Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC SHIVNANDANPUR BISHRAMPUR DISTT SURAJPUR CG | ₹4.1 L | L1 | Accepted-AOC Being L1. |
| Sl No | Description | Qty | Unit | ARUN KUMAR SINGH L1 |
|---|---|---|---|---|
| 1.00 | Site cleaning | 27 | cum | 594 ₹16,038 Lowest |
| 2.00 | Groove cutting In stone in floor | 5.83 | cum | 7,644 ₹44,564.52 Lowest |
| 3.00 | Brick work in cement mortar (1:6) up to 1.5m from floor | 31.1 | cum | 3,353 ₹1,04,278.3 Lowest |
| 4.00 | 12 mm Cement Plaster up to 5 mtr above from floor level (1:6) | 91.8 | sqm | 475 ₹43,605 Lowest |
| 5.00 | Loading the material in to tub | 33.82 | cum | 346 ₹11,701.72 Lowest |
| 6.00 | Unloading of material at destination in UG | 33.82 | cum | 230 ₹7,778.6 Lowest |
| 7.00 | Bricks: class design 35 fly Ash Bricks | 15,550 | 1000 Nos | 5.35 ₹83,192.5 Lowest |
| 8.00 | Sand : (Coarse) | 18.43 | cum | 1,243 ₹22,908.49 Lowest |
| 9.00 | Cement (incl. transportation) | 45.48 | Bag | 354 ₹16,099.92 Lowest |
| 1000000.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - |
Tender Value
₹3.8 L
EMD Value
₹4,800
Closing Date
27 Apr 2026, 5:00 pmClosed
GENERAL MANAGER Oprn.
GM OFFICE SECL BISHRAMPUR AREA.
Construction of 09Nos. Of Cross Over Bridge along belt conveyor at 1L/2Dip Jn., 8L/2Dip Jn.,19L/2Dip Jn.28L/2Dip,3 8L/2Dip Jn., 50L/2Dip Jn. and 57L East/2Dip Jn.of Seam-1 Combined including material cost at Gayatri UG Mine of Bishrampur Area.
2026_SECL_358389_1
GM/BSPR/GMO/Srvy/e-tender/ 2026-27/02 dt.15.04.26
Open Tender
Civil Works - Roads
Item Rate
120 days
GAYATRI UG MINE OF SECL BISHRAMPUR AREA
AS PER NIT.
4 documents required · 4 mandatory
₹4,800
12 Jun 2026
16 Apr 2026
28 Apr 2026
16 Apr 2026
27 Apr 2026
17 Apr 2026
16 Apr 2026 - 20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site cleaning | - | cum | 545.18 | - |
| 2 | Groove cutting In stone in floor | - | cum | - | - |
| 3 | Brick work in cement mortar (1:6) up to 1.5m from floor | - | cum | 3,076.46 | - |
| 4 | 12 mm Cement Plaster up to 5 mtr above from floor level (1:6) | - | sqm | 435.83 | - |
| 5 | Loading the material in to tub | - | cum | - | - |
| 6 | Unloading of material at destination in UG | - | cum | 211.64 | - |
| 7 | Bricks: class design 35 fly Ash Bricks | - | 1000 Nos | 4.94 | - |
| 8 | Sand : (Coarse) | - | cum | 1,141.18 | - |
| 9 | Cement (incl. transportation) | - | Bag | 325.16 | - |
| 1000000 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Tendernotice_2.pdf
PDF • 0.30 MB
BOQ_371268.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .