Tender Value
₹36.2 L
EMD Value
₹36,200
Closing Date
25 May 2026, 5:00 pmClosed
Superintending Engineer, Irrigation Circle, Medak
Superintending Engineer, Irrigation Circle, Medak
3rd call - Restoration of Manchigutta Check Dam on Patha Vagu, Jangarai (V), Shanakarampet-R(M), Medak Dist.
700359
10/SE/IC/MDK/2026-27, Dt:15.05.2025
OPEN
Civil Works
MEDAK
13 documents required · 11 mandatory · 2 optional
₹1,282
₹36,200
9 Jun 2026
15 May 2026
16 May 2026
Excavation for Structers- Mechanical Means Earth work in excavation in all kinds of foundation of structures as per drawing and technical specification including setting out. Construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material depth upto 3 meters)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N/sq mm) grade cemen concrete using 40mm down size approved, clean, hard, graded aggregates for foundation including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50m and all lifts. (foundation)
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure/ super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position levelling, vibrating, finishing, curing etc.,(Skin Wall)
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing ,placing inposition, levelling, vibrating, finishing, curins etc., complete for plain concrete works with initial lead upto 1km and all lifts.(Super Structure)
Providing and laying insitu M-20 (28 days cube compressive strength not less than 20 N/sqmm) grade cement concrete using 20 min down size approved, clean, hard, gradedaggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 mand all lifts.
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller/Vibratory roller/8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial leadupto 50m and all lifts.
Excavation for Structers- Mechanical Means Earth work in excavation in all kinds of foundation of structures as per drawing and technical specification including setting out. Construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material depth upto 3 meters)
Providing and laying insitu vibrated M-10 ( 28 days cube compressive strength not less than 10 N/sq mm) grade cemen concrete using 40mm down size approved, clean, hard, graded aggregates for foundation including cost of all materials, machinery, labour, formwork, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with initial lead upto 50m and all lifts. (foundation)
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure/ super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position levelling, vibrating, finishing, curing etc.,(Skin Wall)
Providing and laying insitu vibrated M-15 (28 days cube compressive strength not less than 15 N/sq mm) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates including cost of all materials, machinery, labour, formwork, centering, scaffolding, cleaning, batching, mixing ,placing inposition, levelling, vibrating, finishing, curins etc., complete for plain concrete works with initial lead upto 1km and all lifts.(Super Structure)
Providing and laying insitu M-20 (28 days cube compressive strength not less than 20 N/sqmm) grade cement concrete using 20 min down size approved, clean, hard, gradedaggregates for wearing coat including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position in alternate panels, levelling, compacting, finishing, curing, packing joints with asphalt mortar etc., complete with initial lead upto 50 mand all lifts.
Providing homogeneous embankment using soil from approved borrow area in layers of 25 to 30 cm before compaction including cost of all materials, machinery, labour, all operations such as excavation, sorting out, transportation, spreading soil in layer of specified thickness, breaking clods, sectioning, watering, compacting to density control of not less than 95 percent or as stipulated using Sheep foot roller/Vibratory roller/8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts
Providing, fabricating and placing in position reinforcement steel bars for RCC works including cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required,tying with 1.25 mm dia soft annealed steel wire, including cost of all materials, machinery, labour etc., complete with initial leadupto 50m and all lifts.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
3rd call Manchigutta CD on Patha Vagu Boq.xls
TENDER_DOCUMENT • 0.56 MB
3rdd call Manchigutta CD on Patha Vagu Schedule A.xls
TENDER_DOCUMENT • 0.44 MB
Specification_Booklet (2).docx
TENDER_DOCUMENT • 5.94 MB
Bid Document of 3rd call Manchigutta CD on Patha Vagu.docx
TENDER_DOCUMENT • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .