Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 LAccepted-AOC 0 MATADIN KAKRAHI KAKRAHI BHARTHANA ETAWA ETAWAH UTTAR PRADESH 206242 | ETAWAH | UTTAR PRADESH | 206242 | ₹1.6 L Quoted ₹1.4 L | L-1 | Accepted-AOC Techno-commercially eligible L-1 bidder |
| 2 | L-2₹1.5 L+₹14,334.61 (10.4%)Rejected-Finance 0 LAXMI CONSTRUCTION PEEPAL MANDI BHOGAON MAINPURI UTTAR PRADESH 205001 | MAINPURI | UTTAR PRADESH | 205001 | ₹1.5 L+₹14,334.61 (10.4%) | L-2 | Rejected-Finance L-2 As per BOQ Summary details |
| 3 | L-3₹1.5 L+₹16,860.24 (12.2%)Rejected-Finance | ₹1.5 L+₹16,860.24 (12.2%) | L-3 | Rejected-Finance L-3 As per BOQ Summary details |
| 4 | L-4₹1.7 L+₹36,951.45 (26.8%)Rejected-Finance | ₹1.7 L+₹36,951.45 (26.8%) | L-4 | Rejected-Finance L-4 As per BOQ Summary details |
Tender Value
₹2.7 L
EMD Value
₹3,400
Closing Date
19 Jun 2026, 10:00 amClosed
Staff Officer (Civil), NK Area.
Office of the General Manager NK Area Dakra
Making 150 nos PCC Pillars on surface over the proposed depillaring CAMP-W-5 for the observation of subsidence during extraction of pillars at churi benti UG project under Churi Project,NK Area
2026_CCL_360909_1
SO(C)/NK/e-tender/26-27/89
Open Tender
Civil Works - Others
Percentage
30 days
Churi Project, NK Area
As per NIT
3 documents required · 3 mandatory
₹3,400
17 Jul 2026
8 Jun 2026
20 Jun 2026
9 Jun 2026
19 Jun 2026
9 Jun 2026
9 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 9.11 | Cum | 205.8 | ₹1,874.84 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:1.5:3 (1 Cement: 1.5 coarse sand (zone-Ill) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 15.19 | Cum | 7,907.55 | ₹1,20,115.68 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for: Columns, piers, abutments, pillars, posts and struts | 162 | Sqm | 651.5 | ₹1,05,543 |
| 4 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_373781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_373781.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .