| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC Rate Quoted below the Estimate |
| 2 | L2₹9.7 LRejected-AOC | ₹9.7 L | L2 | Rejected-AOC Rate Quoted Above the Estimate |
| Sl No | Description | Qty | Unit | MRS and Co L1 | R.R.Kanishka & Co. L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 184.42 | m3 | 197.5 ₹36,422.95 | 200 ₹36,884 |
| 2.00 | Plain cement concrete Using 1:4:8 mix ( One cement , four sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 19 | m3 | 5,463 ₹1.0 L | 5,480 ₹1.0 L |
| 3.00Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 | |||||
| 3.10 | Below 1m | 400 | m2 | 525 ₹2.1 L | 550 ₹2.2 L |
| 3.20 | Above 1.00 | 26 | m2 | 937 ₹24,362 | 950 ₹24,700 |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 67 | m3 | 6,754 ₹4.5 L | 6,780 ₹4.5 L |
| 5.00 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 118 | m2 | 171 ₹20,178 | 180 ₹21,240 |
| 6.00 | Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications. | 560 | KG | 91.5 ₹51,240 | 92 ₹51,520 |
| 7.00 | Reinforced Cement concrete 1:1.5:3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 7 | m3 | 8,773 ₹61,411 | 8,800 ₹61,600 |
Tender Value
₹11.5 L
EMD Value
₹23,000
Closing Date
9 Mar 2026, 3:00 pmClosed
EO Kannankurichi Town Panchayat Salem District
Executive Officer Kannankurichi Town Panchayat Salem District
Construction of Drain with culvert at 13th ward Kesavan Nagar in Kannankurichi Town Panchayat
2026_DTP_672087_1
103/2026
Open Tender
Civil Works
EO Kannankurichi Town Panchayat Salem District
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹23,000
15 May 2026
9 Mar 2026
9 Mar 2026
9 Mar 2026
9 Mar 2026
9 Mar 2026
Earthwork excavation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10
Plain cement concrete Using 1:4:8 mix ( One cement , four sand and Eight aggregates) using 40 mm ISS HBG metal including cost and conveyance of all materials to work site and all labour charges for mixing, laying,consolidating and curing etc complete as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86
Below 1m
Above 1.00
Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (M- Sand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers)
Supplying fabricating and placing in position of steel rods using TMT. or Ribbed Tor Steel including cost of binding wire, cost of labour charges for fabrication and placing in position etc. Complete. Complying with std. specifications.
Reinforced Cement concrete 1:1.5:3 (one cement, one & half M.sand and three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807719.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.20 MB
BOQ_807719.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid