Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.4 L+₹10,248.19 (1.92%)Rejected-Finance 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.5 L+₹13,144.14 (2.46%)Rejected-Finance R O MURADNAGAR DISTT GHAZIBABAD | GHAZIPUR | UTTAR PRADESH | 232325 | L3 | Rejected-Finance L3 | |
| 4 | L4₹5.5 L+₹15,547.30 (2.91%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹5.6 L+₹21,172.04 (3.96%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹13,000
Closing Date
2 Jul 2021, 1:00 pmClosed
EE ID AYODHYA
O/O EE ID AYODHYA
LOT NO 43-Rreconstructing of V.R.B. at km 3.100 Of Khirouni Minor.
2021_UPIDC_593242_50
02/E.E./2021-22
Open Tender
Civil Works
Item Rate
40 days
AYODHYA
AS PER TENDER DOCUMENT
2 documents required · 2 mandatory
₹1,151
₹13,000
17 Dec 2022
25 Jun 2021
2 Jul 2021
25 Jun 2021
2 Jul 2021
25 Jun 2021
Amount
Earth work in making diversion from ordinary soil Including lead upto 100 m and lift 1.50m with manual compaction and proper comletion of work as per direction engineer in charge.
Dismantling R.C.C. , Including stacking of dismantled material as directed by engineer- in- charge with in distance of 60 mtr.
Dismantalling of brick work in cement mortar, Including stacking of dismantled materials as directed by engineer-in- charge within a distance of 60M.
Dry Earth work in foundation of masonry work on channels of discharge above 10 cumecs, Including all lead & lift including disposal and back filling with all cost of labour and T&P etc.
Providing and laying of cement concrete (M-10) 1:3:6 (1 cement :3 Coarse sand: 6 stone grit 20-40 mm nominal size) in foundation, Including supply of all materials, labour, tools & plants and centering, shuttering etc. required for proper completion of work
Brick masonry in 1:4 Cement and coarse sand mortar using class 150 bricks complete in all respect, Including all leads, lifts, all cost of material, labour and T&P etc. required for porper completion of the work.
Centering & shutering for R.C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work.
Centering & shutering for C.C. work including all cost of material, labour and T&P etc. required for porper completion of the work.
Steel Bending, Binding, Cutting and Placing in proper position, Including all cost of labour and material T&P etc. required for porper completion of the work.
Laying RCC of concrete grade 1:1.5:3 in slab and bed block with coarse sand and stone grit size 4.75 mm to 20 mm and cement, Including all cost of material, labour and T&P etc. required for porper completion of the work.
Laying CC of concrete grade 1:1.5:3 in wearing coat and parapet with coarse sand and stone grit size 4.75 mm to 20 mm and cement , Including all cost of material, labour and T&P etc. required for porper completion of the work.
Deep struck Cement Pointing with cement and coarse sand mortar 1:2 complete in all respect, Including all lead, lifts, cost of material, labour and T&P etc.
Providing & Fixing drainage pipe in slab of 75 mm dia PVC Including all cost of material, labour and T&P etc. required for porper completion of the work.
Laying Class M-150 brick soling, including all cost of labour and T&P as per direction of Engineer in charge.
Providing and Placing 20 mm thick joint filler board with all cost of material, labour and T&P etc. complete.
M/S OM CONSTRUCTION COMPANY
R K CONSTRUCTION
M/S AVNISH SINGH
J.P.ASSOCIATES
M/S DN CONSTRUCTION
M/S- S. CONSTRUCTION
SATYANAM YADAV THEKEDAR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .