Loading…
Loading…
| # | Company | Offered Item | Amount | Rank |
|---|---|---|---|---|
| 1 | L1₹3.6 L A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | L1 | |
| 2 | L2₹4.5 L+₹88,427.33 (24.4%) A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | L2 | |
| 3 | L3₹4.7 L+₹1.1 L (30.2%) A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | L3 | |
| 4 | L4₹5.0 L+₹1.4 L (38.5%) A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | L4 | |
| 5 | L5₹5.1 L+₹1.4 L (39.3%) A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.). | L5 |
| Sl No | Description | Qty | Unit | Kamlesh Kumar Sharma L2 | Kuldeep Bhardwaj L3 | Munish Sharma L6 | Yash Pal Singh L1 | Vikas Kumar L5 | Ashwani Vij L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Civil items | - | - | -19.19 ₹4,51,409.51 | -15.4 ₹4,72,580.68 | -8 ₹5,13,917.52 | -35.02 ₹3,62,982.18 Lowest | -9.5 ₹5,05,538.43 | -9.99 ₹5,02,801.26 |
Tender Value
₹5.6 L
EMD Value
₹11,172
Closing Date
23 Jul 2024, 3:00 pmClosed
AE-C-4
Anubhav Kumar
Assistant Engineer-I, CPWD,
A/R & M/O to GPRA at Longwood and Craigdhu Shimla during 2024-25. SH: Provision of retaining wall for protection of earth against erosion and sliding at upper side of Sylvan Hall at Longwood Shimla (H.P.).
82584
119/2024-25/EE-1/AE-1/Shimla
OPEN
Civil Works - Buildings
NCB
21 days
Shimla, Himachal Pradesh
12 documents required · 12 mandatory
₹11,172
Not Applicable
23 Jul 2024
20 Jul 2024
23 Jul 2024
23 Jul 2024
22 Jul 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Index.pdf
document • 0.89 MB
NIT.pdf
document • 3.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .