Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.8 LAccepted-Finance | L1 | Accepted-Finance LOW BID | |
| 2 | L2₹19.7 L+₹88,206.80 (4.69%)Rejected-Finance NA | NA | NA | 121004 | L2 | Rejected-Finance HIGH BID | |
| 3 | L3₹22.5 L+₹3.8 L (20.0%)Rejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | L3 | Rejected-Finance HIGH BID | |
| 4 | L4₹22.1 L+₹3.3 L (17.6%)Rejected-Finance PURAINA PURE HIMANCHAL HOUSE NO 123 MALAON PARASPUR GONDA | GONDA | UTTAR PRADESH | 271001 | L4 | Rejected-Finance HIGH BID |
| Sl No | Description | Qty | Unit | Pankaj Kumar Singh L4 | M/S J AND V INFRATECH PRIVATE LIMITED L3 | skyhomes infracon L1 | M/s BSA CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in excavation of foundation in hard dry canker mix soil (SOR irrig.-ch.V s.no.2) | 110.87 | cum | 102 ₹11,308.74 | 99.96 ₹11,082.57 | 75 ₹8,315.25 Lowest | 100 ₹11,087 |
| 2.00 | E/W Excavation in ordinary soil in foundation of wing wall, crest,etc. (SOR irrig.-ch.VI s.no.2+9a) | 163.21 | cum | 105 ₹17,137.05 | 102.9 ₹16,794.31 | 75 ₹12,240.75 Lowest | 105 ₹17,137.05 |
| 3.00 | C.C. Work in 1:3:6 Cement Sand & Stone ballast (25-50mm)including cost of material Labour T&P etc. | 79.94 | cum | 9,714 ₹7,76,537.16 | 9,519.72 ₹7,61,006.42 | 8,100 ₹6,47,514 Lowest | 8,500 ₹6,79,490 |
| 4.00 | Stone Masonry (RCR) work in 1:4 Cement/Sand mortar including the cost of material,labour and T&P etc. | 66.33 | cum | 9,701 ₹6,43,467.33 | 9,506.98 ₹6,30,597.98 | 8,100 ₹5,37,273 Lowest | 8,500 ₹5,63,805 |
| 5.00 | R.R. Stone masonry (25-40 kg) work 1:4 cement sand mortar including the cost of material labour etc. | 55.97 | cum | 9,461 ₹5,29,532.17 | 9,271.78 ₹5,18,941.53 | 7,900 ₹4,42,163 Lowest | 8,200 ₹4,58,954 |
| 6.00 | Struck/Raised Pointing in 1:2 C/S Mortar including cost of material , Labour etc. | 96.74 | m² | 183 ₹17,703.42 | 179.34 ₹17,349.35 | 155 ₹14,994.7 Lowest | 180 ₹17,413.2 |
| 7.00 | Plaster work in 1:3 Cement & C/Sand mortar with all charges | 28.35 | SQM | 335 ₹9,497.25 | 328.3 ₹9,307.31 | 280 ₹7,938 Lowest | 320 ₹9,072 |
| 8.00 | C.C.Work in 1:2:4 Cement Sand & Dalla Grit (10-20mm) | 17.41 | cum | 12,134 ₹2,11,252.94 | 11,891.32 ₹2,07,027.88 | 10,100 ₹1,75,841 | 10,000 ₹1,74,100 Lowest |
| 9.00 | Stone Boulder Filling (25-40)kg | 6.89 | cum | 4,649 ₹32,031.61 | 4,556.02 ₹31,390.98 | 3,875 ₹26,698.75 Lowest | 4,300 ₹29,627 |
| 10.00 | Photography | 3 | Nos | 500 ₹1,500 | 490 ₹1,470 Lowest | 500 ₹1,500 | 500 ₹1,500 |
Tender Value
₹26.7 L
EMD Value
₹2.7 L
Closing Date
14 Jul 2026, 5:00 pmClosed
Executive Engineer MI Divi Ayodhya
Office Of Executive Engineer Minor Irrigation Division Ayodhya Adress Near Dewa Hospital Bara ramna Haidarganj Faizabad District Ayodhya
Construction OF Khevrajpur Checkdam On Kamauli drain Block Dariyabad District Barabanki 225001
2026_UPMID_1165987_1
704/MI/Account/Nivida/2026-27 Date 20-06-2026
Open Tender
Civil Works
Item Rate
120 days
Construction OF Khevrajpur Checkdam
AS PER NIT
2 documents required · 2 mandatory
₹854
Executive Engineer Minor Irrigation Div. Ayodhya
₹2.7 L
Office Of Executive Engineer MI Divi Ayodhya
26 Sept 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
14 Jul 2026
6 Jul 2026
11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in excavation of foundation in hard dry canker mix soil (SOR irrig.-ch.V s.no.2) | - | cum | 102 | - |
| 2 | E/W Excavation in ordinary soil in foundation of wing wall, crest,etc. (SOR irrig.-ch.VI s.no.2+9a) | - | cum | 105.5 | - |
| 3 | C.C. Work in 1:3:6 Cement Sand & Stone ballast (25-50mm)including cost of material Labour T&P etc. | 1 | cum | 9,714 | ₹9,704.29 |
| 4 | Stone Masonry (RCR) work in 1:4 Cement/Sand mortar including the cost of material,labour and T&P etc. | 1 | cum | 9,701 | ₹9,691.3 |
| 5 | R.R. Stone masonry (25-40 kg) work 1:4 cement sand mortar including the cost of material labour etc. | 1 | cum | 9,461 | ₹9,451.54 |
| 6 | Struck/Raised Pointing in 1:2 C/S Mortar including cost of material , Labour etc. | 1 | m² | 183 | ₹182.82 |
| 7 | Plaster work in 1:3 Cement & C/Sand mortar with all charges | - | SQM | 335 | - |
| 8 | C.C.Work in 1:2:4 Cement Sand & Dalla Grit (10-20mm) | - | cum | 12,134 | - |
| 9 | Stone Boulder Filling (25-40)kg | 1 | cum | 4,649 | ₹4,644.35 |
| 10 | Photography | - | Nos | 500 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
Document.pdf
Tender Documents • 1.28 MB
BOQ_2186848.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .