Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.3 CrAccepted-AOC N A | PALWAL | HARYANA | 121004 | ₹4.3 Cr | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹4.8 Cr+₹51.0 L (11.8%)Rejected-Finance 121004 | ₹4.8 Cr+₹51.0 L (11.8%) | L-2 | Rejected-Finance Other than L-1 bidder |
| 3 | L-3₹6.2 Cr+₹1.9 Cr (44.9%)Rejected-Finance 101 PRIDE KUMAR SENATE BUILDING SENAPATI BAPAT ROAD SENAPATI BAPAT ROAD PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | ₹6.2 Cr+₹1.9 Cr (44.9%) | L-3 | Rejected-Finance Other than L-1 bidder |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
27 Mar 2023, 2:00 pmClosed
DGM(Mat)
Indian Oil Corporation Limited (Pipelines Division) A-1, Udyog Marg, Sector-1, Noida (UP) 201 301, India
Booster Pumping unit ,VS-6 type As per API 610
2023_PLHO_163096_1
PLM/NMIA ATF/23/1
Open Tender
Mechanical - Pumps, Compressors, Steam Turbines and Other Equipment
Supply
300 days
Noida
Please refer tender document
16 documents required · 16 mandatory
₹3.9 L
Yes
On virtual Mode
20 Jul 2023
16 Feb 2023
28 Mar 2023
16 Feb 2023
27 Mar 2023
3 Mar 2023
21 Feb 2023
Amount
ITEM SUPPLY
Vertical Turbine type Centrifugal Pumping Unit complete with Pump (VS6 of API610), Counter Flanges , eccentric reducer, Concentric reducer ,Y-Strainer, Coupling, Base plate, Flameproof and weatherproof squirrel cage induction motor, Instrumentation and with all accessories & commissioning spares as per technical specifications (Pump parameter -Q- 331 m3/hrs, H-260 MCL)
Complete Mechanical Seal as per technical specifications
Pump Bearing as per technical specifications
Complete set of pump gaskets/O-ring as per technical specifications
Motor Bearing (DE+NDE) as per technical specifications
Cooling Fan as per technical specifications
Pump Bearing RTD as per technical specifications
Pump Casing RTD as per technical specifications
Vibration Switch for pump as per technical specifications
Vibration Switch for motor (if applicable)
Pressure switch (complete with junction box) for suction
Pressure switch (complete with junction box) for discharge
Pressure indicator for suction
Pressure indicator for discharge
Level switch for seal leakage detector
Service charges for pre-commissioning check, installation & commissioning personnel including all expenses e.g. Air/Rail Fare, Local Transport, accommodation etc. for pumping unit (@ 10 days per pumping units).
RuhRPumpen India Private Limited
KIRLOSKAR EBARA PUMPS LIMITED
RuhRPumpen India Private Limited
KIRLOSKAR EBARA PUMPS LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .