| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹91.6 LAdmitted-Finance | -36.92% | ₹91.6 L | L1 | Admitted-Finance |
| 2 | L2₹95.1 LAdmitted-Finance | -34.55% | ₹95.1 L | L2 | Admitted-Finance |
| 3 | L3₹96.0 LAdmitted-Finance | -33.89% | ₹96.0 L | L3 | Admitted-Finance |
| 4 | L4₹96.2 LAdmitted-Finance | -33.77% | ₹96.2 L | L4 | Admitted-Finance |
| 5 | L5₹96.8 LAdmitted-Finance | -33.33% | ₹96.8 L | L5 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
9 Mar 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Construction of Transit Accommodation at Zewan Srinagar (Macadamization work of internal roads)
2026_PWDJK_304409_1
Nit-91e-/2025-26/13544-49 dtd.24-02-2026
Open Tender
Civil Works
15 days
Zewan Srinagar
as Per Nit
2 documents required · 2 mandatory
₹2,600
Executive Engineer RNb Dalgate DIvision Sgr
₹2.9 L
24 Mar 2026
24 Feb 2026
10 Mar 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
Providing, laying, spreading and compacting graded stone aggregate (size range 53mm to 0.075mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge.
Providing and applying tack coat using hot straight run bitumen of grade VG-10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit on bitumen boiler, cleaning and preparing the existing road surface as per specifications.
a) On WMM/WBM surface @ 0.40 Kg/Sqm.
b) On WBM surface @ 0.75 Kg/Sqm
Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specification to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-charge. 50mm compacted thickness with bitumen of grade VG-10 @ 3.50% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity including all carriages complete.
Providing and laying 25mm thick semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25mm compacted thickness with bitumen of grade VG-10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity.
Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. (6mm thick seal coat)
Providing and laying Dense Graded Bituminous Macadam using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge. 50 to 100 mm average compacted thickness with bitumen of grade VG-30 @5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 40/50 mm compacted thickness with bitumen of grade VG-30 @ 5.5% (percentage by weight of total mix) and lime filler @ 3% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Providing and applying 2.5mm thick road marking strips (retro-reflective) of specified shade / colour using hot thermoplastic material by fully / semi automatic thermoplastic paint applicator machine fitted with profile shoe, glass beads dispenser, propane tank heater and profile shoe heater, driven by experienced operator on road surface including cost of material, labour, T&P cleaning the road surface of all dirt, seals, oil, grease and foreign material etc complete as per direction of EIC and accordance with applicable specifications.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.39 MB
BOQ_988825.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid