Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical MOHALLA BAZAR MIRANPUR KATRA SHAHJAHANPUR | SHAHJAHANPUR | UTTAR PRADESH | 242001 | Accepted-Technical responsive |
| 2 | Accepted-Technical 15 KASARAK MIRANPUR KATRA TILHAR SHAHJAHANPUR | SHAHJAHANPUR | UTTAR PRADESH | 242001 | Accepted-Technical responsive |
| 3 | Accepted-Technical 62 | LUCKNOW | UTTAR PRADESH | 226001 | Accepted-Technical responsive |
Tender Value
Refer Docs
EMD Value
₹29,000
Closing Date
3 Aug 2026, 12:00 pmClosed
senior geophysicist
sr geo gwd jhansi
Construction of Roof Top Rain Water Harvesting Structures at Kasturba Gandhi Balika Vidyalay, Rupa Dhamna, Block-Mauranipur
2026_UPGWD_1172875_1
01/RWH (2026-27)/Jhansi
Open Tender
Civil Works - Others
Lump-sum
30 days
Kasturba Gandhi Balika Vidyalay, Rupa Dhamna, B
4 documents required · 4 mandatory
₹854
₹29,000
3 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
3 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Laying and Jointing PVC Pipe. Heading | |||||
| 1.01 | Brick work in C.M 1:5 mix including all labour charges etc complete | 60 | RM | 586.32 | ₹35,179.2 |
| 1.02 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | 20 | Per Hour | 821.9 | ₹16,438 |
| 1.03 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 37 | RM | 600.87 | ₹22,232.19 |
| 1.04 | Brick work in C.M 1:5 mix including all labour charges etc complete | 20 | RM | 611.62 | ₹12,232.4 |
| 1.05 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | 1 | Set | 1,529.38 | ₹1,529.38 |
| 1.06 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 4.71 | Cum | 6,300 | ₹29,673 |
| 1.07 | Brick work in C.M 1:5 mix including all labour charges etc complete | 1 | RM | 946.84 | ₹946.84 |
| 1.08 | Brick work in C.M 1:5 mix using 2nd class ground moulded chamber burnt bricks with including cost and conveyance of all materials and including all labour charges etc complete | 1 | No. | 186.68 | ₹186.68 |
| 1.09 | Plastering in C.M 1:5-12 mm thick with including cost and conveyance of all materials and including all labour charges etc complete | 1 | No. | 243.91 | ₹243.91 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
bidrupadhmana.pdf
Tender Documents • 2.18 MB
BOQ_2202553.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .