specified and directed. | 80 | Sqm | - | - |
| 4 | M&L RCC M-25 (20mm graded aggregate) For Foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and as directed. | 7.57 | Cum | - | - |
| 5 | Formwork to sides of pillars,posts, struts, piers, columns and stanchions for rough finished surfaces of concrete square, rectangular shape complete all as specified and as directed. | 33 | Sqm | - | - |
| 6 | M&L RCC M-25 (20mm graded aggregate) For columns, pillars, piers , posts and struts and complete all as specified and as directed. | 3.25 | Cum | - | - |
| 7 | M&L Formwork To chajjas and similar items including edges complete all as specified and directed. | 7.5 | Sqm | - | - |
| 8 | M&L RCC M-25 (20mm graded aggregate) as in chajjas and in shelves and like complete all as specified and directed. | 0.74 | Cum | - | - |
| 9 | Formwork For Lintel and soffits of floor or roof beams, beam haunching incl supports, overhangs, etc also splays between floors and beams etc | 30 | Sqm | - | - |
| 10 | M&L Formwork to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work n exc 200mm thick complete all as specified and directed. | 55 | Sqm | - | - |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
BOQ_861550.xls
BOQ • 0.59 MB
8346PS.pdf
Additional Documents • 0.90 MB
8346GENPAGE.pdf
Tender Documents • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .