Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹52.1 L+₹36,273 (0.70%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹52.8 L+₹99,158 (1.91%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹53.7 L+₹2.0 L (3.78%)Rejected-Finance BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
27 Dec 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
S.E. MGCCC-1 Meerut
Office of Superintending Engineer Madhya Ganga Canal Construction Circle-1 Meerut
LOT5
2021_UPIDC_657706_7
04/SE/MRT/2021-22
Open Tender
Civil Works
Item Wise
90 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.2 L
7 Jan 2022
22 Dec 2021
27 Dec 2021
22 Dec 2021
27 Dec 2021
22 Dec 2021
90 days
Amount
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required level and slope also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:2:4 (M-15) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work per cum.
Cement concrete with stone ballast in R.C.C. 1:1:2 (M-25) including all cost of material, labour , T&P etc. for completion of work per cum.
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. per Sqm.for CC work
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work. per Sqm. for RCC work
Supllying and laying 225 mm wide PVC wtaer seal in expansionsion joint
Providing and laying coarse sand in filter including all cost of material, labour and T&P etc. complete.
Providing and laying graded gravel 4-20mm. Size including all cost of material, labour and T&P etc. complete.
Providing and laying graded stone ballast 20-40 mm. Size including all cost of material, labour and T&P etc. complete.
Providing and laying dry boulder in apron including all cost of material, labour and T&P etc. complete.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work. Per cum
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work. R/M
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete. Per sqm.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete. Per No..
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
Earth work in filling in Ramp and diversion including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Suplying and laying of R.B.M. including cost of all material, labour and T&P etc. complete.
Dry brick on edge soling laid dry filling joints including all cost of material, labour and T&P etc. all complete. Per sqm.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete. Per No..
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete. Per No..
Removal of diversion including 1.50 m lift and up to 100 m lead.
IQRAR AHMAD CONTRACTOR
MOHAMMAD AWAIS
MANOJ CHAUDHARY
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .