Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.2 Cr+₹14.0 L (6.92%)Admitted-Finance | ₹2.2 Cr+₹14.0 L (6.92%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹17.8 L (8.82%)Admitted-Finance | ₹2.2 Cr+₹17.8 L (8.82%) | L3 | Admitted-Finance |
| 4 | L4₹2.2 Cr+₹21.4 L (10.6%)Admitted-Finance | ₹2.2 Cr+₹21.4 L (10.6%) | L4 | Admitted-Finance |
| 5 | L5₹2.2 Cr+₹21.8 L (10.8%)Admitted-Finance | ₹2.2 Cr+₹21.8 L (10.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S R.S. ENTERPRISES L4 | GANPATI COMMUNICATION SERVICES L1 | M/S Anil Brothers L3 | M/S Jindal Electricals L5 | POWER GEN ENGG CO L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00Supply installation testing & Commissioning of star rated Copper wound distribution Transformer ( All the distribution transformer must be star rated as per notification of (BEE) ministry of power, Goverenment of India) of following rating 11/0.433KV Delta-Star Connected, Vector Group Dyn 11, ONAN Cooled & as per BEE star level- 2 & BIS approved as per IS 2026-1977 & losses as defined as per IS 1180 part I 2014. including standard accessories like conservator, silica gel breather,Bucholz relay, radiator, fins, HT cable box & LT cable boxes, Off -LTC (+5% to - 10% @ 2.5%) temperature rise of 40 degree C in oil / 45 degree C in winding , ISI marked drain valve, Dial type Temperature gauge, first filling of transformer oil as per IS :335-1953 , Epoxy based paint, including carrying of pre-commission Testing & Charging of Transformer complete in all respect. NABL accredeated / CPRI/ ERDA lab testing reports with OEM certificate must submitted to engineer in charge .Transformer must be tested from CTL test lab of discom (if reqd.) before charging of transformer & complete installaion must be certified from Electrical Inspectorate office as per Indian Electricity rule, CTL testing charges & Inspection charges shall be reimbursed by the department to the contractor as per actual expenditure. Makes as per pre approval by Engineer in charge. | ||||||||
| 1.10 | 315 KVA Cu Wound | 8 | Each | 7,95,000 ₹63,60,000 | 7,80,000 ₹62,40,000 Lowest | 8,80,000 ₹70,40,000 | 9,50,000 ₹76,00,000 | 8,95,000 ₹71,60,000 |
| 2.00Supply and erection of hot dipped galvanised steel swaged tubular pole conforming to IS: 2713-1980 (part I to II) with galvanised base plate in position including excavation of the pit and filling the same with C.C. of M-20 grade (1:1.5:3) from base plate to 50cm above ground level, with the help of steel frame not less than 40 cm dia up to 114.3mm outer dia and 50 cm beyond 114.3mm outer dia around the pole. Duly finished with cement plaster, earthing terminals , cable entry, GI cable sleeve complete as required. The pole shall be galvanised using ISI mark seamless tube for structural purpose of following height & designation. ( See Table E - 09 for specs. ) | ||||||||
| 2.10 | 9.0 Mtr. ( 410 SP - 28 ) Labor rate only | 65 | Each | 1,000 ₹65,000 | 700 ₹45,500 | 250 ₹16,250 | 100 ₹6,500 Lowest | 750 ₹48,750 |
| 3.00Supply and erection of P.C.C./R.C.C. pole as per REC manual no 15/1979 conforming to IS: 2905/1966 including excavation of pit and back filling with stone aggregate/boulders and soil in 0.45m consolidating each deposited layer of 0.45m by ramming and watering etc complete in all respect. | ||||||||
| 3.10 | 9.0 Mtr long (200 Kg ) as per Discom specification Labor rate only | 15 | Each | 1,000 ₹15,000 | 100 ₹1,500 Lowest | 400 ₹6,000 | 100 ₹1,500 Lowest | 300 ₹4,500 |
| 4.00 | S I T C of Copper wound Transformer conforming to IS: 2026 & Losses as per Discom's CTL ( CTL Test certificate to be attached ) of rating 11/0.433KV Delta-Star Connected, Vector Group Dyn 11, standard accessories like conservator, silica gel breather, radiator, fins, HT bushing & LT cableboxes, Off -LTC (+/- 5% in steps of 2.5%) winding temperature rise of 50/55 C, ISI marked drain valve, Dial type Temperature gauge, first fill of oil, Epoxy based paint, including carrying of pre-commission Testing & Charging of Transformer. ( See table - 08 for CTL Losses ) Labor rate only | 4 | Each | 7,500 ₹30,000 | 100 ₹400 Lowest | 6,000 ₹24,000 | 1,000 ₹4,000 | 5,000 ₹20,000 |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
11 Jul 2022, 6:00 pmClosed
Executive Engineer
RSAMB Electric Division Jaipur
Improvement and Extension of Electrification work of individual connection at main mandi yard Surrajpole KUMS Jaipur (Grain)
2022_RSAMB_282471_1
RSAMB/Elec/NIT-05/2022-23
Open Tender
Electrical Works
Percentage
300 days
Jaipur
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
EE RSAMB Electric Division Jaipur
₹3.9 L
Yes
12 Jul 2022
21 Jun 2022
12 Jul 2022
21 Jun 2022
11 Jul 2022
21 Jun 2022
Amount
Supply installation testing & Commissioning of star rated Copper wound distribution Transformer ( All the distribution transformer must be star rated as per notification of (BEE) ministry of power, Goverenment of India) of following rating 11/0.433KV Delta-Star Connected, Vector Group Dyn 11, ONAN Cooled & as per BEE star level- 2 & BIS approved as per IS 2026-1977 & losses as defined as per IS 1180 part I 2014. including standard accessories like conservator, silica gel breather,Bucholz relay, radiator, fins, HT cable box & LT cable boxes, Off -LTC (+5% to - 10% @ 2.5%) temperature rise of 40 degree C in oil / 45 degree C in winding , ISI marked drain valve, Dial type Temperature gauge, first filling of transformer oil as per IS :335-1953 , Epoxy based paint, including carrying of pre-commission Testing & Charging of Transformer complete in all respect. NABL accredeated / CPRI/ ERDA lab testing reports with OEM certificate must submitted to engineer in charge .Transformer must be tested from CTL test lab of discom (if reqd.) before charging of transformer & complete installaion must be certified from Electrical Inspectorate office as per Indian Electricity rule, CTL testing charges & Inspection charges shall be reimbursed by the department to the contractor as per actual expenditure. Makes as per pre approval by Engineer in charge.
315 KVA Cu Wound
Supply and erection of hot dipped galvanised steel swaged tubular pole conforming to IS: 2713-1980 (part I to II) with galvanised base plate in position including excavation of the pit and filling the same with C.C. of M-20 grade (1:1.5:3) from base plate to 50cm above ground level, with the help of steel frame not less than 40 cm dia up to 114.3mm outer dia and 50 cm beyond 114.3mm outer dia around the pole. Duly finished with cement plaster, earthing terminals , cable entry, GI cable sleeve complete as required. The pole shall be galvanised using ISI mark seamless tube for structural purpose of following height & designation. ( See Table E - 09 for specs. )
9.0 Mtr. ( 410 SP - 28 ) Labor rate only
Supply and erection of P.C.C./R.C.C. pole as per REC manual no 15/1979 conforming to IS: 2905/1966 including excavation of pit and back filling with stone aggregate/boulders and soil in 0.45m consolidating each deposited layer of 0.45m by ramming and watering etc complete in all respect.
9.0 Mtr long (200 Kg ) as per Discom specification Labor rate only
S I T C of Copper wound Transformer conforming to IS: 2026 & Losses as per Discom's CTL ( CTL Test certificate to be attached ) of rating 11/0.433KV Delta-Star Connected, Vector Group Dyn 11, standard accessories like conservator, silica gel breather, radiator, fins, HT bushing & LT cableboxes, Off -LTC (+/- 5% in steps of 2.5%) winding temperature rise of 50/55 C, ISI marked drain valve, Dial type Temperature gauge, first fill of oil, Epoxy based paint, including carrying of pre-commission Testing & Charging of Transformer. ( See table - 08 for CTL Losses ) Labor rate only
Bidder Name
Amount
M/S R.S. ENTERPRISES(GSTN-08AVAPS4211N1ZE)
GANPATI COMMUNICATION SERVICES(GSTN-08AMAPG7177L1ZP)
M/S Anil Brothers(GSTN-08AHUPG5285A1Z6)
M/S Jindal Electricals(GSTN-08AEJPJ5458A1ZL)
POWER GEN ENGG CO(GSTN-08ACIPG4004C1Z9)
M/S R.S. ENTERPRISES
M/S Anil Brothers
POWER GEN ENGG CO
M/S Jindal Electricals
POWER GEN ENGG CO
M/S Jindal Electricals
M/S Anil Brothers
M/S R.S. ENTERPRISES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.84 MB
Tendernotice_2.pdf
PDF • 0.48 MB
Tendernotice_3.pdf
PDF • 0.34 MB
Tendernotice_4.pdf
PDF • 0.12 MB
BOQ_501693.xls
BOQ • 0.40 MB
Bid-Doc-Surajpole.pdf
Tender Documents • 1.70 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .