Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.6 LAccepted-AOC AT NAKEIPASI DANARA TALCHER ANGUL ODISHA PIN 759103 | ANUGUL | ODISHA | 759103 | ₹14.6 L Quoted ₹12.4 L | L1 | Accepted-AOC ACCEPTED BEING L1 EXCEPT ALL OTHER BIDDERS |
| 2 | L2₹12.4 LRejected-Finance | ₹12.4 L | L2 | Rejected-Finance REJECTED NOT BEING L1 |
| 3 | L3₹13.0 LRejected-Finance | ₹13.0 L | L3 | Rejected-Finance REJECTED NOT BEING L1 |
| 4 | L4₹13.7 LRejected-Finance | ₹13.7 L | L4 | Rejected-Finance REJECTED NOT BEING L1 |
| 5 | L5₹14.8 LRejected-Finance | ₹14.8 L | L5 | Rejected-Finance REJECTED NOT BEING L1 |
Tender Value
₹25.0 L
EMD Value
₹31,300
Closing Date
7 May 2026, 5:00 pmClosed
STAFF OFFICER CIVIL JAGANNATH AREA
Office of the General Manager MCL, Jagannath Area Po-Dera,Dist-Angul, Odisha-759103
Providing barbed wire fencing along proposed diversion of Bangaru Nallah from Barapali to KCC camp under AOCP, JA.
2026_MCL_358717_1
MCL/GM(JA)/SO(C)/e- Tender/26-27/09, Dtd-24/04/26
Open Tender
Civil Works - Others
45 days
ANANTA OCP
AS PER NIT
3 documents required · 3 mandatory
₹31,300
Yes
2 Jun 2026
25 Apr 2026
9 May 2026
27 Apr 2026
7 May 2026
27 Apr 2026
27 Apr 2026 - 5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 95.05 | cum | 217 | ₹20,626.61 | BI01010001010000000000000515BI0100001119 |
| 2 | providing and fixing RCC barbed fencing post of size 112x 100x2100 mm excluding tapped portion at top and tee at bottom of size 300x112x100 mm with steel reinforcement including carriage at site all etc complete as per instruction of EIC.(cost of earth works in excavation ,concrete work in foundation to be paid separately) | 2,347 | nos | 319.13 | ₹7,49,001.44 | BI01010001010000000000000515BI0100001130 |
| 3 | Providing and laying in position excluding cement concrete of level: specified grade the cost of centering and shuttering - All work up to plinth 1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 169.36 | cum | 5,910.35 | ₹10,00,974.04 | BI01010001010000000000000515BI0100001130 |
| 4 | Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire | 25,810 | M | 12.7 | ₹3,27,787 | BI01010001010000000000000515BI0100001139 |
| 5 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC | - | Nos | - | - | BI01010001010000000000000515BI0100001326 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.69 MB
Tendernotice_2.pdf
PDF • 1.53 MB
BOQ_371591.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid