Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
15 Oct 2026, 2:00 pm
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
14 conditions · 2 needing a document upload
For works amounting Rs.50 lakhs and above: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any Telecom work involving provision of MIS/LAN/ WAN/ Helpline /UTS/ PRS / FOIS / value added enquiry system/video enquiry system/Data connectivity/ Datacom equipment / video conferencing / wireless communication/secured communication/Wi-Fi/ Telecom work involving computer based enquiry system.
11 conditions · 4 needing a document upload
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI, VIA, VIB, VI and Annexure-V & Annexure- V(A) of GCC-2022 respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tenderers are requested to go through the following documents which are available in upload/View Documents in Home page of IREPS portal for works tenders before submitting the e-tender. 1.General Instruction for E-Tenders on works contract--Chapter- I 2.Special Condition-General- Chapter-II
Opening of e-tender : 1. The e-tenders will be opened online using the IREPS portal anytime after tender closing time. No representative is required to be present for opening of e-tender and taking notes of rates quoted and ranking as the complete details of rates etc. of all the bidders shall be available to the bidders through the website after the opening of the tender. 2. The earnest money cost is to be paid through online banking facilities through the online portal and by giving the other details online on website www.ireps.gov.in. Note: For more details refer to Cl: 4 & 12 of General Instruction-Chapter-I for Submission of EMD and opening of e-tender.
Asansol Division- Balance work i/c/w Telecom work at crew booking lobbies at Asansol, Andal, Madhupur, Raniganj, Durgapur Steel Exchange Yard, Pandabeswar, Sitarampur in connection with Safety Related Items over Asansol Division
65-SDSTE-ASN-2026-27~ER
65-SDSTE-ASN-2026-27
Open
Works - General
18 Months
Paschim Bardhaman, West Bengal
₹0
₹2.7 L
23 Sept 2026
23 Sept 2026
1 Oct 2026
163 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 3527748.90 Below/P | ||
| — | 16.85 | — | — | ||
| Laying Of HDPE DUCT 40/33 mm in trenchs and protective works including pulling of single mode armoured OFC Cable( fibre) through duct in trenches as advised by site engineer. Note: (1)Contractor will take over the OFC cable from Railway store to site of work duly checked the continuity of each fiber from end to end (2) before & after cable laying of OFC cable through duct, continuity test from end to end of each fiber to be made by contractor to ensure availability of all fibers duly certified by the site enginner. HDPE Duct colour shouldbe be Brown or Yellow or Pink in colour as per ER guidelines for HDPE duct laying attached. | — | — | — | 4,27,853.85 | |
| — | 15.00 | — | — | ||
| Supply of Splice Closure for Optical Fiber Cables Armoured and Metal free type OFC With screws sealing as per as per TEC/GR/TX/OJC-002/03/APR-2010, including all miscellaneous items & consumables for fiber splicing, make: 3M/Comscope/R&M/Drone Edge/similar, Inspection: Consignee. | — | — | — | 54,033.15 | |
| — | 8.00 | — | — | ||
| "Supply of basic material to construct unit maintenance free earth as per RDSO Specs. No RDSO/SPN/197 Ver.1.0 or latest and conforming to RDSO Drg. No. SDO / RDSO/ E&B/001 or Latest. Necessary testing certificate of UL, IEC to be produced. It consist of following: (a) Copper bonded steel electrode of 3.0 m long, 17.2 mm dia with copper bonding thickness of minimum macrons and UL listed and marked = 1 no. (b) Earth enhancement material supplied in sealed bags of minimum 10 kg = 3 nos. (c) Copper strip of 150x25x6 mm, to terminate earth rod = 1 no. (d) Copper strip of 300x25x6 mm (MEEB) = 1 no. (e) Copper strip of 150x25x6mm (SEEB) = 1 no. (ii) Supply of 35 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting main earth electrode to MEEB in the equipment room in duplicate.(minimum 10 meter) (iii) Supply of 16 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting MEEB to SEEB and SPD to MEEB (minimum 10 meter ) (iv) Supply of 10 sq. mm multi strand single core PVC insulated copper cable as per IS: 694 for connecting various equipment to SEEB (v) Supply of copper lug sleeve for 3/16 cable. Inspection: Consignee. " | — | — | — | 1,22,678.56 | |
| — | 8.00 | — | — | ||
| Installation of Unit Maintenance Free Earth as supplied in above item.It includes ( i ) Digging the earth to the required depth. (ii) Insertion of electrode. (iii) Filling of earth enhancing compound (Approx.30 Kg) (iv) Provision of exothermic weld connections to copper tape of 25 mm x 6 mm x 150 mm to the earth electrodes. All material tools and features required for weld will be arranged by contractor. (v) This also includes CC cover 1.5 ft x 1.5 ft. 1 ft wall thickness 2 inch with cover 3 inch thickness. Cables 35 Sq mm/ 16 Sq mm/10 sq mm for connecting earth to busbar, busbar to busbar and busbars to various equipments. Earth electrode of 17.20 mm dia and 3.00 meter long high tensile low carbon steel circular rods molecularly bonded with copper and outer surface (minimum copper bonding thickness of 250 micrones to made requirement of under writer's laboratories (UL) 4672007 or latest. Copper strips of 150 mm x 25 mm x 6 mm to be welded with each earth electrode, copper strips of 300 mm x 25 mm x 6 mm for main equippotential busbar, copper strips of 150 mm x 25 mm x 6 mm sub equip-potential busbar in relay room, power room and panel room. GI strip 25 mm x 2 mm for ring formation of earth pits Earth enhancement material in bags for each Earth Electrode. Inspection chamber of site 300 mm x 300 mm x 300 mm (Inside dimension) of approximate 50 mm thick with pulling hooks to cover the earth pits. Note: The installation of this item shall be carried out by the contractor as per RDSO Specs. No RDSO/SPN/197 Ver.1.0 or latest and conforming to RDSO Drg. No. SDO / RDSO/ E&B/001 or Latest | — | — | — | 53,284.64 | |
| — | 500.00 | — | — | ||
| Supply of GI pipe with threaded coller of 50mm nominal dia. (3.6mm thickness) as per IS Spec. No.IS:1239 Part-I: 2004, medium grade, perforated of required length. This includes supply of all materials required for fixing arrangement. At the ends of GI pipe, flexible/corrugated HDPE pipe will be provided by contractor to protect cables from sharp edges & sudden bends. Inspection: Consignee. | — | — | — | 2,04,505 | |
| — | 500.00 | — | — | ||
| Fixing of GI Pipe of required length at all road crossing/track crossing which fall on cable route & laying of telecom cable through them & also on bridge/below mettaled road/L- Xing/culvert/track crossing for laying of cable through it. This also includes installation of all materials required for fixing arrangement. At the ends of GI pipe, flexible/corrugated HDPE pipe will be provided by contractor to protect cables from sharp edges & sudden bends. | — | — | — | 51,945 | |
| — | 15.00 | — | — | ||
| Excavation of OFC pit for cable jointing of size 1.5m x 1.5m x 1.2 m for all type of soils. The section. Back filling the pit and ramming after jointing. Provision of brick walling the four walls and bottom of pit with RCC slab, back filling with earth and ramming as per drawing. N.B. all the materials including cement required for the above will be supplied by the tenderer. | — | — | — | 1,01,351.4 | |
| — | 200.00 | — | — | ||
| Supply of Disconnect Terminal Block, screw less type, 4-wire front entry (Two in-put & Two out-put) as per RDSO Spec.RDSO/SPN/189/2004, ver.3.0. The color will be decided by Engineer - in - Charge. (Preferably In Blue, Red & Grey Colors in the ratio of 1:2:3). Note: Material will be procurred from RDSO Approved vendor. Inspection: Consignee. | — | — | — | 11,136 | |
| — | 200.00 | — | — | ||
| Supply of End plate 2.5mm/0.091 in thick as per site requirement. Inspection: Consignee. | — | — | — | 2,024 | |
| — | 200.00 | — | — | ||
| Supply of End Stopper 10mm/0.0394 in width as per site requirement. Inspection: Consignee. | — | — | — | 2,024 | |
| — | 100.00 | — | — | ||
| Supply of Carrier Rails for above 35mm x 7.5mm, 1mm/0.039 in thickness un-slotted type as per site requirement. Inspection: Consignee. | — | — | — | 11,035 | |
| — | 300.00 | — | — | ||
| Termination of Outdoor Cables (Main Cables /tail cables) at both ends in location boxes, cable termination rack in OFC Room, relay room, station building, generator room etc. The item includes dressing of cables and wires with dressing threads as per standard practice. All fixing material required for this item will be supplied by contractor. The outdoor cable shall be terminated in OFC room, Relay Room, DG Room, ASM Room etc. under supervision and instructions issued by Engr. In-charge of the work. Inspection: Consignee. | — | — | — | 2,733 | |
| — | 20.00 | — | — | ||
| Jointing, terminating and Splicing of 24 Fibre Optical Fibre Cable and fixing of termination Box/FDF/Placing of joint clousers in pit required at various location including tranportation of all the jointing & terminating materials from railway store to the works site and returning leftover materials to the railway store. The rate should include all jointing materials. | — | — | — | 2,18,152.6 | |
| — | 100.00 | — | — | ||
| Cement concrete work for miscellaneous items in the ratio 1: 3: 6. Item includes excavation, ramming, curing and plastering with cement & sand mixture (aggregate not exceeding 3.8 cm.) (Aggregate cement & sand to be supplied by the contractor). Wherever depth of 0.5 m cable trench is not feasible, cable shall be protected as: - Preparation of cement mixture 1:3:6 with contractor's own materials and spreading cement concrete mixture layer of 100 mm thick over the already laid cables in the excavated trench. | — | — | — | 3,69,165 | |
| — | 600.00 | — | — | ||
| Transportation of HDT machine with accessories including handling of stores materials, preparation of site and boring (boring size upto 175mm) for laying of two (02) nos. Of 40mm HDPE pipes & two (02) nos. 50mm HDPE pipe or as per site engineer for placing and for crossing of signalling /telecom. Cable through HDPE pipe at bridges/ culverts/ track crossing/ pucca road crossing, boring trench shall be minimum 03 (three) meter below the river bed and 01(one) meter below the track/road/pucca road crossing area. This includes supply of permanently lubricated HDPE telecom. Ducts 40mm & 50mm (with chord) as per RDSO SPEC. NO. RDSO/SPN/TC/45/2013 REV. 2.0 with latest amendments or as per specification no. TEC GR. NO. G/CDS-08/02, NOV.2004 OR LATEST. For each km. of HDPE duct the following items are to be supplied (a) end plugs - 02 nos. (b) cable sealing plugs - 02 nos. (c) plastic couplers slip fit / push fit type - 02 nos. (d) end plugs to be provided along with drum - 02 nos. Note: - cost of fuel and all other items which will be required for laying of cable through HDPE pipe. The work shall be executed as per site engineer. | — | — | — | 10,67,880 | |
| — | 2.00 | — | — | ||
| Supply, installation and complete indoor wiring of 19 inch (42U) covered Rack of size 2035 mm x 600 mm x 600 mm (Approx.). Casters Set of 4:1, Adjustable Levelers set of 4: 1, Glass Door-600-42U Front: 1, Vented Steel Door-42-600: 1, Side Panels-1000-42U-Vented: 2, Mounting Hardware-(Pack of 20): 1, FHU with 4 FAN 360CFM: 1, Vertical Power Distribution Unit with 12 x 5/15 sockets Round Pin, 230 Volts AC, 32 Amp with Plug : 1, Horizontal Cable Manager-1U-Loop: 1, make: Dlink/similar. Inspection: Consignee. | — | — | — | 76,071.74 | |
| — | 2.00 | — | — | ||
| Supply of standard 19"rack mountable , -48V DC working, Add-Drop STM-4 SDH equipment conforming to GR No. TEC/GR/TX/SDH - 010/03.Jan 2011 (with latest amendment) complete with redundant power supply, 2 no. STM 4 of aggregate L.4.2 Optical interface modules/Cards one each for East and west side, TX/RX and 2 nos. of STM-1 S 1.1 optical interface modules complete with 5 mtrs long optical fibre cords, 21 E1s with DDFs and cable assembly for termination to DDF and minimum 8 nos. of 10/100 Base-T Ethernet ports, Fast Ethernet on SDH [EoS] 10/100 Base-I interface module/card supporting with LCAS and GEP, order wire sub Rack DDF installation material, manuals and other accessories. Complete Engineering order wire (EOW) arrangement. Necessary/Firmware for local/remote monitoring/configuration of the equipment through EMS and Software/Firmware interface to work all Network elements as Gateway Network Element [GNE], 2 nos of MCBs of appropriate rating and necessary connecting cords and cables for power supply modules. Inspection: Consignee. | — | — | — | 4,03,396.86 | |
| — | 1.00 | — | — | ||
| Supply of portable work station to run along with configuration tools, data input, simulation and functional testing, diagnostics and trouble shooting. Confuguration: 13th Generation Intel Core i5-1334U (10 cores, up to 4.60 GHz), Operating System: Windows 11 Home, Single Language, Graphics Card: Intel UHD Graphics, Display: 15.6", Non-Touch, FHD, 120Hz, WVA, IPS, Anti-Glare, 250 nits, Memory: 16GB, 16GBx1, DDR4, 2666 MT/s, Storage: 512GB M.2 PCIe NVMe Solid State Drive, with Microsoft Office Home 2024 , Primary Battery: 3-Cell Battery, 41WHr (Integrated), Wireless Connectivity: Realtek Wi-Fi 6 RTL8852BE, 2x2, 802.11ax, MU-MIMO, Bluetooth wireless card, Camera: min.720p at 30 fps HD RGB camera, Ports: 1 USB 3.2 Gen 1 (5 Gbps) port, 1 USB 2.0 (480 Mbps) port, 1 USB 3.2 Ge, Stereo speakers with Realtek ALC3204 Audio Controller, 2 W x 2 = 4 W total, Stereo speakers with Realtek ALC3254 Audio Controller, 2 W x 2 = 4 W total, with all accessories. model: Dell 15 Laptop/similar, make: Dell/HP/Similar, Inspection: Consignee. | — | — | — | 83,946.18 | |
| — | 2.00 | — | — | ||
| Supply of Transmission Measuring Set/Kit along with all Standard accessories as per RDSO Specn. No.IRS: TC- 43/87 or latest. Detailed specification is attached as per Annexure-A, make: Aplab/similar, Model: 2031A/similar, Inspection: Consignee. | — | — | — | 37,803.02 | |
| — | 10.00 | — | — | ||
| — | 10.00 | — | — | ||
| — | 10.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
mergedGCCCorrectionslip3456.pdf
ATTACHMENT
GCC_April-2022.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
2018-CE-I-CT-9dtd.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
TESTINGANDCERTIFICATIONOFTELEGRAPH.pdf
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf
ATTACHMENT
GCCCorrectionslip11..pdf
ATTACHMENT
ALLANNEXURENEW.pdf
ATTACHMENT
JPO_telecompolicycircular108_cableroutemarker.pdf
ATTACHMENT
CABLECUT_DiggingJPO_12.08.2024.pdf
ATTACHMENT
TECHNICALCIRCULAR-124-HDPEColour.pdf
ATTACHMENT
TELE-BOX-QuadTerminationBox_2025latest.pdf
ATTACHMENT
Annexure-A_1.pdf
ATTACHMENT
CREWLOBBY_1.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .