Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC 17 A SHYAMA JI PURAM I I T SOCIETY IIT KALYANPUR KANPUR UTTAR PRADESH 208016 | KANPUR NAGAR | UTTAR PRADESH | 208016 | ₹4.1 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹4.3 Cr+₹20.5 L (4.99%)Rejected-Finance | ₹4.3 Cr+₹20.5 L (4.99%) | L2 | Rejected-Finance High Quoted |
| 3 | L3₹4.5 Cr+₹36.9 L (8.99%)Rejected-Finance MALLAGUNDA | ₹4.5 Cr+₹36.9 L (8.99%) | L3 | Rejected-Finance High Quoted |
Tender Value
₹4.1 Cr
EMD Value
₹2.2 L
Closing Date
28 Aug 2025, 2:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Highways C and M Tirunelveli AR Line Road Palayamkottai
Widening from Single lane to Intermediate lane and Strengthening in Km.3/400-6/0 of Panikuruppu-Esalimadai road including Reconstruction of Box culverts at Km. 3/6, 3/10, 4/2, 4/4, 4/10(i), (ii), 5/4, 5/6 (TNV-35)
2025_HWAY_591277_1
TN.No.10/2025-2026/HDO, Dated.04.08.2025
Open Tender
Civil Works - Highways
Percentage
150 days
Aruppukottai
Average Annual Turnover
Completed Contracts
Minimum quantities of works in 1yr during the last 5yrs
Personnel capabilities
Equipment capabilities
Financial position
Audited balance sheet for the last 5yrs
Litigation history
Bid capacity
9 documents required · 9 mandatory
₹0
₹2.2 L
17 Dec 2025
11 Aug 2025
28 Aug 2025
11 Aug 2025
28 Aug 2025
12 Aug 2025
eProcurement System Government of Tamil Nadu Created By: Belsiya Jabaraj raja singh Created Date/Time: 10-Sep-2025 12:21 PM Tender Title: TNV 35 Aruppukottai H C M Sub division Tender ID: 2025_HWAY_591277_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Tirunelveli Circle
Widening from Single lane to Intermediate lane and Strengthening in Km.3/400-6/0 of Panikuruppu-Esalimadai road including Reconstruction of Box culverts at Km. 3/6, 3/10, 4/2, 4/4, 4/10(i), (ii), 5/4, 5/6 (TNV-35) Road A: Widening from Single lane to Intermediate lane and Strengthening in Km.3/400-6/0 of Panikuruppu-Esalimadai road including Reconstruction of Box culverts at Km. 3/6, 3/10, 4/2, 4/4, 4/10(i), (ii), 5/4, 5/6.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 SREE BALAJI CONSTRUCTIONS (GSTN-33AAXPS4504N1ZM) BID ID -1440398 34744263.462 5.000 43048142.000 Four Crore Thirty Lakh Fourty Eight Thousand One Hundred and Fourty Two
2.00 KRISHNA AND CO (GSTN-33AASFJ4398M1ZH) BID ID -1441514 34744263.462 0.010 41002330.000 Four Crore Ten Lakh Two Thousand Three Hundred and Thirty
3.00 LAKSHMI CONSTRUCTIONS (GSTN-NA) BID ID -1441409 34744263.462 9.000 44688071.000 Four Crore Fourty Six Lakh Eighty Eight Thousand Seventy One
Lowest Amount Quoted BY: KRISHNA AND CO(41002330.000)
BOQ Summary Details Tender Title: TNV 35 Aruppukottai H C M Sub division Tender ID: 2025_HWAY_591277_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 KRISHNA AND CO (BID ID -1441514) 41002330.000 L1
2 SREE BALAJI CONSTRUCTIONS (BID ID -1440398) 43048142.000 L2
3 LAKSHMI CONSTRUCTIONS (BID ID -1441409) 44688071.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .