Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-Finance | ₹4.4 L | L1 | Accepted-Finance LOWEST RATE QUOTED |
| 2 | L3₹4.7 L+₹34,334 (7.88%)Accepted-Finance | ₹4.7 L+₹34,334 (7.88%) | L3 | Accepted-Finance HIGHER RATE QUOTED |
| 3 | L2₹4.5 L+₹14,224 (3.26%)Rejected-Finance | ₹4.5 L+₹14,224 (3.26%) | L2 | Rejected-Finance HIGHER RATE QUOTED |
| 4 | L4₹5.1 L+₹74,634 (17.1%)Rejected-Finance | ₹5.1 L+₹74,634 (17.1%) | L4 | Rejected-Finance HIGHER RATE QUOTED |
| 5 | L5₹7.3 L+₹2.9 L (66.6%)Rejected-Finance | ₹7.3 L+₹2.9 L (66.6%) | L5 | Rejected-Finance HIGHER RATE QUOTED |
Tender Value
₹5 L
EMD Value
₹25,000
Closing Date
24 Jan 2020, 10:30 amClosed
Commandant Supply Depot ASC Trimulgherry
Supply Depot ASC Trimulgherry, Secunderabad
Supply, Installation and maintenance of 10 KWP grid connected online Rooftop Solar Power Project at Fresh Issue Shed, Golconda, Hyderabad
2020_ARMY_313407_1
119/10KWP/ACCTS
Open Tender
Solar Power Plants
Supply
45 days
Supply Point Golconda
As per Tender documents
6 documents required · 6 mandatory
₹0
₹25,000
Yes
Supply Depot ASC Trimulgherry, Secunderabad
27 Jan 2020
10 Jan 2020
24 Jan 2020
10 Jan 2020
24 Jan 2020
10 Jan 2020
10 Jan 2020 - 18 Jan 2020
21 Jan 2020
Supply, installation and maintainance of 10 KWP grid connected online Rooftop Solar Power Project including defect liability period of 24 months and items/ services as per Para 1 of Part II of RFP
ASTHRA PROJECTS
SABITA ENTERPRISES
saurashakthi
Fisco Energy Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .