Tender Value
₹78.9 L
EMD Value
₹1.6 L
Closing Date
8 Jun 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
14 conditions · 2 needing a document upload
For works amounting Rs.50 lakhs and above: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any Telecom work involving provision of MIS/LAN/ WAN/ Helpline /UTS/ PRS / FOIS / value added enquiry system/video enquiry system/Data connectivity/ Datacom equipment / video conferencing / wireless communication/secured communication/Wi-Fi/ Telecom work involving computer based enquiry system.
9 conditions · 2 needing a document upload
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI, VIA, VIB, VI and Annexure-V and Annexure-V(A) of GCC-2022 respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are requested to go through the following documents which are available in upload/View Documents in Home page of IREPS portal for works tenders before submitting the e-tender. 1.General Instruction for E-Tenders on works contract--Chapter- I 2.Special Condition-General- Chapter-II
Opening of e-tender : 1. The e-tenders will be opened online using the IREPS portal anytime after tender closing time. No representative is required to be present for opening of e-tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders through the website after the opening of the tender. 2. The earnest money cost is to be paid through online banking facilities through the online portal and by giving the other details online on website www.ireps.gov.in. Note: For more details refer to Cl: 4 & 12 of General Instruction-Chapter-I for Submission of EMD, Cost of Tender Document and opening of e- tender.
Telecom work i/c/w the work (1)Asansol Division: Provision of Wi-Fi facility & Augmentation of LAN network in DRM office Asansol. (2) Creation of new crew lobby at Dumka.
14-SDSTE-ASN-2026-27
14-SDSTE-ASN-2026-27
Open
Works - General
18 Months
Paschim Bardhaman, West Bengal
₹0
₹1.6 L
8 Jun 2026
12 May 2026
25 May 2026
233 items across 4 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,00,584.5 | ||
| — | 6100.00 | — | — | ||
| Supply of CAT6 U/UTP Cable for Indoor use, 4-pair unshielded twisted pair (UTP) cable, FR PVC Jacket, High Density Polyethylene insulation, 23 AWG solid copper conductor for superior conductivity, Conductor diameter: 0.57 mm (23 AWG), supports Gigabit Ethernet (1000 Base-T) standard, Make -Molex/DLINK/similar, Inspection: Consignee. | — | — | — | 1,15,900 | |
| — | 1.00 | — | — | ||
| Supply of Optic Fibre Cable 6 Core(Single mode) armoured, as per TEC Spec. TEC/GR/OFC-02/03.Sep.2003 or latest, Make: FINOLEX CABLES LIMITED/Usha martin/STERLITE TECHNOLOGIES LIMITED/BIRLA CABLE LIMITED/similar, Inspection: Consignee. | — | — | — | 41,648 | |
| — | 20.00 | — | — | ||
| Jointing, terminating and Splicing of 24 Fibre Optical Fibre Cable and fixing of termination Box/FDF/Placing of joint clousers in pit required at various location including tranportation of all the jointing & terminating materials from railway store to the works site and returning leftover materials to the railway store. The rate should include all jointing materials. | — | — | — | 2,12,500 | |
| — | 1.00 | — | — | ||
| Shifting and installation of control and other telecom equipment like control phone, magneto phone, auto phone, VHF sets, VF Repeaters etc. from old station building/location to new station building/location as per instructions of site engineer. | — | — | — | 9,122 | |
| — | 0.50 | — | — | ||
| Supply of PLB-HDPE Duct for UG armoured Optical Fibre Cable diameter 40.0 mm, as per RDSO Specification No. RDSO/SPN/TC/45/2013 Revision 2.0 or latest, in length of 1000mtrs/roll. For each K.M. of HDPE duct pipe following items are to be supplied (a) end plugs-02nos., (b) cable sealing plugs-02nos., (c) plastic couplers slip fit/push fit type-02nos., (d) end plugs to be provided along with drum-02nos. MAKE: WESTERN/Gangotri/similar. Inspection: Consignee. | — | — | — | 31,433.5 | |
| — | 0.50 | — | — | ||
| Laying Of HDPE DUCT 40/33 mm in trenchs and protective works including pulling of single mode armoured OFC Cable( fibre) through duct in trenches as advised by site engineer. Note: (1)Contractor will take over the OFC cable from Railway store to site of work duly checked the continuity of each fiber from end to end (2) before & after cable laying of OFC cable through duct, continuity test from end to end of each fiber to be made by contractor to ensure availability of all fibers duly certified by the site enginner. | — | — | — | 12,367 | |
| — | 1.00 | — | — | ||
| — | 5.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCCCorrectionslip11.pdf
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf
ATTACHMENT
TenderDocument_SnT.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
GCC Correction Slip
ATTACHMENT
GCC Correction Slip2
ATTACHMENT
mergedGCCCorrectionslip3456.pdf
ATTACHMENT
2018-CE-I-CT-9dtd.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
AllAnnexure.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
Annexure-A.pdf
ATTACHMENT
CABLECUT_DiggingJPO_12.08.2024.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .