Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LQualified NO 40 3RD FLOOR UNIPUNCH PRIDE SECOND MAIN ROAD AMBATTUR INDUSTRIAL ESTATE AMBATTUR TIRUVALLUR TAMIL NADU 600058 INDIA | CHENNAI | TAMIL NADU | 600058 | L1 | Qualified MSE, MII, Category: General | |
| 2 | L2₹3.1 L+₹1,000 (0.32%)Qualified PLOT NO 21 22 BLOCK NO 24 PHASE 4 MR K PRAKASH BABU AUTO NAGAR GUNTUR ANDHRA PRADESH GUNTUR ANDHRA PRADESH 522002 | GUNTUR | ANDHRA PRADESH | 522002 | L2 | Qualified MSE, MII, Category: General | |
| 3 | L3₹7.5 L+₹4.4 L (142.7%)Qualified 535 UDYOG VIHAR PHASE V GURUGRAM HARYANA 122016 | L3 | Qualified MSE, MII, Category: General |
Tender Value
Refer Docs
EMD Value
Exempted
Closing Date
17 Nov 2025, 11:00 amClosed
Retro - Fit Emission Control Equipment for Diesel Generators (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6859488 Dated : 12-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : STN CDR AIR FORCE STATION MOHANBARI
Department of Military Affairs
Indian Air Force
Ministry of Defence (Air Force Public Fund Account)
8552402
GEM/2025/B/6859488
Two Packet Bid
Retro - Fit Emission Control Equipment for Diesel Generators (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
60 days
Dibrugarh
Total value wise evaluation
PRODUCT
2 documents required · 2 mandatory
Exempted
12 Nov 2025
12 Nov 2025
17 Nov 2025
Retro - Fit Emission Control Equipment for Diesel Generators (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3
-- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6859488 Dated : 12-11-2025 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : STN CDR AIR FORCE STATION MOHANBARI
Department of Military Affairs
Indian Air Force
Ministry of Defence (Air Force Public Fund Account)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8552402.pdf
GEM_BID
tec_ecd_f94d6068-eedf-4e03-a56c1762403981171_Oiclpmohan.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .