| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC | ₹6.0 Cr | L1 | Accepted-AOC 1ST LOWEST |
| 2 | L2₹6.0 Cr+₹12,229.70 (0.02%)Rejected-Finance CHITRAKAR PARA NEW TOWN COOCHBEHAR 736101 WEST BENGAL INDIA | COOCH BEHAR | COOCH BEHAR | WEST BENGAL | 736101 | ₹6.0 Cr+₹12,229.70 (0.02%) | L2 | Rejected-Finance MORE THAN 1ST LOWEST |
| 3 | L3₹6.1 Cr+₹7.6 L (1.26%)Rejected-Finance WARD NO 14 ROY CONSTRUCTION BAZAR PARA WEST JHAGRAKHAND KHONGAPANI KORIYA CHHATTISGARH 497448 UDYAM CG 30 0001412 | KOREA | CHHATTISGARH | 497448 | ₹6.1 Cr+₹7.6 L (1.26%) | L3 | Rejected-Finance MORE THAN 1ST LOWEST |
Tender Value
₹6.1 Cr
EMD Value
₹10 L
Closing Date
15 Jan 2026, 10:00 amClosed
SE,CTU
Central Tender Unit Jalasampad Bhawan, 8thFloor, Salt Lake, Kolkata-700091
Protection work along the right bank of river Singimari (Mansai) From Ch. 1600 meter to 2800 meter at Dakshin Singimari, Chatt Singimari and Andaran Singimari area within G.P.- B.R. Chatra, Block an P.S. Sitai, Dist. Coochbehar(PIN-736167) (Sorasori
2025_IWD_977950_1
WBIW/CTU/CE(North East) /e-NIT- 16 (e)/ 2025-26
Open Tender
CIVIL WORKS
Percentage
175 days
Mansai
Please refer Tender documents.
6 documents required · 6 mandatory
₹10 L
Yes
Central Tender Unit Jalasampad Bhawan, 8thFloor, S
10 Sept 2026
24 Dec 2025
16 Jan 2026
24 Dec 2025
15 Jan 2026
24 Dec 2025
29 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in the canals / drainage channels / borrowpits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30metre and initial lift of 1.5metre including break inlods, rough dressing etc.complete as per direction of the Engineer-in-charge.
Ordinary soil/localsoil/soil mixed with moorum or kankar/silt, dry or moist / slushy silt / sticky soil | 39,114.34 | Cum | 129.91 | ₹50,81,344.04 |
| 2 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulders in apron as per direction of the Engineer-in-charge. (Quarry be belongs to Forest Deptt Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
Boulder above 30 kgs each 70%, above 20 kgs each 20% and above 10 kgs each 10% | 17,280 | Cum | 2,173.29 | ₹3,75,54,451.2 |
| 3 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for boulder pitching on top and slope by placing required boulders (Boulder above 20kg each within lead of 100 metres and all lifts) including filling the interstices with fragments as required, preparing sub- grade by cutting or filling the earth on slope up to 7.5cm. depth, watering and ramming where necessary complete but excluding the cost of shingle of filling materials as per direction of the Engineer-in-charge. (Quarry bed belongs to Forest Deptt Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
c) Boulder above 20 kgs each. | 3,544.55 | Cum | 2,449.9 | ₹86,83,793.05 |
| 4 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty and labour charges for providing filter with well graded 40mm down stone metal/ shingles sand laying uniformly below pitching on bed, side slope including preparing bed with earth work upto 30 cm depth, where necessary and compacting as per direction of the Engineer-In-Charge and including all leads and lifts complete but excluding the cost of supply and carriage of stone metal upto site
(Quarry bed belongs to L. & L. R Deptt. Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
e) Shingles for Slope Pitching | 1,149.19 | Cum | 1,864.33 | ₹21,42,461.94 |
| 5 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and including all incidental charges like Royalty.(Quarry bed belongs to L. & L. R Deptt. Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
e) Shingles for Interstices filling | 545.32 | Cum | 1,435.28 | ₹7,82,681.15 |
| 6 | Quarrying, Carrying, Supplying stone boulders/shingles from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading and carriage including all incidental charges like Royalty and labour charges for laying boulders in road as per direction of the Engineer-in-charge. (Quarry be belongs to Forest Deptt Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
d) Boulder above 10 kgs each. | 289.28 | Cum | 2,158.5 | ₹6,24,410.88 |
| 7 | Quarrying, Carrying, Supplying bed material/Coarse sand from the Engineer-in-charge selected quarrying site to the site of work including cost of material, loading, unloading, stacking and carriage and labour charges of laying River Bed Materials from stack of work site with all leads and lifts in slope, base of apron, on the road surface and dressing the exposed faces. ( Make volume to be arrived by deducting 1/10th the voids from gross volume) (Quarry bed belongs to L. & L. R Deptt. Govt of W.B)
N.B.The construction wing is to add royalty and other related fees at the presently prescribed rates for forest and non-forest area as stated below to arive at the total rate at quarry site till such rates are modified by the Forest Department and Department of Industry, Commerce & Enterprises, Government of West Bengal. (a) For Forest area Royalty including entry fee and TP fee : Rs. 178.33 per Cum (b) For Non-Forest area Royalty : Rs. 106.00 per Cum Royalty( including other charges wherever applicable) certificates in original from competent authority are to be submitted along with the bill, otherwise amount due towards Royalty( including other charges wherever applicable, but excluding GST) will be deducted from the bills of works .
f) River bed material: | 202.5 | Cum | 1,422.17 | ₹2,87,989.43 |
| 8 | Carriage of boulder by tractor trolley or other vehicle on land route including loading, unloading without stacking. | 20,824.55 | Cum | 271.73 | ₹56,58,654.97 |
| 9 | Carriage of shingles by tractor trolley or other vehicle on land route including loading, unloading without stacking | 1,694.5 | Cum | 196.36 | ₹3,32,732.41 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.68 MB
WB2911.pdf
Tender Documents • 1.86 MB
barchart1.pdf
Tender Documents • 0.18 MB
BOQ_2383376.xls
BOQ • 0.31 MB
drawing1.pdf
Tender Documents • 0.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .