Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC 1109 11TH FLOOR SPAZE I TECH PARK SECTOR 49 SOHNA ROAD GURGAON HARYANA 122002 | GURUGRAM | HARYANA | 122002 | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 Cr+₹36,288 (0.20%)Rejected-Finance 16A 1 EARLE STREET FLAT N 1 FIRST FLOOR KOLKATA 700026 | KOLKATA | WEST BENGAL | 700026 | ₹1.8 Cr+₹36,288 (0.20%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.8 Cr+₹1.4 L (0.78%)Rejected-Finance 7TH FLOOR LEVEL 8 UNIT 804 VASAVI MPM GRAND AMEERPET AWFIS HYDERABAD TELANGANA 500016 | HYDERABAD | TELANGANA | 500016 | ₹1.8 Cr+₹1.4 L (0.78%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.9 Cr+₹10.8 L (6.04%)Rejected-Finance 6 NEW SADGURU NANIK INDUSTRIAL ESTATE OFF WESTERN EXPRESS HIGHWAY GOREGAON E MUMBAI 400063 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400063 | ₹1.9 Cr+₹10.8 L (6.04%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.0 Cr+₹22.1 L (12.3%)Rejected-Finance | ₹2.0 Cr+₹22.1 L (12.3%) | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
Closing Date
15 Apr 2021, 6:00 pmClosed
Jt. Gen. Manager (Engg-E)
Jt. Gen. Manager (Engg-E), AAI, Goa Airport, Goa.
Operation of Arrival conveyors and Departure In-line Baggage Handling System at Goa Airport (Year 2021-2024)
2021_AAI_75038_1
AAI/Goa/JGME/BHS/ENIT-25/20-21
Open Tender
Electrical Works
Works
1096 days
Goa Airport
As per NIT Criteria
19 documents required · 19 mandatory
₹1,120
Yes
Exempted
18 Aug 2022
6 Apr 2021
19 Apr 2021
7 Apr 2021
15 Apr 2021
7 Apr 2021
7 Apr 2021 - 13 Apr 2021
Amount
Ensuring smooth and un-interrupted operation of complete 4 nos. In Line Baggage Handling System (ILBS) in the departure side comprising of weighing, dispatch, collector, queuing and transport conveyors (Straight/inclined/declined) and PLC based electrical control panel and SCADA control system including identification, clearing bag jam, clearing over height and over length baggages and identification of dieback by resetting/re-starting the system by deploying following minimum manpower on round the clock basis (three shifts) for all days including Sunday’s and holidays as required for a period of three years. i) Site Supervisor (Highly Skilled) -1 no. in general shift. ii) Electrician cum operator/SCADA operator (Skilled) - 3 nos. in each shift. iii) Helper (Semi-Skilled)- 2 no. in each shift.
Operation of 06 nos. Arrival Carousal including feeder conveyors by deploying following minimum manpower on round the clock basis (three shifts) for all days including Sunday’s and holidays as required for a period of three years. i) Electrician cum operator (Skilled)- 1 no. in each shift. ii) Helper (Semi-Skilled)- 1 no. in each shift.
GANNON DUNKERLEY AND CO LTD
Swati Airport Support Services Pvt Ltd
PREMIER ENGINEERING TECHNICS PVT. LTD.
India aviation consulting and support LLP
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .