| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹15.2 L+₹1.9 L (14.3%)Accepted-Finance | L2 | Accepted-Finance L2 | |
| 3 | L3₹16.0 L+₹2.7 L (20.3%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | L4₹18.5 L+₹5.2 L (38.8%)Accepted-Finance | L4 | Accepted-Finance L4 | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-tender fee not submitted |
Tender Value
Refer Docs
Closing Date
17 Sept 2022, 4:00 pmClosed
Executive Engineer Civil Division-II PDC Choglamsa
Executive Engineer Civil Division-II PDC Choglamsar
Construction of approach road along with edge wall on both the sides of road at Kharu substation leh
2022_PDNRE_7622_1
NIT-17 CD-II/PDC/L/2022-23
Open Tender
Civil Works - Roads
Item Rate
45 days
Kharu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Payable To Pay and Account Officer PDC Leh
Exempted
20 Sept 2022
13 Sept 2022
19 Sept 2022
13 Sept 2022
17 Sept 2022
13 Sept 2022
Amount
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soils A) Edge Wall
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including carriage of material from source to site of work
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m including carriage
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns including carriage upto site of work from source
Providing and filling of river bed materials on level for preparation of sub grade including compaction with road roller and carriage of materials upto the site of work from source (complete job)
M/S TSERING TUNDUP
M/S LOBZANG RIGZEN
M/S RINCHEN WANGCHUK GOVT CONTRACTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .