Superintending Engineer KEDC Krishnagiri
Superintending Engineer KEDC, 110/33-11KV SS Krishnagiri Campus, Kattiganapally, Rayakotta Road, Krishnagiri 635002
Work Contract for Erection of HT LT Lines and Distributions transformer of Ex 11 KV Goolium feeder at Marikampally 33 11 KVSS under Agriculture Feeder Segregation in Alapatty Section in Town Krishnagiri Sub division of Krishnagiri Division
2022_EB_252570_1
KEDC/Spec.No.37/22, Dt.20.09.22 Goolium#
Open Tender
Electrical Works
Works
365 days
Krishnagiri
Should be TNEB Registered Contractor
2 documents required · 2 mandatory
₹0
₹12,000
Yes
13 Oct 2022
20 Sept 2022
7 Oct 2022
20 Sept 2022
6 Oct 2022
20 Sept 2022
20 Sept 2022 - 6 Oct 2022
Amount
Excavation of Pole Pits/Stay Set:
For pole upto 8.0m length by using JCB/Manual
For pole above 8.0m length by using JCB/Manual
Excavation of Stay pit of 4.5' to 5' depth using JCB/Manual
Erection of Poles and Accessories
Erection of RCC, REC, PSC poles upto 8.00m length by using JCB/Manual
Erection of RCC, REC, PSC poles above 8.00m length by using JCB/Manual
Erection of stay set complete with fixing up stay wire Eye, Bow,Guy Shackle, Binding etc.
Fixing of line materials
Fixing of HT V Cross arms 3 1/2, 4 1/2 & 5 feet
Fixing of LT 3 Phase cross arm
Fixing of HT / LT TI Fitting
Fixing of HT Pin Insulators with Pin
Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, insulators and Jumpering etc
Paving and Stringing of conductor
Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor
Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor upto 7/3.35mm ACSR
Releasing and reerection (resagging) of one run of all sizes of conductor
Erection of Distribution Transformers:
Erection of Distribution Transformer Including loading of Distribution Transformer at stores and erection at structure upto 25 KVA
Erection of Distribution Transformer Including loading of Distribution Transformer at stores and erection at structure upto 100KVA
Erection of 11KV Single pole structure including erection of DT complete without centre support
Erection of DP Structure:
Erection of Single Pole DP with Complete and with single earth
Transportation charges
Transportation of all types and sizes of poles and other associated material from road side to pole pit and vice versa upto 0.50KM
Transporting of all types of poles by bullock cart or other vehicle (for all size of poles including loading and unloading) for a lead upto 5 KM
Transporting of conductors of all size from road side to pit locations upto 1 KM of conductor
Transporting of Distribution Transformer / Line materials from stores to office/ site upto 10 KM distance by engaging 1 ton capacity Minidor(lorry)
Loading/Unloading Charges
Loading/Unloading of variouse size of REC, RCC,PSC Poles upto 8.0m length
Loading/Unloading of variouse size of REC, RCC,PSC Poles above 8.0m length
Loading of conductor
Unloading of conductor
Loading/Unloading of line material
Loading/Unloading OF 11kv Strain Disc
Loading/Unloading of LT Pin Insulator shackle, guy shackle, LT Pin, Metal Parts, HT Pin etc.,
Dismantling of Line Materials
Dismantling of RCC, REC, PSC & Metal poles of all sizes including the closing of pit
Dismantling of Crossarm,Clamps,TIFitting ,Hardwares, Insulators etc
Earthing
Earthing of poles with GI wires 4 or 6 SWG by coil earthing
Concreting Works
Concreting with 1:4:8 mix using 40mm jelly including curing (material +labour) sleeve concreting of poles
Stay Concreting
Work Shop Charges
Numbering of poles including cost of paint
First coat with aluminium paint (line Materials) including cost of Aluminium Paint
Second coat with aluminium paint (line Materials) including cost of aluminium Paint
Painting of Cement poles by distember coating including cost of distember
Clearing of tree branches of coconut trees
Clearing of tree branches of Neem, Tamarin, Country etc.,
Clearing of branches/Trees with JCB
Alteration of Back clamps/Stay Clamps
Drilling of holes
Fixing of wedge connector HT
Fixing of wedge connector LT
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .