| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 CrAccepted-AOC AT PO BARALOTA BY PASS ROAD DALTONGANJ DISTT PALAMU JHARKHAND 822121 | GARHWA | JHARKHAND | 822121 | ₹4.2 Cr | L1 | Accepted-AOC Eligible L1 bidder |
| 2 | L2₹4.5 CrRejected-Finance 18A PARK STREET 6 0 1 STEPHEN COURT LIFT NO 1 KOLKATA WB 700071 | KOLKATA | KOLKATA | WB | 700071 | ₹4.5 Cr | L2 | Rejected-Finance As per TC Recommendation. |
| 3 | L3₹5.0 CrRejected-Finance 111 M C GARDEN ROAD KOL 30 | KOLKATA | WEST BENGAL | ₹5.0 Cr | L3 | Rejected-Finance As per TC Recommendation. |
| 4 | L4₹5.0 CrRejected-Finance | ₹5.0 Cr | L4 | Rejected-Finance As per TC Recommendation. |
| 5 | L5₹5.6 CrRejected-Finance | ₹5.6 Cr | L5 | Rejected-Finance As per TC Recommendation. |
| Sl No | Description | Qty | Unit | M/S. Chatterjee Enterprise L3 | COAL MINES ASSOCIATED TRADERS PRIVATE LIMITED L2 | M/S UNITED COAL CARRIERS L4 | M/S VIKASH KUMAR TIWARI L1 | BISWAJYOTI BHATTACHARYYA L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00Item Description/ Heading | ||||||||
| 1.01 | Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres: Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 9,753 | cum | 45 ₹4,38,885 | 38.57 ₹3,76,173.21 | 98 ₹9,55,794 | 150 ₹14,62,950 | 43 ₹4,19,379 |
| 1.02 | Compacting Original Ground: Compacting original ground supporting subgrade: Loosening of the ground upto a level of 500mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for subgrade construction | 9,000 | cum | 36 ₹3,24,000 | 44.27 ₹3,98,430 | 160 ₹14,40,000 | 150 ₹13,50,000 | 49.42 ₹4,44,780 |
| 1.03 | Granular Sub-Base with Graded Material (Table:- 400-1): Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401: For Gradine-V Material | 2,250 | cum | 2,200 ₹49,50,000 | 1,959.16 ₹44,08,110 | 2,200 ₹49,50,000 | 1,500 ₹33,75,000 | 4,000 ₹90,00,000 |
| 1.04 | Granular Sub-Base with Graded Material (Table:- 400-1): Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OM, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401: For Grading- III Material | 2,250 | cum | 2,150 ₹48,37,500 | 2,050.38 ₹46,13,355 | 2,200 ₹49,50,000 | 1,500 ₹33,75,000 | 2,500 ₹56,25,000 |
| 1.05 | Dry Lean Cement Concrete Sub-base: Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mum, aggregate cement ratio not to exceed 15:1, aggregate gradation afler blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content 10 be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing | 1,912.5 | cum | 3,300 ₹63,11,250 | 3,294.07 ₹62,99,908.88 | 3,400 ₹65,02,500 | 2,000 ₹38,25,000 | 4,500 ₹86,06,250 |
| 1.06 | Cement Concrete Pavement: Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing | 3,375 | cum | 6,750 ₹2,27,81,250 | 5,772.36 ₹1,94,81,715 | 6,350 ₹2,14,31,250 | 6,000 ₹2,02,50,000 | 6,200 ₹2,09,25,000 |
| 1.07 | Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cutting: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2. | 675 | cum | 198 ₹1,33,650 | 27.86 ₹18,805.5 | 197 ₹1,32,975 | 150 ₹1,01,250 | 31.12 ₹21,006 |
| 1.08 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.45 | cum | 6,400 ₹60,480 | 5,369.64 ₹50,743.1 | 6,500 ₹61,425 | 5,000 ₹47,250 | 5,000 ₹47,250 |
| 1.09 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 32.76 | cum | 6,600 ₹2,16,216 | 6,171.4 ₹2,02,175.06 | 6,800 ₹2,22,768 | 6,000 ₹1,96,560 | 7,000 ₹2,29,320 |
Tender Value
₹5.0 Cr
EMD Value
₹6.3 L
Closing Date
22 Oct 2025, 5:00 pmClosed
G.M.(Civil), HoD, ECL HQ
Office of the CMD, ECL HQ, Sanctoria, WB 713333
Construction of coal transport road from Quarry no 3 to lower Kenda More near Bahula Siding under Kenda Area ECL
2025_ECL_344835_1
ECL/HQ/GM(C)/e-Tender/25-26/18 date 27.09.2025
Open Tender
Civil Works - Roads
240 days
Kenda Area
Please refer Tender documents.
5 documents required · 5 mandatory
₹6.3 L
15 Jan 2026
3 Oct 2025
23 Oct 2025
3 Oct 2025
22 Oct 2025
4 Oct 2025
3 Oct 2025 - 15 Oct 2025
Amount
Item Description/ Heading
Excavation in Soil using Hydraulic Excavator and Tippers with Disposal upto 1000 metres: Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Compacting Original Ground: Compacting original ground supporting subgrade: Loosening of the ground upto a level of 500mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for subgrade construction
Granular Sub-Base with Graded Material (Table:- 400-1): Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401: For Gradine-V Material
Granular Sub-Base with Graded Material (Table:- 400-1): Plant Mix Method: Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OM, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401: For Grading- III Material
Dry Lean Cement Concrete Sub-base: Construction of dry lean cement concrete Sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mum, aggregate cement ratio not to exceed 15:1, aggregate gradation afler blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content 10 be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing
Cement Concrete Pavement: Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Construction of Subgrade and Earthen Shoulders with Material Deposited from Roadway Cutting: Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Table 300-2.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for Walls any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total impact of GST for the purpose of CTC
COAL MINES ASSOCIATED TRADERS PRIVATE LIMITED (BID ID -1191418)
M/S. Chatterjee Enterprise (BID ID -1191250)
M/S UNITED COAL CARRIERS (BID ID -1191695)
BISWAJYOTI BHATTACHARYYA (BID ID -1190831)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.24 MB
Tendernotice_2.pdf
PDF • 0.66 MB
BOQ_357463.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid