Loading…
Loading…
Tender Value
₹8.1 L
EMD Value
₹16,128
Closing Date
29 Aug 2026, 3:00 pm6d left
V P SARPANCH
V P Tamboxem Mopa Ugavem, Pernem - Goa
Ugradation of platform for Ganpati Visarjan and repairing of steps near Banyo Devasthan Bhatlewada Ugavem in Village Panchayat Tamboxem Mopa Ugavem, Pernem Goa.
2026_VP_31218_1
VP/TMU/PER/e-Tender Notice/2026-27/813
Open Tender
Civil Works
Percentage
120 days
V P Tamboxem Mopa Ugavem, Pernem - Goa.
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹5,000
₹16,128
20 Aug 2026
20 Aug 2026
31 Aug 2026
20 Aug 2026
29 Aug 2026
20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. a) All kinds of soil | 45 | Cum | 291 | ₹13,095 |
| 2 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 17.48 | Cu.m | 2,211 | ₹38,648.28 |
| 3Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering, shuttering and finishing : | |||||
| 3.01 | a) All works upto plinth level | 82.85 | Cu.m | 6,635 | ₹5,49,709.75 |
| 4Centering and shuttering including struttings, propping etc. and removal of formwork for : | |||||
| 5 | a) Foundations, footings, bases for columns and mass concrete. | 172 | Sqm | 407 | ₹70,004 |
| 6 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge B) 75 mm dia | 21 | RM | 185 | ₹3,885 |
| 7 | Refilling the pipeline/foundation trenches plinth sides, foundation etc. with available excavated earth in layers not exceeding 20 cm depth consolidating each layer ramming and watering lead upto 50 M and all lifts and disposal of surplus earth as directed by Engineer in Charge. | 20 | Cu.m | 245 | ₹4,900 |
| 8Supplying and fixing of Precast RCC slabs(factory made,the factory should be ISO certified and registered under Dirctorate of Industries, Govt. of India) at site in concrete Grade of M-25 with 20 mm nominal size Granitic or basaltic aggregate, consolidated by means of mechanical platform, vibration etc. with lifting hooks of M.s. 10mm bars and PVC cups including cost of reincforcement, Certificate from manufacturer shall be produced indicating grade of concret and minimum content of steel in the product along with 5 year free replacement warranty in case of breakage complete and as directed by Engineer -in -charge. | |||||
| 8.01 | b) Size 900 x 400 x 100 mm with steel reinforcement not less than 5.0 kgs per unit -12 T capacity | 20 | Each | 1,017 | ₹20,340 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_31612.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].