| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹61.9 LAccepted-AOC | ₹61.9 L | L1 | Accepted-AOC L1 Tenderer |
| 2 | L2₹63.2 L+₹1.3 L (2.03%)Rejected-Finance | ₹63.2 L+₹1.3 L (2.03%) | L2 | Rejected-Finance L2 Tenderer |
| 3 | L3₹64.4 L+₹2.5 L (4.00%)Rejected-Finance | ₹64.4 L+₹2.5 L (4.00%) | L3 | Rejected-Finance L3 Tenderer |
| 4 | L4₹65.1 L+₹3.2 L (5.15%)Rejected-Finance | ₹65.1 L+₹3.2 L (5.15%) | L4 | Rejected-Finance L4 Tenderer |
| 5 | L5₹70.7 L+₹8.8 L (14.2%)Rejected-Finance | ₹70.7 L+₹8.8 L (14.2%) | L5 | Rejected-Finance L5 Tenderer |
| Sl No | Description | Qty | Unit | M.MURUGAN L2 | K.ANBU L1 | DEEPAM CONSTRUCTIONS L4 | T ANBALAGAN CONSTRUCTIONS L5 | N.Sriramulu L6 | M/S.KCP CONSTRUCTIONS L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 720 | Sqm | 6 ₹4,320 | 5.4 ₹3,888 Lowest | 5.5 ₹3,960 | 6 ₹4,320 | 6 ₹4,320 | 5.6 ₹4,032 |
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 900 | Sqm | 23 ₹20,700 | 19.85 ₹17,865 Lowest | 20.3 ₹18,270 | 22.1 ₹19,890 | 20 ₹18,000 | 20.55 ₹18,495 |
| 3.00 | collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc. | 274.4 | Cum | 120 ₹32,928 Lowest | 124.95 ₹34,286.28 | 127.8 ₹35,068.32 | 139.5 ₹38,278.8 | 145 ₹39,788 | 129.4 ₹35,507.36 |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content for sholders | 119.3 | Cum | 400 ₹47,720 | 404.35 ₹48,238.96 | 413.5 ₹49,330.55 | 451 ₹53,804.3 | 389 ₹46,407.7 Lowest | 418.6 ₹49,938.98 |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 406.56 | Cum | 1,800 ₹7,31,808 Lowest | 2,035.3 ₹8,27,471.57 | 2,083 ₹8,46,864.48 | 2,274 ₹9,24,517.44 | 2,250 ₹9,14,760 | 2,107.15 ₹8,56,682.9 |
| 6.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 2,710.37 | Sqm | 60 ₹1,62,622.2 Lowest | 73 ₹1,97,857.01 | 74.5 ₹2,01,922.57 | 81 ₹2,19,539.97 | 78 ₹2,11,408.86 | 75.65 ₹2,05,039.49 |
| 7.00 | Applying tack coat over WMM surface using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe | 2,721.25 | Sqm | 14 ₹38,097.5 Lowest | 17 ₹46,261.25 | 17.4 ₹47,349.75 | 19 ₹51,703.75 | 19 ₹51,703.75 | 17.65 ₹48,030.06 |
| 8.00 | Providing and laying Bituminous Macadam with Central Hot Mix Plant 20-30T capacity, using crushed aggregates of grading as per table 500.4 premixed with bituminous binder , transported to site upto lead of 1000m laid over a previously prepared surface with paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause.504 including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc.Using Plastic Waste | 136.07 | Cum | 8,500 ₹11,56,595 | 7,055 ₹9,59,973.85 Lowest | 7,530 ₹10,24,607.1 | 8,220 ₹11,18,495.4 | 8,250 ₹11,22,577.5 | 7,617.4 ₹10,36,499.62 |
| 9.00 | BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 68.03 | Cum | 10,500 ₹7,14,315 | 9,544.35 ₹6,49,302.13 Lowest | 9,768 ₹6,64,517.04 | 10,667 ₹7,25,676.01 | 1,01,000 ₹68,71,030 | 9,881.2 ₹6,72,218.04 |
| 10.00 | Providing and laying of Bituminous Concrete for Speed Breakers using 60/70 grade bitumen which shall consist of construction of a single course binder/ wearing course on a previously prepared bituminous base to the requirements of the specification using CMP, Paver & Power roller as per standard specification clause 508 of MORT & H. | 1.07 | Cum | 10,500 ₹11,235 | 9,544.35 ₹10,212.45 Lowest | 9,768 ₹10,451.76 | 10,667 ₹11,413.69 | 1,01,000 ₹1,08,070 | 9,881.2 ₹10,572.88 |
Tender Value
₹77.0 L
EMD Value
₹77,000
Closing Date
20 Feb 2026, 3:00 pmClosed
The Project Director, DRDA, Chengalpattu
O/o The Project Director, DRDA, Chengalpattu
Strengthening of P.O road to Minnal Keezhminnal road 0.0 to 1.0 in Minnal Chithamur Village Panchayat in Acharapakkam Panchayat union of Chengalpattu District under NABARD RIDF 2026 27 Pakage No.01
2026_RDTN_656066_1
Rc.No.5734/2024/A13 dt. .02.2026
Open Tender
Civil Works - Roads
Item Rate
180 days
Acharapakkam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹77,000
13 Mar 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
20 Feb 2026
13 Feb 2026
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site and labour charges etc.
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content for sholders
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Applying tack coat over WMM surface using 2.5Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as pe
Providing and laying Bituminous Macadam with Central Hot Mix Plant 20-30T capacity, using crushed aggregates of grading as per table 500.4 premixed with bituminous binder , transported to site upto lead of 1000m laid over a previously prepared surface with paver finisher to the required grade,level and alignment and rolled to achieve the desired compaction as per Technical specification clause.504 including labour for attending to paver to site, hire & fuel charges for 20-30T CMP with bitumen boiler, tipper trucks, paver finisher, vibratory/pneumatic roller and all other tools and plants required, including fuel and other incidental charges etc.Using Plastic Waste
BITUMINOUS CONCRETE 25mm THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing and laying of Bituminous Concrete for Speed Breakers using 60/70 grade bitumen which shall consist of construction of a single course binder/ wearing course on a previously prepared bituminous base to the requirements of the specification using CMP, Paver & Power roller as per standard specification clause 508 of MORT & H.
Providing and laying of hot applied Thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes etc., complete as per MoRT&H specification No.803
Road Markers/Road Stud with Lens Reflector -- Providing and fixing reflective road studs of ‘category A’ Raised pavement markers made out of poly carbonate / methyl methercrylate/ABS moulded body confirming to ASTM D 788 and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face with retro reflectance and chromaticity values conforming to ASTM D4280. The reflective raised pavement markers shall also confirm to the MORTH circular No RW / NH. 33023/10/ 97-DO. III dt 11.06.97. The height, width and length shall not be less than 15 mm, 90 mm and 100 mm and with minimum reflective area of 13 Sq.cm on each side and the slope to the base shall be 35 /- 5 degree. Each reflector shall have a CIL not less than values specified in Table 2 of said MORTH circular. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 /- 2mm and height not less than 30 /- 2 mm) from the body is to be a minimum value of 500 Kgf. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer. The marker shall support a load of 13635 Kg tested in accordance with ASTM D4280 and confirming to IRC 35 - 2015 guidelines and MoRT&H specification 804 etc., complete
Provision for Kilometer stone
Provision for Hectometer Stone
Constrution of RCC Culvert 1.50 m span at Ch 0/0-0/002
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 B
Supply of m.sand and filling in to the foundation including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for bed blocks for 10 cum
Superstructure
Bedblock
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for Deckslab
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (BELOW GROUND LEVEL)
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. (ABOVE GROUND LEVEL)
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length, bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing 20mm Bitumen felt for expansion joint Between Dirtwall &Deck slab
Providing and fixing Tar Paper for bearing Between Bed Block & Deck slab
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Providing CC Pavement at Ch 0/300-0/580
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),
Towards the charges for routline maintenance of the road work executed under NABARD RIDF XXXI Tranche -2025-26 including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction & maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
TB01.pdf
Tender Documents • 0.56 MB
PBid01.pdf
Additional Documents • 0.54 MB
BOQ_786877.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .