Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹99,000
Closing Date
12 Mar 2026, 4:00 pmClosed
EE, Doimukh Division, APPWD, Doimukh
O/o the EE, Doimukh Division, APPWD, Doimukh
C/o 6 Nos additional Classroom at GMS, Dobum.
2026_PWDAP_3024_1
DD/2025-26/14
Open Tender
Civil Works
Item Rate
730 days
Banderdewa
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE PWD Doimukh
₹99,000
13 Mar 2026
6 Mar 2026
13 Mar 2026
6 Mar 2026
12 Mar 2026
6 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site Development | - | - | - | - |
| 2 | EARTH WORK | - | - | - | - |
| 3 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. | 136.58 | Cum. | - | - |
| 4 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 52.38 | Cum. | - | - |
| 5 | Re-filling excavated earth in foundations and plinth etc. in 15 cm layer including ramming and watering etc. complete. | 5.37 | Cum. | - | - |
| 6 | CONCRETE WORK | - | - | - | - |
| 7 | Providing and laying of boulder as dry rubble Flooring as per specification and direction of engineer in charges. | 70 | Cum. | - | - |
| 8 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. | 47.11 | Cum. | - | - |
| 9 | Providing and laying damp proof course 38 mm thick with cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 12.5 mm nominal size). | 195.6 | Sqm. | - | - |
| 10 | REINFORCEMENT CEMENT WORK | - | - | - | - |
stage.html
html • 0.02 MB
finance_3223.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
SBD.pdf
Tender Documents • 4.20 MB
BOQ_3223.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .