Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Fee/PreQual/Technical/Finance PLOT NO 5 E BLOCK 203 HARMONEY BLUE MOON ARUL MURUGAN NAGAR ZAMIN PALLAVARAM CHENNAI 600 117 | CHENGALPATTU | TAMIL NADU | 600117 | -30.30% | ₹5.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.3 L+₹72,609.48 (13.0%)Admitted-Fee/PreQual/Technical/Finance NA | NA | NA | 121004 | -21.23% | ₹6.3 L+₹72,609.48 (13.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.8 L+₹1.2 L (22.0%)Admitted-Fee/PreQual/Technical/Finance | -14.99% | ₹6.8 L+₹1.2 L (22.0%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.6 L+₹2.0 L (36.3%)Admitted-Fee/PreQual/Technical/Finance | -4.99% | ₹7.6 L+₹2.0 L (36.3%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.0 L
EMD Value
₹8,100
Closing Date
17 Sept 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
Z.O.XIV.C.NO.E1/6201/2026 Laying HDPE At In-between Block Disposal At Venkatesaperumal Street in Dn-188, U-42, Z-14.
2026_CoC_703562_1
Z.O.XIV.C.NO.E1/6201/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹8,100
18 Sept 2026
10 Sept 2026
18 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanica...2.40m Footing Depth. (including Refilling charges | 54 | CUM | 368.55 | ₹19,901.7 |
| 2 | Supplying and filling in foundation, basement,...tion and as directed by the departmental officers. | 9 | CUM | 252.32 | ₹2,270.88 |
| 3 | Providing and laying, spreading and compacting gra...es etc., complete as per clause 406 of MORTH Rev-5 | 23 | CUM | 2,709.1 | ₹62,309.3 |
| 4 | Providing And Laying In Position, Standarded Concr... The Department For The Excess Usage of Materials) | 9 | CUM | 9,028.08 | ₹81,252.72 |
| 5 | Construction of INSPECTION CHAMBER following ...per standard specification. CLEAR SIZE 0.60 X 0.60 | 13 | NOS | 6,071.23 | ₹78,925.99 |
| 6 | HDPE PIPES - PE 100 AS PER IS 4984/2016(Pre-Compounded Resin) | 150 | LS | 3,705.9 | ₹5,55,885 |
stage.html
html • 0.02 MB
finance_845663.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
6201.pdf
Tender Documents • 1.69 MB
BOQ_845663.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .