Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹97.7 LAdmitted-Technical | L1 | Admitted-Technical BQR satisfied | |
| 2 | L2₹1.3 Cr+₹28.5 L (29.1%)Admitted-Technical | L2 | Admitted-Technical BQR Satisfied | |
| 3 | L4₹1.9 Cr+₹90.1 L (92.2%)Admitted-Technical NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | L4 | Admitted-Technical BQR satisfied | |
| 4 | L3₹1.3 Cr+₹35.9 L (36.7%)Rejected-Technical 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L3 | Rejected-Technical BQR not satisfied | |
| 5 | L5₹2.0 Cr+₹1.1 Cr (109.3%)Rejected-Technical | L5 | Rejected-Technical BQR not satisfied |
| Sl No | Description | Qty | Unit | S S AND CO L3 | H.Venkateswaran L2 | K DHINAKARAN L4 | PERUMAL.S.K L6 | kaavya enterprises L5 | Dillibabu L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Conducting check survey in the already fixed route, Fixing of tower location and pit marking. jungle clearance, tree cutting etc complete. | 2 | Loc | 2,000 ₹4,000 | 5,000 ₹10,000 | 1,000 ₹2,000 | 2,000 ₹4,000 | 2,000 ₹4,000 | 500 ₹1,000 Lowest |
| 2.00 | Detailed soil investigation , FSS requires Pile Foundation upto required depth | 2 | Nos | 20,000 ₹40,000 | 30,000 ₹60,000 | 20,000 ₹40,000 | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest | 5,000 ₹10,000 Lowest |
| 3.00 | Earth work excavation in all soils including cost of all materials labour, lead, lift etc. complete as directed by the Engineer at site.for Hard Gravelly Soil. | 390 | m3 | 60 ₹23,400 Lowest | 300 ₹1,17,000 | 250 ₹97,500 | 100 ₹39,000 | 100 ₹39,000 | 150 ₹58,500 |
| 4.00 | PCC 1 : 3 : 6 Grade using 20 mm HBG metal for padding and footing concrete without form work including cost of all materials curing, labour, lead and lift. etc., complete. | 13 | m3 | 4,000 ₹52,000 | 4,600 ₹59,800 | 6,000 ₹78,000 | 6,000 ₹78,000 | 6,000 ₹78,000 | 1,000 ₹13,000 Lowest |
| 5.00 | Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., to location by pulling into river using crane including transport and hire charges etc., complete. | 2 | Loc | 30,000 ₹60,000 | 30,000 ₹60,000 | 10,000 ₹20,000 Lowest | 9,50,000 ₹19,00,000 | 9,40,000 ₹18,80,000 | 10,000 ₹20,000 Lowest |
| 6.00 | Setting of piling and boring equipment, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer incharge at site irrespective of the location and distance of the boring rig for 600 mm dia pile including mobilisation and demobilisation after completion of pilling works etc., complete. | 32 | Nos | 3,200 ₹1,02,400 | 5,000 ₹1,60,000 | 2,500 ₹80,000 | 4,000 ₹1,28,000 | 4,000 ₹1,28,000 | 200 ₹6,400 Lowest |
| 7.00 | Supplying, fabrication of 6 mm M.S. sheet for making into circular encasing pipe to the required depth and diameter including welding, placing in position and driving into bore hole including cost of all materials , MS plate, all labour charges etc., complete. For 1000mm Dia | 100 | RM | 7,500 ₹7,50,000 | 4,000 ₹4,00,000 | 100 ₹10,000 | 9,000 ₹9,00,000 | 9,000 ₹9,00,000 | 10 ₹1,000 Lowest |
| 8.00 | Boring and concreting of vertical reinforced concrete pile of 1000mm dia upto required depth from tip of the in all clauses of soil using pile augurs for boring using Bentonite slurry and filling the bore with RCC M30 concrete using 20 mm machine crushed metal and a maximum water cement ratio not exceeding 0.45 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete (But excluding cost of steel reinforcement). | 500 | RM | 6,500 ₹32,50,000 | 4,500 ₹22,50,000 | 16,500 ₹82,50,000 | 10,000 ₹50,00,000 | 10,000 ₹50,00,000 | 4,400 ₹22,00,000 Lowest |
| 9.00 | Chipping and dismantling of pile concrete from bed level to cutoff level of pile to met sound concrete and clearing the dismantled concrete from pile location including cost of all labour charges etc., complete. | 31 | cum | 2,000 ₹62,000 | 3,000 ₹93,000 | 6,000 ₹1,86,000 | 5,000 ₹1,55,000 | 5,000 ₹1,55,000 | 1,000 ₹31,000 Lowest |
| 10.00 | RCC M30 using 12 to 20 mm HBG metal for pile cap with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift etc., complete but excluding cost of steel reinforcement. | 90 | Cum | 8,000 ₹7,20,000 | 6,500 ₹5,85,000 Lowest | 14,000 ₹12,60,000 | 17,500 ₹15,75,000 | 17,500 ₹15,75,000 | 8,000 ₹7,20,000 |
Tender Value
₹1.5 Cr
EMD Value
₹1.5 L
Closing Date
9 Nov 2021, 2:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE/TP-I/CHN
A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Dismantling of 2 Nos. of existing tower and erection of 2 Nos of 110 KV Cable Termination towers in Kadapperi-Korattur I and II 110 KV DC line in between Loc 35 and 38 for the proposed Kumananchavadi elevated Metro station under DCW as per the reques
2021_EB_212459_1
TP-014/2021-22
Open Tender
Civil Works
Works
120 days
THIRUVALLUR
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹1.5 L
13 Dec 2021
28 Oct 2021
10 Nov 2021
28 Oct 2021
9 Nov 2021
28 Oct 2021
180 days
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .