Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 28 7 CHITABARANATHAPURAM 1ST STREET DEVAKOTTAI SIVAGANGAI DISTT | DEVAKOTTAI | SIVAGANGAI | TAMIL NADU | Admitted-Finance |
| 2 | Admitted-Finance RAMANATHAPURAM | RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | TIRUCHIRAPPALLI | TAMIL NADU | 621308 | Not Admitted-Fee/PreQual/Technical EMD Not Furnished |
Tender Value
Refer Docs
EMD Value
₹69,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector (Dev), RDDA, Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.TVD-1/AGAMT 2021-22 of Thiruvadanai Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242143_1
R7/5593/2021/dated 05.07.2022 TVD1
Open Tender
Civil Works
Item Rate
180 days
RDDA
Refer Tender Document
6 documents required · 6 mandatory
₹0
₹69,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
Amount
Deepening of Palaiyuran Enthal Oorani with construction of Inlet, Outlet and Bathing ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Sluice
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Collection and Supply of Sand gravel mix 1:1 (one sand and one gravel) ratio for basement / filter zone including stacking, mixing and spreading the sand gravel mix in layers of not exceeding in 150 mm thickness over properly prepared surface, watering an
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Providing steel centring for RCC slabs,beams or plain surfaces including strutting 3m height usingMS sheet ,BG .10 gauge thick of size 90 x60cm BG 10 gauge stiffened with MS angles of size 25 x 25 x 3mm laid over silver oak joists of size 10cm 6.50cm
cement concrete 1:2:4 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying, Laying, Jointing and fixing in position of R.C.C. Hume pipes of NP 3 class of 900 mm. Dia with suitable collars including labour charges and jointing materials, etc., complete complying with standard specification and as directed by the departm
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including breaking clods watering and compaction using Power Roller to atleast 95% of Proctor Density at OMC in each layer and
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Pooniakuttivayal habitation, Deepening of Poonaikuttivayal oorani with construction of Inlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Retaining wall
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
cement concrete 1:3:6 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Mudukkuvayal habitation, Mudukkuvayal kali kovil oorani with construction of Inlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Retaining wall
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
cement concrete 1:3:6 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Manavanagari habitation, Deepening of Pillayarkovil oorani with construction of Inlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:3:6 using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Solaganpettai habitation, Deepening of Chellathal kovil oorani with construction of Inlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Retaining wall
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
cement concrete 1:3:6 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Melakottai habitation, Deepening of Sonaiyakovil oorani with construction of Inlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Retaining wall
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
cement concrete 1:3:6 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Mugilthagam habitation, Deepening of Thirukulam oorani with construction of Inlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Suchani habitation, Deepening of Suchani oorani with construction of Inlet and Bathing Ghat
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Anjukottai habitation, Deepening of Sokkara (Karuppan kovil) oorani with construction of Inlet,Outlet and Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Retaining wall
Earth work excavating and depositing on bank with a initial lead of 10 m & initial lift of 2 m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size of boulders hard gravelly soil com
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
cement concrete 1:4:8 using 40 mm iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
cement concrete 1:3:6 using 20 mm nominal size iss HBG Stone jelly including cost and conveyance of all materials and all labour charges etc complete
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Pottakottai habitation, Deepening of Sokku oorani with construction of Bathing Ghat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Clearing light jungles and clearing away carefully along tank bund and burning it including all labour charges etc.
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete(page24-54/1)
Construction of Inlet
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Sand filling with dry river sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 40mm HBG metal including cost and conveyance of all materials to work site and all labour charges etc.complete
Supply and cost of 750mm dia Hume Pipe including collar & all charges,etc. complete
Construction of Bathing Ghat
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification.
Sand filling with M.sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement three M.sand and six hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Cement Concrete 1:2:4 (One cement two M.sand and four 20mm HBG stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
KOP & CO
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .