Tender ID
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
17 Mar 2026, 6:00 pmClosed
EE, ADA, Ajmer
ADA, Ajmer
Beautification Work at Chorasiyawas talab , Ajmer
2026_ADA_542040_1
56/2025-26 (1)
Open Tender
Civil Works
Percentage
180 days
ADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
ADA, Ajmer
₹7.4 L
Yes
17 Mar 2026
25 Feb 2026
18 Mar 2026
25 Feb 2026
17 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance including uprooting of rank vegetation, bushes, woods, trees and sapplings of girth upto 150mm and removal of rubbish etc. complete) | 27,400 | 100sqm | 99 | ₹27,12,600 |
| 2 | Construction of Embankment with Material Obtained from Borrow Pits.Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 , with lead 500mtr to 1000 mtr | 3,600 | Cum | 121 | ₹4,35,600 |
| 3 | Carriage of Material Earth, Sand, Lime, Morrum manure or sludge Add for each 1 Km beyond Ist Km (For 5 Km.) | 3,600 | Cum | 125 | ₹4,50,000 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 3,569 | Cum | 175 | ₹6,24,575 |
| 5 | Add extra rate for quantities of works, executed : In or under foul position , including pumping out water as required | 3,569 | Per Metre depth | 43.75 | ₹1,56,143.75 |
| 6 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 724.3 | Cum | 3,847 | ₹27,86,382.1 |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix
1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 86 | Cum | 4,915 | ₹4,22,690 |
| 8 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 1,819.2 | Cum | 3,182 | ₹57,88,694.4 |
| 9 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:4 ( 1-Cement : 4-Sand). | 912 | Cum | 3,824 | ₹34,87,488 |
| 10 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix | 240 | Cum | 4,934 | ₹11,84,160 |
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
1.pdf
Tender Documents • 12.63 MB
BOQ_966347.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .