GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Barat Ghar and Boundary Wall in Village-Ajay Nagar, YEA. WC-06
2026_YEIDA_1155182_6
YEA/GM(PROJECT)/2026/512 DT-27/05/2026
Open Tender
Civil Works
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹940
₹68,920
2 Jun 2026
2 Jun 2026
15 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in all type of foundation trenches including dressing of the side and ramming of bottom. Lifts upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m. All kinds of soil. (MORTH/A.R./YEIDA/Based on UPPWD/SOR-2020)) Depth from 0.0 to 1.5 M below G.L. | - | Cum | 1 | - |
| 2 | Sand filling in plinth including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from 'the site of work and including watering, dressing etc. labour and T&P etc. required for the proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a of cleared.50 M. out side the periphery of area distance (UPPWD/SOR-2020/255) | 1 | Cum | - | - |
| 3 | Cement concrete with 4cm gauge approved stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, tools & plants etc. required for proper completion of the work. (UPPWD/SOR-2020/281) | 1 | Cum | - | - |
| 4 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mm nominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth. | 1 | sqm | 1 | ₹1 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more./Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020)) | - | Kg. | 1 | - |
| 6 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. (DAR/5.33.1/Based on UPPWD/SOR-2020)) | - | Cum | 1 | - |
| 7 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. “(Note:- Cement content considered in this item is @ 330 kg/cum.“Excess/ less cement used as per design mix is payable/recoverable separately). | - | Cum | 1 | - |
| 8.01 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 1 | sqm | - | - |
| 8.02 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 1 | sqm | 1 | ₹1 |
| 8.03 | Centering and shuttering including strutting, propping etc. and removal of form for all heights : Columns, Pillars, Piers, Abutments, Posts and Struts.(DAR/5.9.7/Based on UPPWD/SOR-2020)) | 1 | sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.76 MB
6.pdf
Tender Documents • 1.38 MB
BOQ_2163988.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid