| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 CrAccepted-AOC 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹11.9 Cr+₹34.7 L (3.01%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹12.1 Cr+₹52.1 L (4.51%)Rejected-AOC H 99 6TH CROSS STREET R M COLONY DINDIGUL | L3 | Rejected-AOC L3 | |
| 4 | L4₹12.1 Cr+₹57.9 L (5.02%)Rejected-AOC 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L4 | Rejected-AOC L4 |
Tender Value
₹11.5 Cr
EMD Value
₹5.9 L
Closing Date
5 Jan 2026, 3:00 pmClosed
Superintending Engineer, NH,Madurai
O/o Superintending Engineer, National Highways, No.5, Besant Road, ChinnaChokkikulam Madurai 02
Widening from IL to DL and strengthening at km 0/0 - 9/0 of Kallal - Devakottai road including reconstruction of culverts at km 0/4, 8/2 and construction of retaining wall at km 6/2 (M1287)
2025_MoRTH_888236_1
TN No 20/2025-26/HDO/NH/Dt.03.12.25
Open Tender
Civil Works - Roads
Percentage
210 days
Devakottai
As per Tender documents
5 documents required · 5 mandatory
₹17,700
Divisional Engineer NH Madurai
₹5.9 L
O/o Superintending Engineer, NH,Madurai
9 Mar 2026
3 Dec 2025
7 Jan 2026
3 Dec 2025
5 Jan 2026
19 Dec 2025
19 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B including cost of all labour charges, materials, tools, equipments and all incidental charges, including compacting with power roller, watering, including all hire and fuel charges for all tools and plants, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For embankment / sub grade Box Cutting for widening portion | - | cum | 143.68 | - |
| 2 | Construction of Granular Sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 & IRC 37-2018 - for Grading-V Material. | 1 | cum | 2,415.67 | ₹2,413.25 |
| 3 | Construction of Granular Sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 & IRC 37-2018 - for Grading-III Material | 1 | cum | 2,688.7 | ₹2,686.01 |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 250mm thick, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 1 | cum | 2,898.25 | ₹2,895.35 |
| 5 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5. | 1 | sqm | 86.42 | ₹86.33 |
| 6 | Providing and laying Tack Coat over WBM/ WMM surface (treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 502 of MoRTH Rev-V. | 1 | sqm | 19.93 | ₹19.91 |
| 7 | Providing and laying Tack Coat over Existing BT surface using 2 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 1 | sqm | 28.79 | ₹28.76 |
| 8 | Providing and laying Tack Coat over Existing Concrete surface using 3 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | - | sqm | 22.53 | - |
| 9 | Providing, laying consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 - Grade I (80mm Thick) - Widening Portion Only | - | cum | 10,305.25 | - |
| 10 | Providing, laying consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant 20- 30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5 - Grade II (50mm Thick) - Strengthening Portion Only | 1 | cum | 11,083.24 | ₹11,072.16 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_933596.xls
BOQ • 0.29 MB
DOCKallai.rar
Tender Documents • 2.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .