Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 2 | L1₹1.2 CrAdmitted-Finance | ₹1.2 Cr | L1 | Admitted-Finance |
| 3 | L2₹1.3 Cr+₹1.3 L (1.02%)Admitted-Finance | ₹1.3 Cr+₹1.3 L (1.02%) | L2 | Admitted-Finance |
| 4 | L3₹1.3 Cr+₹8.4 L (6.80%)Admitted-Finance | ₹1.3 Cr+₹8.4 L (6.80%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | N.Rajasekaran L2 | R BALA SHANMUGAM L1 | MANIKANDAN N L3 | GVR ASSOCIATES L1 |
|---|---|---|---|---|---|---|---|
| 1.00Part 1 : Strengthening of the Road from Chettinaickenpatty Arunachalam Nagar Road KM 0/0 - 1/350 - Estimate Rs.57.35 lakhs | |||||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | 1,620 | Sqm | 5 ₹8,100 | 4.1 ₹6,642 Lowest | 5 ₹8,100 | 4.1 ₹6,642 Lowest |
| 3.00 | Picking the existing metal surface | 1,687.5 | Sqm | 20 ₹33,750 | 15.31 ₹25,835.63 Lowest | 29 ₹48,937.5 | 15.31 ₹25,835.63 Lowest |
| 4.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | |||||||
| 5.00 | Km 0/0-1/0 | 468.75 | Cum | 1,801.63 ₹8,44,514.06 Lowest | 1,801.63 ₹8,44,514.06 Lowest | 2,000 ₹9,37,500 | 1,801.63 ₹8,44,514.06 Lowest |
| 6.00 | Km 1/0-1/350 | 164.06 | Cum | 1,801.63 ₹2,95,575.42 Lowest | 1,801.63 ₹2,95,575.42 Lowest | 2,000 ₹3,28,120 | 1,801.63 ₹2,95,575.42 Lowest |
| 7.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,062.5 | Sqm | 62.33 ₹3,15,545.63 Lowest | 62.33 ₹3,15,545.63 Lowest | 70 ₹3,54,375 | 62.33 ₹3,15,545.63 Lowest |
| 8.00 | Applying TACK COAT over Primed WBM surface at 2.50Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 5,062.5 | Sqm | 20 ₹1,01,250 | 13.15 ₹66,571.88 Lowest | 20 ₹1,01,250 | 13.15 ₹66,571.88 Lowest |
| 9.00 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete | 5,062.5 | cum | 195.31 ₹9,88,756.88 Lowest | 195.31 ₹9,88,756.88 Lowest | 300 ₹15,18,750 | 195.31 ₹9,88,756.88 Lowest |
| 10.00 | Collection and supply of garted earth frame approved average lead | 972 | No | 80 ₹77,760 | 76.49 ₹74,348.28 Lowest | 76.49 ₹74,348.28 Lowest | 76.49 ₹74,348.28 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
10 Feb 2021, 3:00 pmClosed
THE PROJECT DIRECTOR DRDA, DINDIGUL
THE PROJECT DIRECTOR DRDA, DINDIGUL
Dindigul Dist - SCPAR 2020-2021- Dindigul block TN-05-08 road works
2021_RDTN_193476_1
DIPR/333/Tender/2021 TN-05-08 Dindigul
Open Tender
Civil Works - Roads
Item Rate
180 days
DINDIGUL
Dindigul Dist - SCPAR 2020-2021- Dindigul block TN-05-08 road works
5 documents required · 5 mandatory
₹0
₹1.3 L
17 Feb 2021
3 Feb 2021
10 Feb 2021
3 Feb 2021
10 Feb 2021
3 Feb 2021
Amount
Part 1 : Strengthening of the Road from Chettinaickenpatty Arunachalam Nagar Road KM 0/0 - 1/350 - Estimate Rs.57.35 lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking the existing metal surface
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.50Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Collection and supply of garted earth frame approved average lead
Supply of Kilommetre stone of size 1.65 x 0.45 x 0.15 metre
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Construction of Drainage CH 0/6
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Refilling the basement with excavated earth behind the Abutment & inbetween the wings including all labour charges etc., complete
Construction of Drainage CH 1/0-1/2
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS rod or RTS bar will be supplied departmentally at section stores and cost will be recoverd at issue rate). the binding wire shall supplied by the contactor.
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works including cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Plastering with Cement mortar 1:5 mix to 20mm thick including cost and conveyance of all materails & all labour charges etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Part 2: Strengthening of the Road from MM Kovilur road to Koganginaickenpatty Link road Kutchampatty km 0/0-1/4 Estimate Amount Rs.67.84 lakhs
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.50Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 13.432Kg of Bitumen with 1.168 Kg of Plastic waste for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete
Collection and supply of garted earth frame approved average lead
Supply of Kilommetre stone of size 1.65 x 0.45 x 0.15 metre
Supply of Hectametre stone of size 0.90 x 0.15 x 0.15 metre
Construction of Flood Protection Wall ch 0/0-1/4
Earth Work excavation for foundation in all soils and to full depth as may as be directed in hard rock requiring plastering but inclusive of shorting, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth as per SS20B
CC 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (For Foundation)
Supplying and erecting centering are strutting including neceassary supports for place surface for RCCcolumns fottings and pedestal beems crtitical pears erc., using mild steel angles of sizes 90x60x10cm gauge stiffness welded mild steel angles of sizes
CC 1:3:6 mix using 40mm ISS HBG metal including cost and conveyance of materials and all labour charges etc., (for Below sill)
Provision for Name board
Provision for Sign board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
R BALA SHANMUGAM
N.Rajasekaran
MANIKANDAN N
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .