| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.7 LAccepted-AOC | ₹28.7 L Quoted ₹28.8 L | L1 | Accepted-AOC Being lowest |
| 2 | L2₹32.9 LRejected-Finance | ₹32.9 L | L2 | Rejected-Finance Other than lowest |
| 3 | L3₹33.5 LRejected-Finance | ₹33.5 L | L3 | Rejected-Finance Other than lowest |
| 4 | L4₹34.3 LRejected-Finance DAULAT NAGAR SOHALLA ROAD AJIJPUR DHANOLI AGRA UP PIN 282001 | AGRA | UTTAR PRADESH | 282001 | ₹34.3 L | L4 | Rejected-Finance Other than lowest |
| 5 | L5₹34.4 LRejected-Finance | ₹34.4 L | L5 | Rejected-Finance Other than lowest |
| Sl No | Description | Qty | Unit | N.K. ENTERPRISES L20 | yash constructions L9 | m/s rudraksh enterprises L15 | M/S OMKAR SINGH YADAV L12 | Balaji Associates L8 | SHANTI CONSTRUCTIONS L19 | MNR ASSOCIATES L11 | Asha Construction L6 | Attar Singh and Sons L16 | C P Singh and Co L7 | Messars Maa Devi Construction Co. L21 | M/s Rahul Kumar Agrawal L5 | M/S RADHEY GOVIND ENTERPRISES L1 | aman construction & general suppliers L4 | M/s Srijan Construction Company L14 | RAJEEV CONSTRUCTION L10 | Afghani Constructions L18 | M/S DEVENDRA KUMAR GUPTA L17 | M/s Salim Mohomad L3 | M/S APOORVA CONSTRUCTION L13 | shree shyam construction L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down of All loose and de-bonded concrete/ screed, loose particles, dirt etc & Debris upto mother slab should be removed from Bldg. Roof substrate must be pressure-washed with water with, a minimum working pressure of 1,400 psi is to be used to and/or remove all dirt, dust, chalking and waste products. Remove algae, mold by using bleach solution or biowash etc complete all as specified & directed by Engr-in-Charge. | 3,350 | Sqm | 10 ₹33,500 | 20 ₹67,000 | 10 ₹33,500 | 25 ₹83,750 | 15 ₹50,250 | 25 ₹83,750 | 8 ₹26,800 | 30 ₹1,00,500 | 18 ₹60,300 | 30 ₹1,00,500 | 42 ₹1,40,700 | 10 ₹33,500 | 15 ₹50,250 | 15 ₹50,250 | 10 ₹33,500 | 50 ₹1,67,500 | 35 ₹1,17,250 | 70 ₹2,34,500 | 1 ₹3,350 | 50 ₹1,67,500 | 25 ₹83,750 |
| 2.00 | Taking down cement plaster on wall/ceiling/roof etc including raking out joints, hacking for key scrubbing down with water etc complete all as specified and as directed | 560 | Sqm | 10 ₹5,600 | 10 ₹5,600 | 40 ₹22,400 | 15 ₹8,400 | 13 ₹7,280 | 25 ₹14,000 | 18 ₹10,080 | 30 ₹16,800 | 12 ₹6,720 | 20 ₹11,200 | 85 ₹47,600 | 10 ₹5,600 | 10 ₹5,600 | 15 ₹8,400 | 10 ₹5,600 | 30 ₹16,800 | 40 ₹22,400 | 20 ₹11,200 | 1 ₹560 | 20 ₹11,200 | 80 ₹44,800 |
| 3.00 | M&L for 10 to 12 mm smart care ready mix repair plaster is a specially designed ready to use cement-based plaster with high quality polymer additives and well graded sand and fillers wihich can be used for plastering (as per manufacturer instructions) over exterior wall surface complete all as specified and directed | 560 | Sqm | 400 ₹2,24,000 | 200 ₹1,12,000 | 380 ₹2,12,800 | 450 ₹2,52,000 | 249 ₹1,39,440 | 525 ₹2,94,000 | 260 ₹1,45,600 | 325 ₹1,82,000 | 190 ₹1,06,400 | 250 ₹1,40,000 | 330 ₹1,84,800 | 280 ₹1,56,800 | 290 ₹1,62,400 | 350 ₹1,96,000 | 250 ₹1,40,000 | 400 ₹2,24,000 | 250 ₹1,40,000 | 290 ₹1,62,400 | 200 ₹1,12,000 | 320 ₹1,79,200 | 400 ₹2,24,000 |
| 4.00 | M&L for preparing newly plastered surfaces of wall and applying two coats of cement base paint complete all as specified and directed. | 160 | Sqm | 20 ₹3,200 | 22 ₹3,520 | 20 ₹3,200 | 39 ₹6,240 | 19 ₹3,040 | 25 ₹4,000 | 42 ₹6,720 | 55 ₹8,800 | 20 ₹3,200 | 30 ₹4,800 | 70 ₹11,200 | 48 ₹7,680 | 30 ₹4,800 | 30 ₹4,800 | 60 ₹9,600 | 60 ₹9,600 | 40 ₹6,400 | 35 ₹5,600 | 15 ₹2,400 | 40 ₹6,400 | 60 ₹9,600 |
| 5.00 | M&L for repair of All visible hairline cracks on concrete roof / screed more than 0.50 mm and not giving hollow sound, should be cut and widen in V shape with mechanical cutter in the size (10mm W x 6mm D). Fill cracks with PU sealant / Hybrid Sealant with suitable gun and smoothed with a putty knife or trowel. Allow sealant to cure a minimum (72 Hrs.) 3 days etc complete all as specified & director. | 50 | RM | 50 ₹2,500 | 50 ₹2,500 | 200 ₹10,000 | 75 ₹3,750 | 100 ₹5,000 | 70 ₹3,500 | 42 ₹2,100 | 100 ₹5,000 | 80 ₹4,000 | 50 ₹2,500 | 100 ₹5,000 | 50 ₹2,500 | 50 ₹2,500 | 100 ₹5,000 | 50 ₹2,500 | 180 ₹9,000 | 100 ₹5,000 | 50 ₹2,500 | 100 ₹5,000 | 20 ₹1,000 | 100 ₹5,000 |
| 6.00 | M&L for Remove loose and damaged concrete roof screed in pockets with mechanical cutter. Clean the concrete screed with high pressure water jet to remove dirt and loose particles. Brush apply a bond coat of Pidicrete URP mix in the ratio of 1:1 (URP 1: Cement 1) by volume to make it lump free slurry when applied on in the pre wet surface complete all as specified & directed. | 3,750 | Sqm | 170 ₹6,37,500 | 45 ₹1,68,750 | 30 ₹1,12,500 | 27 ₹1,01,250 | 234 ₹8,77,500 | 90 ₹3,37,500 | 54 ₹2,02,500 | 90 ₹3,37,500 | 40 ₹1,50,000 | 100 ₹3,75,000 | 140 ₹5,25,000 | 90 ₹3,37,500 | 50 ₹1,87,500 | 20 ₹75,000 | 50 ₹1,87,500 | 120 ₹4,50,000 | 100 ₹3,75,000 | 90 ₹3,37,500 | 25 ₹93,750 | 120 ₹4,50,000 | 50 ₹1,87,500 |
| 7.00 | M&L Laid to fall roof screed in correct slope and gradient. Mix Dr. Fixit Pidicrete URP 10% by weight of cement in (M20) concrete not less then 40 mm in ratio of 1:1.5:3 i.e., one bag of 50kg cements: 1.5 times volume of sand: 3 times volume of aggregates: 25L water. Level the repair mortar and finish with trowel. Moist cure should be done for 7days. Air cure screed for 7days, before application of roof top coat coating system etc complete all as specified & directed. | 3,350 | Sqm | 180 ₹6,03,000 | 275 ₹9,21,250 | 160 ₹5,36,000 | 270 ₹9,04,500 | 292 ₹9,78,200 | 260 ₹8,71,000 | 260 ₹8,71,000 | 260 ₹8,71,000 | 350 ₹11,72,500 | 250 ₹8,37,500 | 300 ₹10,05,000 | 170 ₹5,69,500 | 220 ₹7,37,000 | 330 ₹11,05,500 | 200 ₹6,70,000 | 150 ₹5,02,500 | 240 ₹8,04,000 | 235 ₹7,87,250 | 200 ₹6,70,000 | 280 ₹9,38,000 | 90 ₹3,01,500 |
| 8.00 | Apply one coat of Cipoxy 16D primer in the ratio 1:1 spreading at the rate of 0.200 kg-0.250 kg /sqm in complete dry condition where moisture contain below 7% (should be checked with moisture meter)Allow the primer coat to dry for 6 to 8 hours complete all as specified as per PS and as directed by Engr-in-Charge. | 3,750 | Sqm | 130 ₹4,87,500 | 300 ₹11,25,000 | 217 ₹8,13,750 | 180 ₹6,75,000 | 92 ₹3,45,000 | 280 ₹10,50,000 | 260 ₹9,75,000 | 335 ₹12,56,250 | 180 ₹6,75,000 | 300 ₹11,25,000 | 300 ₹11,25,000 | 250 ₹9,37,500 | 80 ₹3,00,000 | 135 ₹5,06,250 | 150 ₹5,62,500 | 250 ₹9,37,500 | 270 ₹10,12,500 | 275 ₹10,31,250 | 320 ₹12,00,000 | 200 ₹7,50,000 | 70 ₹2,62,500 |
| 9.00 | Apply 1st coat of Roofseal Classic without dilution spreading at the rate of 0.70/litre/Sq.mt/Coat until all surface is covered. Lay a 45 GSM Fibre glass mesh as a reinforcing material which is incorporated in the coating when the first coat is still in wet condition. Allow the first coat to dry for approximately 4 to 6 hours. Apply two of chemical with the same application coverage, but in a direction perpendicular to that of the first and second coats. Allow each coat to air cure for a minimum of 4-6 hours after application. Check to see no void surface is left untreated / uncoated.Allow the system to air cure for 7 days minimum etc complete all as specified as per PS and as directed by Engr-in-Charge. | 3,750 | Sqm | 600 ₹22,50,000 | 300 ₹11,25,000 | 510 ₹19,12,500 | 401 ₹15,03,750 | 277 ₹10,38,750 | 365 ₹13,68,750 | 340 ₹12,75,000 | 135 ₹5,06,250 | 405 ₹15,18,750 | 200 ₹7,50,000 | 380 ₹14,25,000 | 330 ₹12,37,500 | 340 ₹12,75,000 | 350 ₹13,12,500 | 550 ₹20,62,500 | 320 ₹12,00,000 | 360 ₹13,50,000 | 335 ₹12,56,250 | 320 ₹12,00,000 | 300 ₹11,25,000 | 530 ₹19,87,500 |
| 10.00 | Demolition of brick work or stone masonry including all quoins,arches,pillars etc built in CM complete all as specified & directed. | 4 | Cum | 200 ₹800 | 100 ₹400 | 100 ₹400 | 230 ₹920 | 100 ₹400 | 525 ₹2,100 | 240 ₹960 | 400 ₹1,600 | 300 ₹1,200 | 200 ₹800 | 1,400 ₹5,600 | 300 ₹1,200 | 300 ₹1,200 | 550 ₹2,200 | 100 ₹400 | 500 ₹2,000 | 400 ₹1,600 | 190 ₹760 | 1 ₹4 | 50 ₹200 | 5,000 ₹20,000 |
Tender Value
Refer Docs
EMD Value
₹96,000
Closing Date
18 May 2026, 6:00 pmClosed
Maj Dinoop Kumar
GE (W) Agra
REPAIR TO ROOF TREATMENT UNDER AGE B/R-II OF GE (WEST) AGRA
2026_MES_762349_1
8012/1181/E8
Open Tender
Civil Works
180 days
GE (W) Agra
Please refer tender docuement
9 documents required · 9 mandatory
₹500
GE (W) Agra
₹96,000
25 Jun 2026
27 Apr 2026
25 May 2026
27 Apr 2026
18 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down of All loose and de-bonded concrete/ screed, loose particles, dirt etc & Debris upto mother slab should be removed from Bldg. Roof substrate must be pressure-washed with water with, a minimum working pressure of 1,400 psi is to be used to and/or remove all dirt, dust, chalking and waste products. Remove algae, mold by using bleach solution or biowash etc complete all as specified & directed by Engr-in-Charge. | 3,350 | Sqm | - | - |
| 2 | Taking down cement plaster on wall/ceiling/roof etc including raking out joints, hacking for key scrubbing down with water etc complete all as specified and as directed | 560 | Sqm | - | - |
| 3 | M&L for 10 to 12 mm smart care ready mix repair plaster is a specially designed ready to use cement-based plaster with high quality polymer additives and well graded sand and fillers wihich can be used for plastering (as per manufacturer instructions) over exterior wall surface complete all as specified and directed | 560 | Sqm | - | - |
| 4 | M&L for preparing newly plastered surfaces of wall and applying two coats of cement base paint complete all as specified and directed. | 160 | Sqm | - | - |
| 5 | M&L for repair of All visible hairline cracks on concrete roof / screed more than 0.50 mm and not giving hollow sound, should be cut and widen in V shape with mechanical cutter in the size (10mm W x 6mm D). Fill cracks with PU sealant / Hybrid Sealant with suitable gun and smoothed with a putty knife or trowel. Allow sealant to cure a minimum (72 Hrs.) 3 days etc complete all as specified & director. | 50 | RM | - | - |
| 6 | M&L for Remove loose and damaged concrete roof screed in pockets with mechanical cutter. Clean the concrete screed with high pressure water jet to remove dirt and loose particles. Brush apply a bond coat of Pidicrete URP mix in the ratio of 1:1 (URP 1: Cement 1) by volume to make it lump free slurry when applied on in the pre wet surface complete all as specified & directed. | 3,750 | Sqm | - | - |
| 7 | M&L Laid to fall roof screed in correct slope and gradient. Mix Dr. Fixit Pidicrete URP 10% by weight of cement in (M20) concrete not less then 40 mm in ratio of 1:1.5:3 i.e., one bag of 50kg cements: 1.5 times volume of sand: 3 times volume of aggregates: 25L water. Level the repair mortar and finish with trowel. Moist cure should be done for 7days. Air cure screed for 7days, before application of roof top coat coating system etc complete all as specified & directed. | 3,350 | Sqm | - | - |
| 8 | Apply one coat of Cipoxy 16D primer in the ratio 1:1 spreading at the rate of 0.200 kg-0.250 kg /sqm in complete dry condition where moisture contain below 7% (should be checked with moisture meter)Allow the primer coat to dry for 6 to 8 hours complete all as specified as per PS and as directed by Engr-in-Charge. | 3,750 | Sqm | - | - |
| 9 | Apply 1st coat of Roofseal Classic without dilution spreading at the rate of 0.70/litre/Sq.mt/Coat until all surface is covered. Lay a 45 GSM Fibre glass mesh as a reinforcing material which is incorporated in the coating when the first coat is still in wet condition. Allow the first coat to dry for approximately 4 to 6 hours. Apply two of chemical with the same application coverage, but in a direction perpendicular to that of the first and second coats. Allow each coat to air cure for a minimum of 4-6 hours after application. Check to see no void surface is left untreated / uncoated.Allow the system to air cure for 7 days minimum etc complete all as specified as per PS and as directed by Engr-in-Charge. | 3,750 | Sqm | - | - |
| 10 | Demolition of brick work or stone masonry including all quoins,arches,pillars etc built in CM complete all as specified & directed. | 4 | Cum | - | - |
stage.html
html • 0.10 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
Tender.pdf
Tender Documents • 0.68 MB
BOQ_853925.xls
BOQ • 2.40 MB
Download all tender documents and submit your bid