Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 LAccepted-Finance | ₹1.5 L | 1 | Accepted-Finance Bidder quoted Less
Bidder quoted Less Then Estimate Value |
| 2 | 2₹1.5 LRejected-Finance | ₹1.5 L | 2 | Rejected-Finance Bidder quoted More Then Estimate Value |
| Sl No | Description | Qty | Unit | Sri Veeramathiamman Constructions L2 | Ehan Construction L1 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete. | 5 | 1M3 | 200 ₹1,000 | 200 ₹1,000 |
| 2.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stones and andTen hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick well rammed, consolidated and including curing etc.complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means. | 4 | 1M3 | 5,545 ₹22,180 | 5,540 ₹22,160 |
| 3.00 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification. | 1.35 | 1Qtl | 9,480 ₹12,798 | 9,475 ₹12,791.25 |
| 5.00 | CementConcrete1:11/2:3(OneCement,OneandahalfcrushedstonesandandThreehardbrokenstonejelly)using20mmgaugehardbrokengranitestonejellyforallRCCitemsofworksexcludingcostofreinforcementgrillandfabricatingchargescenteringandshutteringbutincludingSuperPlasticiser,mixingchargesformachinemix,laying,vibratingwithmechanicalvibrators,finishing,curing,etc.andprovidingfixtureslikefanclampsintheRCCfloor/roofslabswherevernecessaryandbearingsurfacesofwalls,beamsetc.shallbefinishedsmoothwithCementMortar1:3(OneCementandThreeSand)andkraftpaperlaidoveritwithoutclaimingextra,etc.,completecomplyingwithstandardspecificationandas directed by the departmental officers - machine mix | 5 | 1M3 | 9,145 ₹45,725 | 9,140 ₹45,700 |
| 6.00 | Pavingthefloorwithfinepolishedcuddapahstoneslaboffollowingthicknessovercementmortarbedof20mmthickinCementMortar1:3(OneCementandThreecrushedstoneSand)withrequiredCementSlurryandMortarPlasticizerandpointingthejointstofulldepthofslabswithsamemortarmixedwithblackoxideandthetopsurfacerenderedsmooth,curing,etc.,completecomplyingwithstandardspeicificationandasdirectedbythedepartmentalofficers.(ThecuddapahstoneslabsandothermaterialstobeusedshallbegotapprovedbytheExecutiveEngineerconcernedbeforeuseonwork)-Cuddapah Slab of 20 to 30mm thick / 38 to 40mm thick / 50mm thick | 29 | 1M2 | 1,500 ₹43,500 | 1,440 ₹41,760 |
| 7.00Add G.S.T. @ 18% | |||||
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
13 Feb 2026, 3:00 pmClosed
Assitant Commissioner
Zone 1, Tiruppur City Municipal Corporation
Maintenance and Repair Work of Motor Room at Olapalayam in Ward No 22
2026_MAWS_650420_30
E1/01/2026
Open Tender
Civil Works
90 days
Zone 1, Tiruppur City Municipal Corporation
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,000
8 Apr 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
Earthwork excavation for foundation in all soils and sub soils except in hard rock requiring blasting and depositing on bank with initial lead of 10m and initial lift of 2m inclusive of shoring, shuttering, bailing out water wherever necessary, refilling the foundation with excavated earth other than sandy soil in layers of not more than 150mm thick layers well rammed and depositing the surplus earth within the compound in place shown by the departmental officers and clearing and levelling the site etc,. complete.
Cement Concrete 1:5:10 (One Cement, Five crushed stones and andTen hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick well rammed, consolidated and including curing etc.complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means.
Supplying, fabricating and placing in position of Steel Reinforcement using Mild Steel or Ribbed Tor steel bars for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete complying with standard specification.
CementConcrete1:11/2:3(OneCement,OneandahalfcrushedstonesandandThreehardbrokenstonejelly)using20mmgaugehardbrokengranitestonejellyforallRCCitemsofworksexcludingcostofreinforcementgrillandfabricatingchargescenteringandshutteringbutincludingSuperPlasticiser,mixingchargesformachinemix,laying,vibratingwithmechanicalvibrators,finishing,curing,etc.andprovidingfixtureslikefanclampsintheRCCfloor/roofslabswherevernecessaryandbearingsurfacesofwalls,beamsetc.shallbefinishedsmoothwithCementMortar1:3(OneCementandThreeSand)andkraftpaperlaidoveritwithoutclaimingextra,etc.,completecomplyingwithstandardspecificationandas directed by the departmental officers - machine mix
Pavingthefloorwithfinepolishedcuddapahstoneslaboffollowingthicknessovercementmortarbedof20mmthickinCementMortar1:3(OneCementandThreecrushedstoneSand)withrequiredCementSlurryandMortarPlasticizerandpointingthejointstofulldepthofslabswithsamemortarmixedwithblackoxideandthetopsurfacerenderedsmooth,curing,etc.,completecomplyingwithstandardspeicificationandasdirectedbythedepartmentalofficers.(ThecuddapahstoneslabsandothermaterialstobeusedshallbegotapprovedbytheExecutiveEngineerconcernedbeforeuseonwork)-Cuddapah Slab of 20 to 30mm thick / 38 to 40mm thick / 50mm thick
Add G.S.T. @ 18%
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.01 MB
BOQ_781372.xls
BOQ • 0.35 MB
29.pdf
Tender Documents • 0.34 MB
Download all tender documents and submit your bid